Permit GraphShortlistSan Francisco building permits since 2000

David A. King

License
980402
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Superb Builders Inc **See Notes**
Based in
San Francisco
On San Francisco permits
Aug 2015 to Mar 2023

127 permits since 2000 (contractor on 125 permits, authorized agent-others on 4 permits): 97 completed, 15 never finaled, 15 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
A G Renovation & Improvements (4), Dawson - Clinton Gen Contr Corp (4), Rozen Home Builders Inc (3), Skylight Tools Inc (3), J W Construction *See Notes*, Lee Construction, Nation Remodeling Corp, Regency Construction & Remodeling, Superb Builders & Custom Made Cabinetry
Architects
Houman Sharif (2), David Swetz, Engin Yagmur, Nick Palter, Ryan Knock
Engineers
Syu-Mon Chang (3), Harold E. Howell (2), Donald David, Engin Yagmur, Jamey Wylie, Lisa Tse, Luis Moura
Designers
Jasper Angus Malcolmson

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 127.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 8, 2023Never finaled
issued Mar 2023, no final
64 Mars StSuperb Builders & Custom Made Cabinetryremodel 1 kitchen & 1 bathroom. all remodel in-kind. no exterior work , no structural work. same location.
Details
Permit
202303083266
Permit issued
Mar 8, 2023

remodel 1 kitchen & 1 bathroom. all remodel in-kind. no exterior work , no structural work. same location.

Open the permit page

$35,000
Jun 9, 2021Expired or cancelled
cancelled Jan 2026
618 18th AvSuperb Builders Inc **See Notes**relocation and remodeling of kitchen, remodeling bathroom.
Details
Permit
202106092038

relocation and remodeling of kitchen, remodeling bathroom.

Open the permit page

$90,000
Jun 2, 2021Completed
final sign-off Jan 2022
639 17th AvSuperb Builders Inc **See Notes**one guest bathroom remodel in kind. plumbing as needed, new plumbing fixtures,new electrical as needed. same locations, no exterior changes, replacement shower pan new gfc1 outlet and led lights.
Details
Permit
202106021436
Permit issued
Jun 2, 2021
Final sign-off
Jan 4, 2022

one guest bathroom remodel in kind. plumbing as needed, new plumbing fixtures,new electrical as needed. same locations, no exterior changes, replacement shower pan new gfc1 outlet and led lights.

Open the permit page

$25,000
Mar 29, 2021Completed
final sign-off Jun 2021
672 Alvarado StSuperb Builders Inc **See Notes**shower repair, new plumbing fixtures, new shower pan in kind
Details
Permit
202103297438
Permit issued
Mar 29, 2021
Final sign-off
Jun 11, 2021

shower repair, new plumbing fixtures, new shower pan in kind

Open the permit page

$6,000
Mar 1, 2021Completed
final sign-off Sep 2021
7033 Geary BlSkylight Tools Inc, Superb Builders Inc **See Notes**cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switches
Details
Permit
202103015610
Permit issued
Jun 15, 2021
Final sign-off
Sep 15, 2021

cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switches

Open the permit page

$42,000
Feb 8, 2021Completed
final sign-off Oct 2021
446 20th AvSkylight Tools Inc, Superb Builders Inc **See Notes**unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations.
Details
Permit
202102084240
Permit issued
Aug 5, 2021
Final sign-off
Oct 29, 2021

unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations.

Open the permit page

$74,000
Dec 8, 2020Completed
final sign-off Feb 2021
21 Whitney StRegency Construction & Remodeling, Superb Builders Inc **See Notes**kitchen remodel like for like
Details
Permit
202012080423
Permit issued
Dec 8, 2020
Final sign-off
Feb 12, 2021

kitchen remodel like for like

Open the permit page

$20,000
Dec 8, 2020Completed
final sign-off Jan 2021
51 Topaz WySuperb Builders Inc **See Notes**shower repair (master) replace shower valve, new shower tile , shower pan, new shower door. no exterior work, no walls to be changed.
Details
Permit
202012080440
Permit issued
Dec 8, 2020
Final sign-off
Jan 13, 2021

shower repair (master) replace shower valve, new shower tile , shower pan, new shower door. no exterior work, no walls to be changed.

Open the permit page

$12,000
Nov 10, 2020Completed
final sign-off Dec 2020
66 Cleary CtSuperb Builders Inc **See Notes**#1403: kitchen remodel in kind, new appliances, new gfci outlets, replace subpanel to 80amps, new plumbing fixtures. same location, no walls to be changed or moved.
Details
Permit
202011108578
Permit issued
Nov 10, 2020
Final sign-off
Dec 30, 2020

#1403: kitchen remodel in kind, new appliances, new gfci outlets, replace subpanel to 80amps, new plumbing fixtures. same location, no walls to be changed or moved.

Open the permit page

$30,000
Nov 6, 2020Completed
final sign-off Mar 2021
1445 Eucalyptus DrSuperb Builders Inc **See Notes**one kitchen remodeling in kind upgrade elctrical as needed, new appliances, new cabinets, new plumbing fixtures, new 6" recessed led lights.
Details
Permit
202011068348
Permit issued
Nov 6, 2020
Final sign-off
Mar 3, 2021

one kitchen remodeling in kind upgrade elctrical as needed, new appliances, new cabinets, new plumbing fixtures, new 6" recessed led lights.

Open the permit page

$25,000
Oct 28, 2020Expired or cancelled
cancelled Jan 2026
368 San Carlos StDawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes**remodel of unit 368 on 2/f. minor floor plan revision of unit 366 on 3/f. ref bpa# 202003126911.
Details
Permit
202010287585

remodel of unit 368 on 2/f. minor floor plan revision of unit 366 on 3/f. ref bpa# 202003126911.

