Block 0941, lot 024
2844 Lyon St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 3
- Units
- 12
- Rooms
- 12 bedrooms, 16 bathrooms
- Building
- 10,950 sq ft
- Lot
- 4,603 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2025 | Completed final sign-off Mar 2025 | 2844 Lyon St | Halyard Inc | recommencement and completion of work approved under 202002144579Details
recommencement and completion of work approved under 202002144579 | $85,000 |
| Aug 29, 2024 | Completed final sign-off Jan 2025 | 2844 Lyon St | North Star Plumbing & Fire Protection | as built plan per in field inspection. ref#: 202211227027. fire onlyDetails
as built plan per in field inspection. ref#: 202211227027. fire only | |
| Jun 29, 2023 | Completed final sign-off Jan 2025 | 2844 Lyon St | Halyard Inc | fire alarm replacement system to comply with sffd ab#3.08 & ab#2.01.Details
fire alarm replacement system to comply with sffd ab#3.08 & ab#2.01. | $5,000 |
| May 22, 2023 | Completed final sign-off May 2025 | 2844 Lyon St | Halyard Inc | revision to approved permit 202008061263. provide 1 hour fire rating at existing partitions in existing common lobby.Details
revision to approved permit 202008061263. provide 1 hour fire rating at existing partitions in existing common lobby. | $7,000 |
| Nov 22, 2022 | Completed final sign-off Nov 2024 | 2844 Lyon St | North Star Plumbing & Fire Protection | installation of fire sprinkler system per nfpa 13-2016 in the 4 adus and lobby area include 2" underground fire service per nfpa 24 and total of 52 heads. ref permit 202008061263.Details
installation of fire sprinkler system per nfpa 13-2016 in the 4 adus and lobby area include 2" underground fire service per nfpa 24 and total of 52 heads. ref permit 202008061263. | $10,000 |
| Aug 22, 2020 | Completed final sign-off Feb 2021 | 2844 Lyon St | Sure, Inc. | unit #203 3rd floor & unit #301 4th floor: new bedroom, den, & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mech. no exterior work/fire alarm/sprinklers.Details
unit #203 3rd floor & unit #301 4th floor: new bedroom, den, & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no change to mech. no exterior work/fire alarm/sprinklers. | $125,000 |
| Aug 6, 2020 | Completed final sign-off May 2025 | 2844 Lyon St | Halyard Inc | add four (4) units per ord# 162-16. convert (e) garage & crawl space into new dwelling units within (e) envelope. new bathrooms, bedrooms, dishwashers, washer/dryers. seismic retrofit unde pa ~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&Details
add four (4) units per ord# 162-16. convert (e) garage & crawl space into new dwelling units within (e) envelope. new bathrooms, bedrooms, dishwashers, washer/dryers. seismic retrofit unde pa ~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt&~encrypt& | $200,000 |
| Feb 14, 2020 | Expired or cancelled expired Nov 2024 | 2844 Lyon St | Halyard Inc | soft story retrofit per chapter 4d engineering: 2019 cebc appendix a-4. to comply with nov 201990321Details
soft story retrofit per chapter 4d engineering: 2019 cebc appendix a-4. to comply with nov 201990321 | $75,000 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 2844 Lyon St | Sure, Inc. | street spaceDetails
street space | |
| Aug 22, 2019 | Completed final sign-off Oct 2019 | 2844 Lyon St | Sure, Inc. | for units 104 & 201: rev to pa# 201811085460; correction from beam to vertical support revised per field conditions, changes only at sheet s3Details
for units 104 & 201: rev to pa# 201811085460; correction from beam to vertical support revised per field conditions, changes only at sheet s3 | |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 2844 Lyon St | street spaceDetails
street space | ||
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 2844 Lyon St | Sure, Inc. | remodel apt 304: (n) bedroom, bathroom & kitchen, plmb fixtures, (n) lighting at (e) jb locations. (n) d/w, w/d. no change to mech, ext or fa/sprinklers.Details
remodel apt 304: (n) bedroom, bathroom & kitchen, plmb fixtures, (n) lighting at (e) jb locations. (n) d/w, w/d. no change to mech, ext or fa/sprinklers. | $85,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 2844 Lyon St | street spaceDetails
