John Yadegar
- Listed as
- architect, engineer
- Firm
- John Yadegar & Assoc.
- Based in
- Oakland
- On San Francisco permits
- Feb 2005 to Jan 2020
54 permits since 2000 (engineer on 53 permits, architect on 1 permit): 48 completed, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2020 | Completed final sign-off Aug 2020 | 1560 Turk St | Mulhall Construction Inc. | revision to pa 2017-0406-3415 using steel channels @ collectors @ bldg exterior to replace steel straps soft storyDetails
revision to pa 2017-0406-3415 using steel channels @ collectors @ bldg exterior to replace steel straps soft story | $10,000 |
| Jan 6, 2020 | Completed final sign-off Aug 2020 | 1520 Turk St | Mulhall Construction Inc. | revision to pa 2017-0406-3414 using steel channels @ collectors @ bldg exterior to replace steel straps soft storyDetails
revision to pa 2017-0406-3414 using steel channels @ collectors @ bldg exterior to replace steel straps soft story | $5,000 |
| May 30, 2019 | Completed final sign-off Sep 2019 | 1133 Fell St | Steelcore Builders Inc | rev to pa# 201710201834; this project involves seismic strengthening measures to comply with the san francisco soft story ordinance design per iebc appx.a-4Details
rev to pa# 201710201834; this project involves seismic strengthening measures to comply with the san francisco soft story ordinance design per iebc appx.a-4 | |
| May 30, 2019 | Completed final sign-off Aug 2019 | 1801 Hayes St | Steelcore Builders Inc | rev to pa# 201708255974; this project involves seismic strenthening measures to comply with the san francisco soft story oridnace design per iebc appex. a-4Details
rev to pa# 201708255974; this project involves seismic strenthening measures to comply with the san francisco soft story oridnace design per iebc appex. a-4 | |
| May 2, 2019 | Completed final sign-off Aug 2019 | 959 Haight St | Steelcore Builders Inc | revision to soft story pa #201710100804. for modification of moment frames and shearwalls.Details
revision to soft story pa #201710100804. for modification of moment frames and shearwalls. | $26,000 |
| Apr 25, 2019 | Completed final sign-off Apr 2019 | 1137 Montgomery St | Steelcore Builders Inc | field revision set for changes to moment frame & stron walls details to pa# 201611303803, this project involves seismic strengthing measures to comply with the sf soft story ordinance design per iebx approx a-4Details
field revision set for changes to moment frame & stron walls details to pa# 201611303803, this project involves seismic strengthing measures to comply with the sf soft story ordinance design per iebx approx a-4 | |
| Nov 29, 2018 | Completed final sign-off Nov 2020 | 307 03rd Av | Pacific Engineering & Construction Inc. | seismic strengthening measures to comply with sf soft story ordinance. design per iebc app a4 (commercial)Details
seismic strengthening measures to comply with sf soft story ordinance. design per iebc app a4 (commercial) | $100,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2022 | 5031 Geary Bl | Pacific Engineering & Construction Inc. | commercial soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref residential soft story 201809140215. comply with the soft story program; maher n/aDetails
commercial soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref residential soft story 201809140215. comply with the soft story program; maher n/a | $48,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2021 | 2390 Lombard St | Pacific Engineering & Construction Inc. | commercial soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref residential soft story 201809140209. maher n/aDetails
commercial soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref residential soft story 201809140209. maher n/a | $49,000 |
| Sep 14, 2018 | Completed final sign-off Oct 2022 | 5029 Geary Bl | Pacific Engineering & Construction Inc. | residential soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref commercial soft story 201809140216. comply with soft story program maher n/aDetails
residential soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref commercial soft story 201809140216. comply with soft story program maher n/a | $60,000 |
| Jun 8, 2018 | Completed final sign-off May 2019 | 116 Moreland St | Blue Mountain Construction Services Inc | revision to pa 2016-0915-7821 separating concrete footing to not interrupt entryway; soft story retrofit per sfebc chapter 4d; 2016cebc appendix a-4Details
revision to pa 2016-0915-7821 separating concrete footing to not interrupt entryway; soft story retrofit per sfebc chapter 4d; 2016cebc appendix a-4 | |
| Jan 19, 2018 | Completed final sign-off Sep 2022 | 1522 Howard St | D Kelly Construction Inc. | to comply with nov #201721371. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher naDetails
to comply with nov #201721371. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher na | $40,000 |
| Jan 2, 2018 | Completed final sign-off Sep 2019 | 5645 Diamond Heights Bl | Blue Mountain Construction Services Inc | seismic stregthening measures to comply with sf soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4Details
seismic stregthening measures to comply with sf soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4 | $30,000 |
| Jan 2, 2018 | Completed final sign-off Sep 2019 | 185 Arbor St | Blue Mountain Construction Services Inc | seismic stregthening measures to comply with sf soft story ord. design per iebc appx a4Details
seismic stregthening measures to comply with sf soft story ord. design per iebc appx a4 | $45,000 |
| Jan 2, 2018 | Completed final sign-off Sep 2019 | 305 Arbor St | Blue Mountain Construction Services Inc | seismic stregthening measures to comply with sf soft story ord. design per iebc appx a4Details