Open the permit page

Oct 14, 2020Expired or cancelled
expired Apr 2026
368 San Carlos StRozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes**remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit
Details
Permit
202010146466
Permit issued
Oct 14, 2020

remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit

Open the permit page

$25,000
Oct 7, 2020Completed
final sign-off May 2023
25 Hidalgo TrSuperb Builders Inc **See Notes**renovate home. relocate kitchen, dining rm, living rm to 1st flr, add half bath. 2nd flr - create bedrm, den, home office, add 2 (n) baths. renovate (e) bath. (n) sliding doors to side light court & rear. no work visible from public way.
Details
Permit
202010076129
Permit issued
Jan 26, 2021
Final sign-off
May 30, 2023

renovate home. relocate kitchen, dining rm, living rm to 1st flr, add half bath. 2nd flr - create bedrm, den, home office, add 2 (n) baths. renovate (e) bath. (n) sliding doors to side light court & rear. no work visible from public way.

Open the permit page

$185,000
Oct 2, 2020Never finaled
issued Nov 2020, no final
1200 Gough StSuperb Builders Inc **See Notes**unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac system
Details
Permit
202010025786
Permit issued
Nov 9, 2020

unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac system

Open the permit page

$45,000
Sep 8, 2020Never finaled
issued Sep 2020, no final
12 Roscoe StSuperb Builders Inc **See Notes**demolition of interior plaster, sheetrock, tile in showers, kitchen cabinets, wood floors to sub ploor to expose studs for structural observatoin and apply for interior remodel in separate application
Details
Permit
202009083683
Permit issued
Sep 8, 2020

demolition of interior plaster, sheetrock, tile in showers, kitchen cabinets, wood floors to sub ploor to expose studs for structural observatoin and apply for interior remodel in separate application

Open the permit page

$36,000
Sep 2, 2020Completed
final sign-off May 2021
727 Foerster StSuperb Builders Inc **See Notes**remodel 1 bathroom & 1 kitchen, in-kind. upgrade electrical & plumbing as need. no exterior work. no walls to be changed.
Details
Permit
202009023239
Permit issued
Sep 2, 2020
Final sign-off
May 14, 2021

remodel 1 bathroom & 1 kitchen, in-kind. upgrade electrical & plumbing as need. no exterior work. no walls to be changed.

Open the permit page

$38,000
Sep 2, 2020Completed
final sign-off Dec 2020
145 Broderick StSuperb Builders Inc **See Notes**apt 202: remodel 1 bathroom, in-kind. replce new plumbing fixturs, upgrade electrical as needed, no walls to be modified, no exterior work. new shower pan.
Details
Permit
202009023243
Permit issued
Sep 2, 2020
Final sign-off
Dec 3, 2020

apt 202: remodel 1 bathroom, in-kind. replce new plumbing fixturs, upgrade electrical as needed, no walls to be modified, no exterior work. new shower pan.

Open the permit page

$15,000
Aug 20, 2020Completed
final sign-off Mar 2021
1445 Eucalyptus DrSuperb Builders Inc **See Notes**remodel two bath in kind. master bathroom,2nd floor & guest bath on 1st floor,no walls to be changed, no exteriro work, upgrade electrical as needed, new plumbing, fixtures, 2 shower pans.
Details
Permit
202008202163
Permit issued
Aug 20, 2020
Final sign-off
Mar 3, 2021

remodel two bath in kind. master bathroom,2nd floor & guest bath on 1st floor,no walls to be changed, no exteriro work, upgrade electrical as needed, new plumbing, fixtures, 2 shower pans.

Open the permit page

$26,000
Aug 14, 2020Completed
final sign-off Oct 2020
2572 Alemany BlSuperb Builders Inc **See Notes**one kitchen and one bathroom remodel in kind,new plumbing fixtures,new shower pan,new electrical as needed,new recessed led lights,new sub panel 70 amps,new cabinets,new appliances,
Details
Permit
202008141838
Permit issued
Aug 17, 2020
Final sign-off
Oct 30, 2020

one kitchen and one bathroom remodel in kind,new plumbing fixtures,new shower pan,new electrical as needed,new recessed led lights,new sub panel 70 amps,new cabinets,new appliances,

Open the permit page

$37,000
Aug 11, 2020Completed
final sign-off Nov 2020
265 Avila StSuperb Builders Inc **See Notes**permeated chemical grouting for 19' along south foundation. due to construction of new adjacent mat slab foundation per previously approved pa #201505136187 for 259 avila street.
Details
Permit
202008111536
Permit issued
Aug 19, 2020
Final sign-off
Nov 12, 2020

permeated chemical grouting for 19' along south foundation. due to construction of new adjacent mat slab foundation per previously approved pa #201505136187 for 259 avila street.

Open the permit page

$1,500
Aug 6, 2020Completed
final sign-off Aug 2021
266 Curtis StSuperb Builders Inc **See Notes**revision to permite 201208157387 to convert existing covered patio in to part of the master bedroom at 2nd flr. close exterior walls and install new patio door. install a deck at rear.
Details
Permit
202008061264
Permit issued
Apr 13, 2021
Final sign-off
Aug 18, 2021

revision to permite 201208157387 to convert existing covered patio in to part of the master bedroom at 2nd flr. close exterior walls and install new patio door. install a deck at rear.

Open the permit page

$15,000
Aug 5, 2020Completed
final sign-off Oct 2020
128 Galewood CrSuperb Builders Inc **See Notes**kitchen (85 sqft) remodel in kind. upgrade electrical as needed. new (6) recessed led lights. new plumbing fixtures and appliances. add new subpanel 70 amps. replace 600 square feet of hardwood floors in dining room hallway and living room.
Details
Permit
202008051134
Permit issued
Aug 6, 2020
Final sign-off
Oct 6, 2020

kitchen (85 sqft) remodel in kind. upgrade electrical as needed. new (6) recessed led lights. new plumbing fixtures and appliances. add new subpanel 70 amps. replace 600 square feet of hardwood floors in dining room hallway and living room.

Open the permit page

$30,000
Jul 31, 2020Completed
final sign-off Mar 2021
1445 Eucalyptus DrSuperb Builders Inc **See Notes**to comply with complaint # 202045827 : repair and replace 600 square feet of stucco in the back of the house. not visible from street.
Details
Permit
202007310973
Permit issued
Aug 4, 2020
Final sign-off
Mar 3, 2021

to comply with complaint # 202045827 : repair and replace 600 square feet of stucco in the back of the house. not visible from street.