street space | ||
| Nov 8, 2018 | Completed final sign-off Oct 2019 | 2844 Lyon St | Sure, Inc. | renovation of units 104 on 2nd level and 201 on 3rd level. conversion from 1 bedroom to 2 bedroom at unit 201 and 1 bedroom to 3 bedrooms at unit 104. new kitchen cabinets. nw plmg fixtures. nw lighting at extg j-box locations. nw dishwasher. no change to mech. no exterior work, no structural workDetails
renovation of units 104 on 2nd level and 201 on 3rd level. conversion from 1 bedroom to 2 bedroom at unit 201 and 1 bedroom to 3 bedrooms at unit 104. new kitchen cabinets. nw plmg fixtures. nw lighting at extg j-box locations. nw dishwasher. no change to mech. no exterior work, no structural work | $60,000 |
| Nov 6, 2018 | Completed final sign-off Jan 2019 | 2844 Lyon St | Sure, Inc. | revision to pa 201805118908, unit 102. for structural calcs per inspector's requestDetails
revision to pa 201805118908, unit 102. for structural calcs per inspector's request | |
| Oct 4, 2018 | Completed final sign-off Nov 2018 | 2844 Lyon St | Byington Electric Corp | drawing and test for existing fire alarm sffd nov 1807-0003. add 12 new horns in units.Details
drawing and test for existing fire alarm sffd nov 1807-0003. add 12 new horns in units. | $4,000 |
| Jul 30, 2018 | Expired or cancelled cancelled Jan 2026 | 2844 Lyon St | renovate unit #104 on 2nd fl & 201 on 3rd fl: conversion from studio to one bedrm in 104, add 1 n bed & 1 n bath at 201, new kitchen cabinets, new plumbing fixtures, new lighting at (e) j-boxes, new dishwasher, new washer/dryers. no exterior work, no fire alarm or sprinkler work. no structural work.Details
renovate unit #104 on 2nd fl & 201 on 3rd fl: conversion from studio to one bedrm in 104, add 1 n bed & 1 n bath at 201, new kitchen cabinets, new plumbing fixtures, new lighting at (e) j-boxes, new dishwasher, new washer/dryers. no exterior work, no fire alarm or sprinkler work. no structural work. | $50,000 | |
| May 11, 2018 | Completed final sign-off Jan 2019 | 2844 Lyon St | Sure, Inc. | renovation of unit 102, 2nd fl. conversion from studio to 1 bedroom, new kitchen cabinets, plumbing, lighting, new dishwasher, no mechanical or exterior work. no fire alarm or sprinklersDetails
renovation of unit 102, 2nd fl. conversion from studio to 1 bedroom, new kitchen cabinets, plumbing, lighting, new dishwasher, no mechanical or exterior work. no fire alarm or sprinklers | $50,000 |
| Nov 15, 2016 | Expired or cancelled withdrawn Feb 2020 | 2844 Lyon St | soft story retrofit per sfbc chapter 34b engineering criteria for 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria for 2012 iebc appendix a-4 | $95,000 | |
| May 9, 2008 | Completed final sign-off Jul 2008 | 2844 Lyon St | rebuild/repair existing stair in kind at middle lightwell (no change size & shape).Details
rebuild/repair existing stair in kind at middle lightwell (no change size & shape). | $7,500 | |
| Dec 27, 2007 | Never finaled issued Jan 2008, no final | 2844 Lyon St | revision to pa# 2007/07/26/7912 to change the configuration of ex. rear stairs in the lightwell. replace ex. windows in the same lightwell in-kind with a 45min. rated windows.Details
revision to pa# 2007/07/26/7912 to change the configuration of ex. rear stairs in the lightwell. replace ex. windows in the same lightwell in-kind with a 45min. rated windows. | $5,000 | |
| Jul 26, 2007 | Never finaled issued Aug 2007, no final | 2844 Lyon St | replace (e) wood stairs with new steel stairs within existing footprint.Details
replace (e) wood stairs with new steel stairs within existing footprint. | $15,000 | |
| Feb 3, 2003 | Completed final sign-off Aug 2003 | 2844 Lyon St | Pacific Coast Construction Svcs | reroofingDetails
reroofing | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (7), Halyard Inc (5), North Star Plumbing & Fire Protection (2), Byington Electric Corp, Pacific Coast Construction Svcs
- Architects
- Jacob Herczeg (6)
- Engineers
- Tyler Moser (2), Charles Ng, James Li, John Yadegar, Masoud Sakanat, Raymond Cheung
- Authorized agent-otherss
- Chrissy Zhang (2), Alex Nie, Bill Hung
- Designers
- North Star Plumbing & Fire
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.