Block 0562, lot 007
2442 Broadway
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 3
- Rooms
- 7 bathrooms
- Building
- 7,586 sq ft
- Lot
- 6,115 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2022 | Completed final sign-off Mar 2023 | 2440 Broadway | Ben Rogne Construction | revise issued permit with plans. app #202208231034. to change railing system with top rail to no top rail. reference esr report no. 3842Details
revise issued permit with plans. app #202208231034. to change railing system with top rail to no top rail. reference esr report no. 3842 | |
| Aug 23, 2022 | Completed final sign-off Mar 2023 | 2440 Broadway | Ben Rogne Construction | remove existing metal and glass railings at rear balconys. replace in kind with glass lamina te, 42" high, 2 railings, 1 at 2440 broadway, 1 at 2442 broadwayDetails
remove existing metal and glass railings at rear balconys. replace in kind with glass lamina te, 42" high, 2 railings, 1 at 2440 broadway, 1 at 2442 broadway | $60,000 |
| Nov 27, 2019 | Expired or cancelled cancelled Feb 2022 | 2440 Broadway | Noa Construction Llc | rear addition at basement & 1st flr of approx 23' into rear yard w/ a roof deck at 2nd flr, excavation at basement of approx 8', a rear addition at 2nd flr of approx 9' into rear yard w/ a roof deck at 3rd flr & interior reconfigurations at basement, 1st, 2nd & 3rd flrs. comply to maher ord# 155-13,Details
rear addition at basement & 1st flr of approx 23' into rear yard w/ a roof deck at 2nd flr, excavation at basement of approx 8', a rear addition at 2nd flr of approx 9' into rear yard w/ a roof deck at 3rd flr & interior reconfigurations at basement, 1st, 2nd & 3rd flrs. comply to maher ord# 155-13, | $500,000 |
| Oct 23, 2015 | Expired or cancelled cancelled Feb 2019 | 2440 Broadway | interior renovation & rear horizontal addition for larger living & kitchen areas. ** maher: compliance with ordinance no# 155-13 not required **Details
interior renovation & rear horizontal addition for larger living & kitchen areas. ** maher: compliance with ordinance no# 155-13 not required ** | $500,000 | |
| Jun 16, 2011 | Completed final sign-off Aug 2011 | 2440 Broadway | Ggd Inc. | replace (e) non conforming guardrails at (e) upper unit and middle unit decks with new guardrails with steel and glass at rear of building on 3rd and 4th floorsDetails
replace (e) non conforming guardrails at (e) upper unit and middle unit decks with new guardrails with steel and glass at rear of building on 3rd and 4th floors | $5,000 |
| Apr 27, 2011 | Completed final sign-off Dec 2011 | 2440 Broadway | Ggd Inc. | modifications to the rear yard of an (e) 3 unit residential building to include a new deck, patios, retaining walls & landscaping irrigation & landscape lighting to be design/buildDetails
modifications to the rear yard of an (e) 3 unit residential building to include a new deck, patios, retaining walls & landscaping irrigation & landscape lighting to be design/build | $50,000 |
| Apr 26, 2011 | Completed final sign-off Dec 2011 | 2440 Broadway | Ggd Inc. | addition of a roof deck and exterior stair to the upper unit of existing 4 story, 3 unit residential building. renovation of existing mep system to be design build. e fire sprinkler system installed by previous owner. modifications to e fire sprinler system to be design buildDetails
addition of a roof deck and exterior stair to the upper unit of existing 4 story, 3 unit residential building. renovation of existing mep system to be design build. e fire sprinkler system installed by previous owner. modifications to e fire sprinler system to be design build | $40,000 |
| Feb 7, 2011 | Completed final sign-off Dec 2011 | 2440 Broadway | Ggd Inc. | modification to the rear yard of an (e) 3 unit residential building to include new deck & convenient rear stairway (not for means of egress).Details
modification to the rear yard of an (e) 3 unit residential building to include new deck & convenient rear stairway (not for means of egress). | $150,000 |
| Oct 6, 2010 | Never finaled issued Oct 2010, no final | 2440 Broadway | Madden Plumbing, Llc | relocate (2) spklr heads & add (6) new heads on 2nd floor onlyDetails
relocate (2) spklr heads & add (6) new heads on 2nd floor only | $1,500 |
| Aug 27, 2010 | Completed final sign-off Mar 2011 | 2440 Broadway | Design Line Construction | modifications to rear elevation at first floor and interior renovations to first floor of (e)residential building. structural modifications in garage, new stair connecting first floor storage space to lower unit, conversion of 1st floor storage to family room, home office and bathroom.Details