Open the permit page

$5,000
May 13, 2020Completed
final sign-off May 2021
251 Avila StSuperb Builders Inc **See Notes**permeated chemical grouting for 56 feet under and along north foundation
Details
Permit
202005137494
Permit issued
Jun 11, 2020
Final sign-off
May 3, 2021

permeated chemical grouting for 56 feet under and along north foundation

Open the permit page

$5,775
May 6, 2020Completed
final sign-off Jun 2020
1012 Shotwell StSuperb Builders Inc **See Notes**unit #b: remodel kitchen and bathroom like for like, smae locations. no walls to be changed, no exterior changes.
Details
Permit
202005067331
Permit issued
May 20, 2020
Final sign-off
Jun 26, 2020

unit #b: remodel kitchen and bathroom like for like, smae locations. no walls to be changed, no exterior changes.

Open the permit page

$40,000
Mar 12, 2020Expired or cancelled
expired Jan 2025
366 San Carlos StRozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes**new foundation. repair water damage in laundry and storage room. reconfiguration of storage.
Details
Permit
202003126911
Permit issued
Jul 27, 2020

new foundation. repair water damage in laundry and storage room. reconfiguration of storage.

Open the permit page

$25,000
Mar 11, 2020Completed
final sign-off May 2020
143 Ord StSuperb Builders Inc **See Notes**kitchen and bathroom remodel, in kind. same location, no walls to be changed. plumbing and electrical as need
Details
Permit
202003116792
Permit issued
Mar 11, 2020
Final sign-off
May 7, 2020

kitchen and bathroom remodel, in kind. same location, no walls to be changed. plumbing and electrical as need

Open the permit page

$32,000
Mar 5, 2020Never finaled
issued Oct 2020, no final
12 Roscoe StSuperb Builders Inc **See Notes**remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd fl
Details
Permit
202003056301
Permit issued
Oct 8, 2020

remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd fl

Open the permit page

$150,000
Feb 26, 2020Completed
final sign-off Jul 2020
1100 Monterey BlSuperb Builders Inc **See Notes**remodel kitchen in kind. upgrade electrical and plumbing as needed. new subpanel to supply kitchen circuits.
Details
Permit
202002265488
Permit issued
Feb 26, 2020
Final sign-off
Jul 9, 2020

remodel kitchen in kind. upgrade electrical and plumbing as needed. new subpanel to supply kitchen circuits.

Open the permit page

$23,000
Feb 20, 2020Completed
final sign-off Feb 2022
346 01st StSkylight Tools Inc, Superb Builders Inc **See Notes**unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft.
Details
Permit
202002204978
Permit issued
Feb 20, 2020
Final sign-off
Feb 8, 2022

unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft.

Open the permit page

$46,000
Feb 19, 2020Completed
final sign-off Jul 2020
79 Central AvSuperb Builders Inc **See Notes**revision "2" to existing pa#201909272962, revise the windows and doors at the rear wall at the second floor. remove simpson strong walls and add new shear walls.
Details
Permit
202002194822
Permit issued
Mar 11, 2020
Final sign-off
Jul 2, 2020

revision "2" to existing pa#201909272962, revise the windows and doors at the rear wall at the second floor. remove simpson strong walls and add new shear walls.

Open the permit page

$10,000
Feb 14, 2020Completed
final sign-off Nov 2021
259 Avila StSuperb Builders Inc **See Notes**revision to pa# 2015-0513-6187 tp provide plans for demo of interior plaster or drywall, floors, cabinets floors tiles, bathroom wall tile to expose framing. also demo electrical & plumbing as needed, for the work shown on the original plans
Details
Permit
202002144540
Permit issued
Feb 14, 2020
Final sign-off
Nov 15, 2021

revision to pa# 2015-0513-6187 tp provide plans for demo of interior plaster or drywall, floors, cabinets floors tiles, bathroom wall tile to expose framing. also demo electrical & plumbing as needed, for the work shown on the original plans

Open the permit page

$9,000
Feb 13, 2020Expired or cancelled
withdrawn Mar 2023
259 Avila StSuperb Builders Inc **See Notes**revision to pa# 201505136187; of 3rd story addition and the other 2 (e) floors, remodeling per plan, including 2 (e) bathrooms, laundry and kitchen. replace (e) concrete slab w/ new 12" #5 rebar max excavation 6" less than 50 cubic yards. new skylight on 3rd flr. **n/a maher**
Details
Permit
202002134449

revision to pa# 201505136187; of 3rd story addition and the other 2 (e) floors, remodeling per plan, including 2 (e) bathrooms, laundry and kitchen. replace (e) concrete slab w/ new 12" #5 rebar max excavation 6" less than 50 cubic yards. new skylight on 3rd flr. **n/a maher**

Open the permit page

$200,000
Jan 31, 2020Completed
final sign-off Mar 2020
2066 Wawona StSuperb Builders Inc **See Notes**bathroom remodel. change from bathtub to standing shower. no walls to be changed. like for like. new plumbing fixtures. upgrade electrical as needed.
Details
Permit
202001313220
Permit issued
Jan 31, 2020
Final sign-off
Mar 9, 2020

bathroom remodel. change from bathtub to standing shower. no walls to be changed. like for like. new plumbing fixtures. upgrade electrical as needed.

Open the permit page

$12,000
Jan 22, 2020Expired or cancelled
expired Jan 2025
366 San Carlos StRozen Home Builders Inc, Dawson - Clinton Gen Contr Corp, A G Renovation & Improvements, Superb Builders Inc **See Notes**remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.
Details
Permit
202001222526
Permit issued
Jun 4, 2020

remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.

Open the permit page

$10,000
Jan 15, 2020Completed
final sign-off Mar 2020
856 Fell StSuperb Builders Inc **See Notes**replace 3 small windows on right side of building repair the wall (siding) below windows due to wter damange to comply with no201997211.
Details
Permit
202001151973
Permit issued
Jan 17, 2020
Final sign-off
Mar 11, 2020

replace 3 small windows on right side of building repair the wall (siding) below windows due to wter damange to comply with no201997211.

