Block 2035A, lot 027
1 Sheldon Ter
- City’s use
- Single Family Residential
- Built
- 1966
- Stories
- 2
- Units
- 1
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 3,937 sq ft
- Lot
- 7,148 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2022 | Never finaled issued Apr 2022, no final | 1 Sheldon Tr | D K G Construction Inc | demo and replace 150 sqft of stucco and plywood. not visible from street.Details
demo and replace 150 sqft of stucco and plywood. not visible from street. | $3,000 |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 1 Sheldon Tr | D K G Construction Inc | infill existing kitchen window. not visible from streetDetails
infill existing kitchen window. not visible from street | $2,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2016 | 1 Sheldon Tr | D K G Construction Inc | kitchen & bathroom renovation at upper unit only. replace existing skylight w/new. replace second unit front facade windows with alumuinum material windows in kind.Details
kitchen & bathroom renovation at upper unit only. replace existing skylight w/new. replace second unit front facade windows with alumuinum material windows in kind. | $100,000 |
| Apr 16, 2015 | Completed final sign-off Aug 2015 | 1 Sheldon Tr | H D Construction | add 1 full bath in family roomDetails
add 1 full bath in family room | $12,000 |
| Feb 19, 2015 | Completed final sign-off Aug 2015 | 1 Sheldon Tr | H D Construction | remodeling 1 bathroom add spot lights, add wet bar, small wall textured by mudding, repaint whole unit, refinishing hardwood floor.Details
remodeling 1 bathroom add spot lights, add wet bar, small wall textured by mudding, repaint whole unit, refinishing hardwood floor. | $18,000 |
| Aug 18, 2008 | Completed final sign-off Sep 2008 | 1 Sheldon Tr | Mike Ferrell Construction | replace 3 decks in kind as per plans. replace tilt up garage door with roll up type door.Details
replace 3 decks in kind as per plans. replace tilt up garage door with roll up type door. | $20,000 |
| Sep 12, 2005 | Never finaled issued Sep 2005, no final | 1 Sheldon Tr | A A A General Roofing Co | reroofingDetails
reroofing | $9,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D K G Construction Inc (3), H D Construction (2), A A A General Roofing Co, Mike Ferrell Construction
- Architects
- Robert Edmonds
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.