modifications to rear elevation at first floor and interior renovations to first floor of (e)residential building. structural modifications in garage, new stair connecting first floor storage space to lower unit, conversion of 1st floor storage to family room, home office and bathroom. | $50,000 |
| Jun 22, 2010 | Completed final sign-off Mar 2011 | 2440 Broadway | Design Line Construction | interior renovation to the basement, garage, lower unit, and middle unit. work to include new storage spaces at basement, new acoustical ceiling assemblies and modifications to lower unit bathroom, powder room and kitchen.Details
interior renovation to the basement, garage, lower unit, and middle unit. work to include new storage spaces at basement, new acoustical ceiling assemblies and modifications to lower unit bathroom, powder room and kitchen. | $40,000 |
| Mar 24, 2010 | Never finaled issued Mar 2010, no final | 2440 Broadway | street space | ||
| Feb 8, 2010 | Never finaled issued Mar 2010, no final | 2444 Broadway | Madden Plumbing, Llc | add 8-(n) sprinkler heads in closets & bathroom in unit#3 only. ref. appl.#200912173396.Details
add 8-(n) sprinkler heads in closets & bathroom in unit#3 only. ref. appl.#200912173396. | $1,600 |
| Dec 17, 2009 | Completed final sign-off Mar 2011 | 2440 Broadway | interior renovation to the upper unit including kitchen & bthrooms, replace rear windows "in-kind", new 1.5 bathrooms, new skylights.Details
interior renovation to the upper unit including kitchen & bthrooms, replace rear windows "in-kind", new 1.5 bathrooms, new skylights. | $100,000 | |
| May 18, 2009 | Completed final sign-off May 2009 | 2440 Broadway | to obtain final inspection for work approved under pa#200510145583. all work is complete.Details
to obtain final inspection for work approved under pa#200510145583. all work is complete. | ||
| Apr 19, 2006 | Never finaled issued Apr 2006, no final | 2440 Broadway | street space | ||
| Feb 17, 2006 | Never finaled issued Feb 2006, no final | 2440 Broadway | street space permit only. | ||
| Jan 13, 2006 | Completed final sign-off May 2006 | 2440 Broadway | remove e piers and posts at e basement. replace with concrete foundation and steel beamsDetails
remove e piers and posts at e basement. replace with concrete foundation and steel beams | $10,000 | |
| Oct 27, 2005 | Completed final sign-off May 2006 | 2440 Broadway | Chen's Plumbing Inc | rough in and install sprinkler system for entire building total 84 heads new fire meterDetails
rough in and install sprinkler system for entire building total 84 heads new fire meter | $23,000 |
| Oct 14, 2005 | Expired or cancelled expired May 2009 | 2440 Broadway | install curb cut, driveway & garage door construct 2 balconies. install (n) elevator in (e) elevator shaft.Details
install curb cut, driveway & garage door construct 2 balconies. install (n) elevator in (e) elevator shaft. | $25,000 | |
| Oct 11, 2005 | Never finaled issued Oct 2005, no final | 2440 Broadway | street space | ||
| Aug 15, 2005 | Completed final sign-off May 2006 | 2440 Broadway | add shower at 3/fl,unit 2440.install elevator shaft only.const approx 16' wall at bsmt.Details
add shower at 3/fl,unit 2440.install elevator shaft only.const approx 16' wall at bsmt. | $32,000 | |
| Jul 21, 2005 | Completed final sign-off May 2006 | 2440 Broadway | install steel beam @basement & shear walls,add shower & toilet @1/f &2/f,add 1/2 bath @2/f,enlargeDetails
install steel beam @basement & shear walls,add shower & toilet @1/f &2/f,add 1/2 bath @2/f,enlarge | $35,000 | |
| Jun 13, 2005 | Completed final sign-off May 2006 | 2440 Broadway | unit#2440 & 2442-replace bath fixtures,plaster,lath,tub,toilet,replace kitchen cabinets & counters,Details
unit#2440 & 2442-replace bath fixtures,plaster,lath,tub,toilet,replace kitchen cabinets & counters, | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ggd Inc. (4), Ben Rogne Construction (2), Design Line Construction (2), Madden Plumbing, Llc (2), Chen's Plumbing Inc, Noa Construction Llc
- Architects
- Michael Hennessey (5), Brian Milford, Robert Edmonds, Sven Lavine
- Engineers
- Double D Engineering, Parrick Buscovich
- Authorized agents
- Michael Hennessey, Patrick Buscovich
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.