Open the permit page

$18,000
Dec 31, 2019Never finaled
issued Dec 2019, no final
266 Curtis StSuperb Builders Inc **See Notes**structural revision to pa# 2019-0917-1906: addition of grade beam and new structual slab on lower level. voluntary seismic retrofit in lower and upper level with shearwalls and holddowns per plans.
Details
Permit
201912311081
Permit issued
Dec 31, 2019

structural revision to pa# 2019-0917-1906: addition of grade beam and new structual slab on lower level. voluntary seismic retrofit in lower and upper level with shearwalls and holddowns per plans.

Open the permit page

$30,000
Dec 27, 2019Completed
final sign-off Mar 2020
222 Stonecrest DrSuperb Builders Inc **See Notes**remodel one kitchen in kind. no wall alterations, upgrade electrical as needed, new appliances, cabinets, floors, etc.
Details
Permit
201912270744
Permit issued
Dec 27, 2019
Final sign-off
Mar 27, 2020

remodel one kitchen in kind. no wall alterations, upgrade electrical as needed, new appliances, cabinets, floors, etc.

Open the permit page

$27,000
Dec 16, 2019Completed
final sign-off Jan 2020
30 Esquina DrSuperb Builders Inc **See Notes**remodeling 1 bath 2nd fl like for like. no walls to be changed. upgrade eletrical and plumbing
Details
Permit
201912169642
Permit issued
Dec 16, 2019
Final sign-off
Jan 21, 2020

remodeling 1 bath 2nd fl like for like. no walls to be changed. upgrade eletrical and plumbing

Open the permit page

$13,000
Dec 12, 2019Completed
final sign-off Jan 2020
35 Ervine StSuperb Builders Inc **See Notes**to comply with complaint 201814562 upgrade electrical main panel from 100 to 200 amp install garden lights and drywall or sheetrock repairs
Details
Permit
201912129387
Permit issued
Dec 12, 2019
Final sign-off
Jan 7, 2020

to comply with complaint 201814562 upgrade electrical main panel from 100 to 200 amp install garden lights and drywall or sheetrock repairs

Open the permit page

$6,000
Dec 12, 2019Completed
final sign-off Jan 2020
30 Esquina DrSuperb Builders Inc **See Notes**kitchen remodel like for like same location no wall to be changed 10x10
Details
Permit
201912129374
Permit issued
Dec 12, 2019
Final sign-off
Jan 21, 2020

kitchen remodel like for like same location no wall to be changed 10x10

Open the permit page

$22,500
Dec 12, 2019Completed
final sign-off Mar 2020
2066 Wawona StSuperb Builders Inc **See Notes**kitchen remodel ing like for like, no walls to be modified, new appliance same locatoins. upgrade electrical as needed and add electrical subpanel.
Details
Permit
201912129386
Permit issued
Dec 12, 2019
Final sign-off
Mar 9, 2020

kitchen remodel ing like for like, no walls to be modified, new appliance same locatoins. upgrade electrical as needed and add electrical subpanel.

Open the permit page

$22,500
Nov 20, 2019Completed
final sign-off Jul 2020
79 Central AvSuperb Builders Inc **See Notes**rev to pa201907115655 & 201907317442 & 201909272962: reduce size of rear windows (2) and door width. replace ssw on rear line to sheerwall.
Details
Permit
201911207797
Permit issued
Nov 20, 2019
Final sign-off
Jul 2, 2020

rev to pa201907115655 & 201907317442 & 201909272962: reduce size of rear windows (2) and door width. replace ssw on rear line to sheerwall.

Open the permit page

Nov 1, 2019Completed
final sign-off Jan 2020
2 Malta DrSuperb Builders Inc **See Notes**to address enforcement #2019005081. change/paint stain siding on new vertical siding street facing (approx 500 sf)
Details
Permit
201911016218
Permit issued
Nov 4, 2019
Final sign-off
Jan 17, 2020

to address enforcement #2019005081. change/paint stain siding on new vertical siding street facing (approx 500 sf)

Open the permit page

$2,500
Oct 23, 2019Expired or cancelled
cancelled Dec 2020
486 Duncan StSuperb Builders Inc **See Notes**new 185 sq. ft. roof deck over existing flat roof.
Details
Permit
201910235399
Permit issued
Sep 24, 2020

new 185 sq. ft. roof deck over existing flat roof.

Open the permit page

$8,000
Sep 27, 2019Completed
final sign-off Jul 2020
79 Central AvSuperb Builders Inc **See Notes**rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors.
Details
Permit
201909272962
Permit issued
Sep 30, 2019
Final sign-off
Jul 2, 2020

rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors.

Open the permit page

$69,000
Sep 4, 2019Completed
final sign-off Oct 2019
258 Red Rock WySuperb Builders Inc **See Notes**remodel 2 bathroom in kind and replace kitchen counter top and flooring. no framing modification- no structural work.
Details
Permit
201909040566
Permit issued
Sep 4, 2019
Final sign-off
Oct 9, 2019

remodel 2 bathroom in kind and replace kitchen counter top and flooring. no framing modification- no structural work.

Open the permit page

$32,000
Aug 29, 2019Never finaled
issued Sep 2019, no final
486 Duncan StSuperb Builders Inc **See Notes**remodel interior of (e) residence. convert 488sq ft of garage to habitable space. 174sq ft addition underneath (e) sunroom on ground floor. add 203 aq ft of dormors to (e) roof (20% of roof area) convert 19sq ft of attic to habitable area. new plumbing and in residence.
Details
Permit
201908290213
Permit issued
Sep 26, 2019

remodel interior of (e) residence. convert 488sq ft of garage to habitable space. 174sq ft addition underneath (e) sunroom on ground floor. add 203 aq ft of dormors to (e) roof (20% of roof area) convert 19sq ft of attic to habitable area. new plumbing and in residence.