seismic stregthening measures to comply with sf soft story ord. design per iebc appx a4 | $15,000 |
| Jan 2, 2018 | Completed final sign-off Jul 2019 | 365 Arbor St | Blue Mountain Construction Services Inc | seismic stregthening measures to comply with sf soft story ord. design per iebc appx a4Details
seismic stregthening measures to comply with sf soft story ord. design per iebc appx a4 | $45,000 |
| Oct 4, 2017 | Completed final sign-off Dec 2018 | 15 Guerrero St | Lordan Construction | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $53,000 |
| Oct 4, 2017 | Completed final sign-off Oct 2018 | 2694 Bush St | Seismic Retrofitters Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $70,000 |
| Oct 4, 2017 | Completed final sign-off Dec 2018 | 21 Guerrero St | Lordan Construction | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $53,000 |
| Sep 22, 2017 | Expired or cancelled expired Jan 2023 | 811 Ashbury St | Sean Kelly Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $85,000 |
| Sep 15, 2017 | Completed final sign-off Jan 2019 | 70 Moffitt St | Blue Mountain Construction Services Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. landslide program.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. landslide program. | $30,000 |
| Sep 15, 2017 | Completed final sign-off Sep 2019 | 5441 California St | Steelcore Builders Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $92,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 530 Lake St | Steelcore Builders Inc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $85,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 1447 Chestnut St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4 2016. plywood, shear walls have been added or strengthened and concrete foundations have been added.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4 2016. plywood, shear walls have been added or strengthened and concrete foundations have been added. | $105,000 |
| Jun 2, 2017 | Completed final sign-off Dec 2019 | 228 Diamond St | Beyond The Horizon Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $87,000 |
| May 22, 2017 | Completed final sign-off Mar 2018 | 2206 Greenwich St | Steelcore Builders Inc | residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. commercial pa under 201705227296Details
residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. commercial pa under 201705227296 | $10,000 |
| May 22, 2017 | Completed final sign-off Mar 2018 | 3201 Fillmore St | Steelcore Builders Inc | commercial - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. residential under pa 201705227297Details
commercial - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. residential under pa 201705227297 | $10,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2019 | 1625 Eddy St | Mulhall Construction Inc. | seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4.Details
seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4. | $195,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 1225 Steiner St | Mulhall Construction Inc. | seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4.Details
seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4. | $222,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2019 | 1675 Eddy St | seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4.Details
seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4. | $194,000 | |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 1560 Turk St | Mulhall Construction Inc. | seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4.Details
seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4. | $129,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 1520 Turk St | Mulhall Construction Inc. | seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4.Details
seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4. | $222,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 1150 Pierce St | Mulhall Construction Inc. | seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4.Details
seismic strengthening measures to comply with the sf soft story ordinance per sfbc chapter 34b, 2012 iebc appendix a-4. | $149,000 |
| Jan 23, 2017 | Completed final sign-off Sep 2017 | 2534 Polk St | Steelcore Builders Inc | soft story retrofit per sfbc chapter 34b engineering criteria: 2016iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2016iebc appendix a-4 | $44,000 |
| Jan 11, 2017 | Completed final sign-off Apr 2018 | 1340 Taylor St | soft story retrofit per sfbc chapter 34b engineering criteria: 2016 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2016 iebc appendix a-4 | $40,000 | |
| Dec 29, 2016 | Expired or cancelled withdrawn Apr 2019 | 179 Castro St | renovation of unoccupied level for addition of (2) adu's; work includes lowering of level 1, stair modifications, addition of kitchens & bathrooms, minor window modificaiton, removal & replacement of interior partitions, doors & finishes. sprinkler/alarm deferred.Details
renovation of unoccupied level for addition of (2) adu's; work includes lowering of level 1, stair modifications, addition of kitchens & bathrooms, minor window modificaiton, removal & replacement of interior partitions, doors & finishes. sprinkler/alarm deferred. | $55,000 | |
| Dec 29, 2016 | Never finaled issued Jan 2018, no final | 179 Castro St | seismic strenthening measures to comply w/ the san francisco soft story ordinance. design per iebc appendix a-4Details
seismic strenthening measures to comply w/ the san francisco soft story ordinance. design per iebc appendix a-4 | $28,920 | |