Open the permit page

$150,000
Aug 28, 2019Completed
final sign-off Sep 2019
424 Judson AvSuperb Builders Inc **See Notes**kitchen remodel, like for like. no walls to be altered, same locations, no exterior walls to be changed, (n) appliances and cabinets, (n) 70 amp subpanel to feed kitchen
Details
Permit
201908280055
Permit issued
Aug 28, 2019
Final sign-off
Sep 26, 2019

kitchen remodel, like for like. no walls to be altered, same locations, no exterior walls to be changed, (n) appliances and cabinets, (n) 70 amp subpanel to feed kitchen

Open the permit page

$23,000
Aug 1, 2019Completed
final sign-off Dec 2020
486 Duncan StSuperb Builders Inc **See Notes**to comply w/ n.o.v 201962631. demo only permit. demo all interior plaster or sheetrock, tile, cabinets, floors through all 3 floors and garage.construction of new interior will be under separate permit.
Details
Permit
201908017639
Permit issued
Aug 1, 2019
Final sign-off
Dec 2, 2020

to comply w/ n.o.v 201962631. demo only permit. demo all interior plaster or sheetrock, tile, cabinets, floors through all 3 floors and garage.construction of new interior will be under separate permit.

Open the permit page

$7,500
Jul 31, 2019Completed
final sign-off Jun 2020
79 Central AvSuperb Builders Inc **See Notes**demo and clean away sheet rock and plaster from interior walls on the middle level
Details
Permit
201907317442
Permit issued
Jul 31, 2019
Final sign-off
Jun 25, 2020

demo and clean away sheet rock and plaster from interior walls on the middle level

Open the permit page

$5,000
Jul 11, 2019Completed
final sign-off Jul 2020
79 Central AvSuperb Builders Inc **See Notes**kitchen and bathroom remodeling like for like. same location all new plumbing fixtrues, tiles, tub, cabinets etc. comply with cec 150.0(k)3
Details
Permit
201907115655
Permit issued
Jul 11, 2019
Final sign-off
Jul 2, 2020

kitchen and bathroom remodeling like for like. same location all new plumbing fixtrues, tiles, tub, cabinets etc. comply with cec 150.0(k)3

Open the permit page

$37,000
Jun 17, 2019Completed
final sign-off Dec 2020
486 Duncan StSuperb Builders Inc **See Notes**2 bathroom (5x8) remodeling, like for like same location no structural changes and no exterior work. new led recessed lights and plumbing fixtures.
Details
Permit
201906173562
Permit issued
Jun 17, 2019
Final sign-off
Dec 2, 2020

2 bathroom (5x8) remodeling, like for like same location no structural changes and no exterior work. new led recessed lights and plumbing fixtures.

Open the permit page

$32,000
Jun 6, 2019Completed
final sign-off Oct 2019
46 Malta DrSuperb Builders Inc **See Notes**remodel kitchen like for like: no exterior or wall to be changed. replace cabinets, appliances, plumbing fixtures, led recessed lights, and gfci outlets. no walls removed.
Details
Permit
201906062762
Permit issued
Jun 6, 2019
Final sign-off
Oct 10, 2019

remodel kitchen like for like: no exterior or wall to be changed. replace cabinets, appliances, plumbing fixtures, led recessed lights, and gfci outlets. no walls removed.

Open the permit page

$25,000
Jun 3, 2019Completed
final sign-off Jul 2019
300 Saint Charles AvSuperb Builders Inc **See Notes**kitchen remodeling like for like no changes on locations or structural changes
Details
Permit
201906032315
Permit issued
Jun 3, 2019
Final sign-off
Jul 8, 2019

kitchen remodeling like for like no changes on locations or structural changes

Open the permit page

$25,000
May 13, 2019Completed
final sign-off Jul 2019
1870 Jackson StSuperb Builders Inc **See Notes**master bathroom remodeling. replace old bathtub for a standing shower all in same location. new plumbing fixture, new tile, new hot mop and accesories.
Details
Permit
201905130497
Permit issued
May 13, 2019
Final sign-off
Jul 18, 2019

master bathroom remodeling. replace old bathtub for a standing shower all in same location. new plumbing fixture, new tile, new hot mop and accesories.

Open the permit page

$18,000
Apr 30, 2019Completed
final sign-off Aug 2021
266 Curtis StJ W Construction *See Notes*, Superb Builders Inc **See Notes**commencement of work not started under perviously approved permit. applicationpa#201505045326.
Details
Permit
201904309322
Permit issued
Apr 30, 2019
Final sign-off
Aug 18, 2021

commencement of work not started under perviously approved permit. applicationpa#201505045326.

Open the permit page

$1,000
Apr 12, 2019Completed
final sign-off Jul 2019
291 28th AvSuperb Builders Inc **See Notes**bathroom remodel, like for like. no walls relocated or changed. new plumbing fixtures, tiles & cabinets.
Details
Permit
201904127914
Permit issued
Apr 12, 2019
Final sign-off
Jul 3, 2019

bathroom remodel, like for like. no walls relocated or changed. new plumbing fixtures, tiles & cabinets.

Open the permit page

$13,000
Apr 3, 2019Completed
final sign-off Jul 2019
291 28th AvSuperb Builders Inc **See Notes**kitchen remodeling like for like. no wall to be alterated or removed, new appliances, cabinets, counter top. new gfci outlets 6" led recessed lighting.
Details
Permit
201904036991
Permit issued
Apr 3, 2019
Final sign-off
Jul 3, 2019

kitchen remodeling like for like. no wall to be alterated or removed, new appliances, cabinets, counter top. new gfci outlets 6" led recessed lighting.

Open the permit page

$23,000
Mar 28, 2019Completed
final sign-off Apr 2019
2107 34th AvNation Remodeling Corpremodel bathroom: no walls modifications, siwtch from tub to standing shower. add new exhaust fan, recessed led lights, upgrade gfci outlets. all in the same locations.
Details
Permit
201903286532
Permit issued
Mar 28, 2019
Final sign-off
Apr 29, 2019

remodel bathroom: no walls modifications, siwtch from tub to standing shower. add new exhaust fan, recessed led lights, upgrade gfci outlets. all in the same locations.

Open the permit page

$15,000
Mar 28, 2019Completed
final sign-off May 2019
1653 Greenwich StSuperb Builders Inc **See Notes**kitchen remodeling no walls to be changed or framing modifications. new cabinets, appliances, floor tile, sink new led lights, new gfci outlets, remodel. compy w/ 150.01 (k) 3
Details
Permit
201903286533
Permit issued
Mar 28, 2019
Final sign-off
May 22, 2019

kitchen remodeling no walls to be changed or framing modifications. new cabinets, appliances, floor tile, sink new led lights, new gfci outlets, remodel. compy w/ 150.01 (k) 3

Open the permit page

$7,000
Mar 18, 2019Expired or cancelled
expired Jan 2023
275 Valdez AvSuperb Builders Inc **See Notes**add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural work
Details
Permit
201903185506
Permit issued
Mar 28, 2019

add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural work

Open the permit page

$180,000
Mar 15, 2019Completed
final sign-off Sep 2019
3075 26th StLee Construction, Superb Builders Inc **See Notes**remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room.
Details
Permit
201903155316
Permit issued
Mar 15, 2019
Final sign-off
Sep 6, 2019

remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room.

Open the permit page

$30,000
Mar 5, 2019Completed
final sign-off Apr 2019
2 Malta DrSuperb Builders Inc **See Notes**replace 3 sides of exterior siding in kind and add 1/2" plywood only on second floor of the house, first level stucco to remain; also replace wood shake in kind above siding.
Details
Permit
201903054468
Permit issued
Mar 5, 2019
Final sign-off
Apr 24, 2019

replace 3 sides of exterior siding in kind and add 1/2" plywood only on second floor of the house, first level stucco to remain; also replace wood shake in kind above siding.

Open the permit page

$29,000
Feb 28, 2019Never finaled
issued Feb 2019, no final
2412 Harrison StSuperb Builders Inc **See Notes**two bathrooms remodel, like for like. no walls or locations to be change. same place like existing. re tile, shower pan, vanity and plumbing fixtures
Details
Permit
201902284077
Permit issued
Feb 28, 2019

two bathrooms remodel, like for like. no walls or locations to be change. same place like existing. re tile, shower pan, vanity and plumbing fixtures

Open the permit page

$26,000
Jan 15, 2019Completed
final sign-off Jan 2019
574 18th AvSuperb Builders Inc **See Notes**renew permit application 2016-0415-4930
Details
Permit
201901150443
Permit issued
Jan 15, 2019
Final sign-off
Jan 22, 2019

renew permit application 2016-0415-4930

Open the permit page

Jan 7, 2019Never finaled
issued Feb 2019, no final
166 Geary StSuperb Builders Inc **See Notes**8 fl. title 24 for pa 2018-0118-8954
Details
Permit
201901079752
Permit issued
Feb 5, 2019

8 fl. title 24 for pa 2018-0118-8954

Open the permit page

Dec 20, 2018Completed
final sign-off Nov 2019
2274 39th AvSuperb Builders Inc **See Notes**interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyer
Details
Permit
201812208876
Permit issued
Feb 7, 2019
Final sign-off
Nov 5, 2019

interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyer

Open the permit page

$150,000
Dec 3, 2018Completed
final sign-off Feb 2019
727 46th AvSuperb Builders Inc **See Notes**remodel two bathrooms like for like. same location. no walls to be removed or modified. install new plumbing fixtures. remodel kitchen in-kind and install (1) shower pan.
Details
Permit
201812037325
Permit issued
Dec 3, 2018
Final sign-off
Feb 4, 2019

remodel two bathrooms like for like. same location. no walls to be removed or modified. install new plumbing fixtures. remodel kitchen in-kind and install (1) shower pan.

Open the permit page

$45,000
Nov 26, 2018Expired or cancelled
expired Jan 2023
275 Valdez AvSuperb Builders Inc **See Notes**(2) bathroom & (1) kitchen remodel, all work upstairs, no wall removal, like-for-like, same locations
Details
Permit
201811266621
Permit issued
Nov 26, 2018

(2) bathroom & (1) kitchen remodel, all work upstairs, no wall removal, like-for-like, same locations

Open the permit page

$50,000
Nov 15, 2018Completed
final sign-off Jan 2019
1455 Union StSuperb Builders Inc **See Notes**remodel one bathroom and one kitchen in unit #1. remodel one bathroom and one kitchen in unit #2. like for like. no structural changes or walls removal. new appliances and cabinets. two units same scope of work and add a subpanel in each unit #1 and #2.
Details
Permit
201811156016
Permit issued
Nov 15, 2018
Final sign-off
Jan 29, 2019

remodel one bathroom and one kitchen in unit #1. remodel one bathroom and one kitchen in unit #2. like for like. no structural changes or walls removal. new appliances and cabinets. two units same scope of work and add a subpanel in each unit #1 and #2.

Open the permit page

$50,000
Nov 6, 2018Completed
final sign-off Feb 2019
2 Malta DrSuperb Builders Inc **See Notes**3 bathrooms, 1 kitchen rmeodel including hvac & ductwork. no walls, door or windows to be moficied. same location. just new bathroom & kitchen accesorries and appliances.
Details
Permit
201811065186
Permit issued
Nov 6, 2018
Final sign-off
Feb 13, 2019

3 bathrooms, 1 kitchen rmeodel including hvac & ductwork. no walls, door or windows to be moficied. same location. just new bathroom & kitchen accesorries and appliances.

Open the permit page

$55,000
Oct 25, 2018Completed
final sign-off Jan 2019
3336 25th StSuperb Builders Inc **See Notes**kitchen and bathroom remodel. maher n/a
Details
Permit
201810254165
Permit issued
Oct 25, 2018
Final sign-off
Jan 28, 2019

kitchen and bathroom remodel. maher n/a

Open the permit page

$15,000
Oct 5, 2018Completed
final sign-off May 2019
2647 23rd AvSuperb Builders Inc **See Notes**remove wall between kitchen, dining & living rm. remodel bathroom, kitchen, replace old plaster surfaces. build out downstairs basement storage area and conver to bedrooms & bath. relocate and update mechanical & electrical. add rear deck.
Details
Permit
201810052423
Permit issued
Oct 15, 2018
Final sign-off
May 6, 2019

remove wall between kitchen, dining & living rm. remodel bathroom, kitchen, replace old plaster surfaces. build out downstairs basement storage area and conver to bedrooms & bath. relocate and update mechanical & electrical. add rear deck.

Open the permit page

$150,000
Sep 18, 2018Completed
final sign-off Oct 2018
1 Pinehurst WySuperb Builders Inc **See Notes**kitchen remodel. no walls removed,everything int he same location. new cabinets, new appliances, new 6 led recessed lights.
Details
Permit
201809180659
Permit issued
Sep 18, 2018
Final sign-off
Oct 19, 2018

kitchen remodel. no walls removed,everything int he same location. new cabinets, new appliances, new 6 led recessed lights.