| Dec 15, 2016 | Completed final sign-off Jul 2020 | 707 Haight St | Bedrock Construction | soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 | $39,400 |
| Nov 30, 2016 | Completed final sign-off Apr 2019 | 1137 Montgomery St | soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 | $51,000 | |
| Nov 30, 2016 | Completed final sign-off Jul 2017 | 431 Noe St | Steelcore Builders Inc | chimney removal, partial foundation replacement. voluntary strengthening @ basement level.Details
chimney removal, partial foundation replacement. voluntary strengthening @ basement level. | $10,000 |
| Nov 15, 2016 | Expired or cancelled withdrawn Feb 2020 | 2844 Lyon St | soft story retrofit per sfbc chapter 34b engineering criteria for 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria for 2012 iebc appendix a-4 | $95,000 | |
| Apr 29, 2016 | Completed final sign-off Aug 2017 | 85 Carl St | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. n/a for maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4. n/a for maher | $25,000 | |
| Jan 16, 2015 | Completed final sign-off Feb 2016 | 3580 21st St | Gelling & Judd Inc. | revision to app#201011305785. revision to structural work on 4th floor, supporting new stair and landing previously permitted under app#201011305785.Details
revision to app#201011305785. revision to structural work on 4th floor, supporting new stair and landing previously permitted under app#201011305785. | |
| Aug 25, 2014 | Completed final sign-off Feb 2016 | 58 Harper St | remodel of single family home, to include excavation to establish level ground floor and new rear patio. replace all windows on front facade in kind with aluminum clad double-hung windows. work includes kitchen & bath remodel. new gas fireplace.Details
remodel of single family home, to include excavation to establish level ground floor and new rear patio. replace all windows on front facade in kind with aluminum clad double-hung windows. work includes kitchen & bath remodel. new gas fireplace. | $400,000 | |
| Mar 26, 2014 | Completed final sign-off Sep 2014 | 139 Townsend St | Fisher Development Inc | addition of 2 (flat)new skylights on the rooftop of a 5-story building. ** maher: compliance with ordinance no# 155-13 not required **Details
addition of 2 (flat)new skylights on the rooftop of a 5-story building. ** maher: compliance with ordinance no# 155-13 not required ** | $30,000 |
| Jan 10, 2013 | Completed final sign-off Nov 2014 | 2440 Vallejo St | Matarozzi/Pelsinger Builders Inc. | interior renovation of kitchen, baths, new finishes. addition of framing at (e) living room per plan.Details
interior renovation of kitchen, baths, new finishes. addition of framing at (e) living room per plan. | $40,000 |
| Jan 7, 2013 | Completed final sign-off Nov 2014 | 2440 Vallejo St | Matarozzi/Pelsinger Builders Inc. | exterior renovations to include window and door changes at front and back, modify (e) bay, window replacement, addition of crown at front and rear, new stucco finishDetails
exterior renovations to include window and door changes at front and back, modify (e) bay, window replacement, addition of crown at front and rear, new stucco finish | $20,000 |
| Feb 17, 2012 | Completed final sign-off Mar 2012 | 150 Valencia St | Angotti & Reilly Inc. | refer to pa# 2012-0124-2771-add steel stringers at (e) roof trusses for light fixture supportDetails
refer to pa# 2012-0124-2771-add steel stringers at (e) roof trusses for light fixture support | $6,500 |
| Jan 10, 2012 | Completed final sign-off Dec 2012 | 1840 Clement St | Adam Knowles Construction | change of use from restaurant to stained glass workshop.ground floor tenant improvement only. new front entry storefront door, new footings, columns, beam for upper floor support. new skylights, new partitions, finishes, and skylights. new ada compliant restroom and entry.Details
change of use from restaurant to stained glass workshop.ground floor tenant improvement only. new front entry storefront door, new footings, columns, beam for upper floor support. new skylights, new partitions, finishes, and skylights. new ada compliant restroom and entry. | $25,000 |
| Mar 4, 2008 | Never finaled issued Mar 2008, no final | 2685 18th Av | this is a revision to the existing permit (2007/1214/0549) we are reducing the number of piers and tie backs from 10 to 8. (increased spacing to 10'-0")Details
this is a revision to the existing permit (2007/1214/0549) we are reducing the number of piers and tie backs from 10 to 8. (increased spacing to 10'-0") | ||
| Dec 1, 2006 | Completed final sign-off Dec 2006 | 1119 Greenwich St | revision to appl#200507221839Details
revision to appl#200507221839 | ||
| Sep 13, 2006 | Expired or cancelled expired Nov 2008 | 611 Folsom St | revision pa# 200408030542, for approval of structural slab supporting generator. generator separate permit.Details
revision pa# 200408030542, for approval of structural slab supporting generator. generator separate permit. | $15,000 | |
| Feb 22, 2006 | Completed final sign-off Jan 2007 | 832 Alabama St | enlarge existing bathrooms, replace existing rear stairs, replace existing post & footing foundation at rear with new continuous concrete foundation.Details
enlarge existing bathrooms, replace existing rear stairs, replace existing post & footing foundation at rear with new continuous concrete foundation. | $50,000 | |
| Feb 14, 2005 | Completed final sign-off Jun 2005 | 614 08th Av | replace existing garage floor slab on garage & lower slab from 0" at front of garage to 18" max.Details
replace existing garage floor slab on garage & lower slab from 0" at front of garage to 18" max. | $25,000 |