Open the permit page

$18,000
Aug 27, 2018Completed
final sign-off Mar 2019
1333 Jones StSuperb Builders Inc **See Notes**unit 1501 - remodel 2 bathrooms & kitchen. like for like, no wall or change locations. replace all fixture like toilets, vanities, tile appliances, cabinets, counter & new led recessed lights
Details
Permit
201808278452
Permit issued
Aug 27, 2018
Final sign-off
Mar 11, 2019

unit 1501 - remodel 2 bathrooms & kitchen. like for like, no wall or change locations. replace all fixture like toilets, vanities, tile appliances, cabinets, counter & new led recessed lights

Open the permit page

$38,000
Aug 10, 2018Completed
final sign-off Feb 2019
33 Scotia AvSuperb Builders Inc **See Notes**kitchen and bathroom remodel. like for like. new bathroom fixtures, faucet, toilet, vanity, tiles. new kitchen recessed lights, cabinets, appliances. all in the same location . no exterior changes or walls removed.
Details
Permit
201808107041
Permit issued
Aug 10, 2018
Final sign-off
Feb 27, 2019

kitchen and bathroom remodel. like for like. new bathroom fixtures, faucet, toilet, vanity, tiles. new kitchen recessed lights, cabinets, appliances. all in the same location . no exterior changes or walls removed.

Open the permit page

$30,000
Jul 26, 2018Completed
final sign-off Oct 2018
439 Oxford StSuperb Builders Inc **See Notes**remodel (1) bathroom 1/f, new tub, toilet, vanity, tile, lights, gfci outlets; no walls/windows/door/other changes w/this permit; insulation & sheetrock, garage, hallway, north wall.
Details
Permit
201807265584
Permit issued
Jul 26, 2018
Final sign-off
Oct 1, 2018

remodel (1) bathroom 1/f, new tub, toilet, vanity, tile, lights, gfci outlets; no walls/windows/door/other changes w/this permit; insulation & sheetrock, garage, hallway, north wall.

Open the permit page

$10,000
Jul 12, 2018Completed
final sign-off Aug 2018
60 Robblee AvSuperb Builders Inc **See Notes**bathroom remodel no changes on walls or exterior new tile, hot mop, fixtures, new paint, sheetrock no structural work
Details
Permit
201807124454
Permit issued
Jul 12, 2018
Final sign-off
Aug 23, 2018

bathroom remodel no changes on walls or exterior new tile, hot mop, fixtures, new paint, sheetrock no structural work

Open the permit page

$10,000
Jul 11, 2018Completed
final sign-off Oct 2018
999 Wisconsin StSuperb Builders Inc **See Notes**kitchen and 2 bathroom remodel. no walls moved no structural
Details
Permit
201807114347
Permit issued
Jul 11, 2018
Final sign-off
Oct 23, 2018

kitchen and 2 bathroom remodel. no walls moved no structural

Open the permit page

$25,000
May 30, 2018Completed
final sign-off May 2018
3756 Jackson StSuperb Builders Inc **See Notes**administrative revision to 201710100750 to correct scope of work inappropriately written, scoop should have read - revision to 20161111628708, 201703030612 delete lightwell. remodel (e) home/office w/1 new bathm frenchdoors to rear * window replacement. add 1 new bath @2nd fl add 1 newlaundry closet
Details
Permit
201805300540
Permit issued
May 30, 2018
Final sign-off
May 31, 2018

administrative revision to 201710100750 to correct scope of work inappropriately written, scoop should have read - revision to 20161111628708, 201703030612 delete lightwell. remodel (e) home/office w/1 new bathm frenchdoors to rear * window replacement. add 1 new bath @2nd fl add 1 newlaundry closet

Open the permit page

May 30, 2018Completed
final sign-off Jul 2019
266 Country Club DrSuperb Builders Inc **See Notes**remove wall between kitchen & living room. remodel of kitchen
Details
Permit
201805300524
Permit issued
Jun 26, 2018
Final sign-off
Jul 17, 2019

remove wall between kitchen & living room. remodel of kitchen

Open the permit page

$20,000
Feb 14, 2018Completed
final sign-off May 2018
8200 Oceanview TrSuperb Builders Inc **See Notes**demo and remodel one bathroom and kithcen. no walls or change of location. replace cabinets, fixtures, countertops, floors, 6" recessed lights and new paint. maher n/a
Details
Permit
201802141305
Permit issued
Feb 14, 2018
Final sign-off
May 22, 2018

demo and remodel one bathroom and kithcen. no walls or change of location. replace cabinets, fixtures, countertops, floors, 6" recessed lights and new paint. maher n/a

Open the permit page

$35,000
Feb 6, 2018Completed
final sign-off May 2018
798 Great HySuperb Builders Inc **See Notes**unit # 2, kitchen remodel no change locations new cabinets new 6 led recessed lights, new appliances new paint couter tops new backsplash tile, replace canister to 30 new led 6" recessed lights, througout the living room, kitchen& dining rm
Details
Permit
201802060563
Permit issued
Feb 6, 2018
Final sign-off
May 30, 2018

unit # 2, kitchen remodel no change locations new cabinets new 6 led recessed lights, new appliances new paint couter tops new backsplash tile, replace canister to 30 new led 6" recessed lights, througout the living room, kitchen& dining rm

Open the permit page

$30,000
Jan 18, 2018Completed
final sign-off Feb 2019
166 Geary StSuperb Builders Inc **See Notes**8th - remodel interior. create new partition wall, install new kitchen cabinets, new electrical outlet for office equipment and install new high efficiency lights
Details
Permit
201801188954
Permit issued
Feb 16, 2018
Final sign-off
Feb 28, 2019

8th - remodel interior. create new partition wall, install new kitchen cabinets, new electrical outlet for office equipment and install new high efficiency lights

Open the permit page

$40,000
Jan 4, 2018Completed
final sign-off May 2018
1449 Innes AvSuperb Builders Inc **See Notes**kitchen & bath remodel, all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom, like-for-like.
Details
Permit
201801047870
Permit issued
Jan 4, 2018
Final sign-off
May 4, 2018

kitchen & bath remodel, all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom, like-for-like.

Open the permit page

$15,000
Jan 4, 2018Completed
final sign-off Jul 2019
266 Country Club DrSuperb Builders Inc **See Notes**(2) bathroom remodels, like-for-like, revision to pa#201711274836; all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom
Details
Permit
201801047862
Permit issued
Jan 4, 2018
Final sign-off
Jul 17, 2019

(2) bathroom remodels, like-for-like, revision to pa#201711274836; all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom

Open the permit page

$8,000
Nov 29, 2017Never finaled
issued Feb 2018, no final
3756 Jackson StSuperb Builders Inc **See Notes**replace (e) front facade windows and doors. replacing with custom wood iwndows with true divided lites.
Details
Permit
201711295076
Permit issued
Feb 8, 2018
Final sign-off
May 15, 2018

replace (e) front facade windows and doors. replacing with custom wood iwndows with true divided lites.

Open the permit page

$50,000
Nov 27, 2017Expired or cancelled
cancelled Nov 2018
35 Ervine StSuperb Builders Inc **See Notes**kitchen remdel in kind, same location
Details
Permit
201711274862
Permit issued
Nov 27, 2017

kitchen remdel in kind, same location

Open the permit page

$12,000
Nov 27, 2017Completed
final sign-off Jul 2019
266 Country Club DrSuperb Builders Inc **See Notes**ser. panel upgrade to 200 amp & rewire kitchne remodel in kind
Details
Permit
201711274836
Permit issued
Nov 27, 2017
Final sign-off
Jul 17, 2019

ser. panel upgrade to 200 amp & rewire kitchne remodel in kind

Open the permit page

$18,000
Nov 22, 2017Never finaled
issued Nov 2017, no final
3055 22nd AvSuperb Builders Inc **See Notes**remodel kitchen, turn 1/2 bath upstairs into full bath with removal of closet.
Details
Permit
201711224726
Permit issued
Nov 22, 2017

remodel kitchen, turn 1/2 bath upstairs into full bath with removal of closet.

Open the permit page

$35,000
Nov 2, 2017Completed
final sign-off Mar 2018
1731 43rd AvSuperb Builders Inc **See Notes**bathroom expansion on (e) ground floor bath. maher n/a.
Details
Permit
201711022984
Permit issued
Nov 2, 2017
Final sign-off
Mar 6, 2018

bathroom expansion on (e) ground floor bath. maher n/a.

Open the permit page

$8,000
Oct 27, 2017Completed
final sign-off Jan 2018
2875 21st StSuperb Builders Inc **See Notes**unit #5: bathroom remodel, same location. new fixture, new tile, new exhaust fan, new vanity. no change on walls.
Details
Permit
201710272529
Permit issued
Oct 27, 2017
Final sign-off
Jan 10, 2018

unit #5: bathroom remodel, same location. new fixture, new tile, new exhaust fan, new vanity. no change on walls.

Open the permit page

$10,000
Oct 10, 2017Completed
final sign-off May 2018
3756 Jackson StSuperb Builders Inc **See Notes**revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n)
Details
Permit
201710100750
Permit issued
Dec 1, 2017
Final sign-off
May 15, 2018

revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n)

Open the permit page

Aug 30, 2017Expired or cancelled
cancelled Apr 2018
3756 Jackson StSuperb Builders Inc **See Notes**1/f: remodel bathroom. no change in walls and layouts and openings.
Details
Permit
201708306441
Permit issued
Aug 30, 2017

1/f: remodel bathroom. no change in walls and layouts and openings.

Open the permit page

$12,000
Aug 10, 2017Expired or cancelled
expired Jul 2023
2815 Pine StSuperb Builders Inc **See Notes**lower unit - install 12 nos 4" led recessed lights in living room; and connec woodfireplace in gs insert & instlal new 1/2 gas line.
Details
Permit
201708104464
Permit issued
Aug 10, 2017

lower unit - install 12 nos 4" led recessed lights in living room; and connec woodfireplace in gs insert & instlal new 1/2 gas line.

Open the permit page

$5,500
Jul 25, 2017Completed
final sign-off Oct 2017
1731 43rd AvSuperb Builders Inc **See Notes**kitchen remodel, bathroom remodel , rewire 2nd flr, w/100 amp subpanel.non structural no plumbing fixtures.cabinets & tile, all in same location no walls removal or no exterior changes
Details
Permit
201707252903
Permit issued
Jul 25, 2017
Final sign-off
Oct 17, 2017

kitchen remodel, bathroom remodel , rewire 2nd flr, w/100 amp subpanel.non structural no plumbing fixtures.cabinets & tile, all in same location no walls removal or no exterior changes

Open the permit page

$32,000
Jun 27, 2017Completed
final sign-off Nov 2018
145 Richardson AvSuperb Builders Inc **See Notes**kitchen remodel including removal/replacement of interior walls & reconfiguration of (e) stair layout from ground to 2nd floor; misc, new lighting & electrical; new kitchen cabinets & interior finishes; removal & infill of existing north exterior elevation window on ground floor
Details
Permit
201706270433
Permit issued
Jun 27, 2017
Final sign-off
Nov 1, 2018

kitchen remodel including removal/replacement of interior walls & reconfiguration of (e) stair layout from ground to 2nd floor; misc, new lighting & electrical; new kitchen cabinets & interior finishes; removal & infill of existing north exterior elevation window on ground floor

Open the permit page

$48,000
Jun 22, 2017Completed
final sign-off May 2018
3756 Jackson StSuperb Builders Inc **See Notes**demo and replace 80sf of tile & waterproof in a balcony in front of the house.
Details
Permit
201706220132
Permit issued
Jun 22, 2017
Final sign-off
May 29, 2018

demo and replace 80sf of tile & waterproof in a balcony in front of the house.

Open the permit page

$7,800
Jun 15, 2017Completed
final sign-off Dec 2018
2312 Castro StSuperb Builders Inc **See Notes**revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof.
Details
Permit
201706159504
Permit issued
Jun 19, 2017
Final sign-off
Dec 19, 2018

revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof.

Open the permit page