Ai-Ren I Lei
- Listed as
- authorized agent-others, contractor
- Firm
- Ren Lei Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2026
239 permits since 2000 (contractor on 238 permits, authorized agent-others on 2 permits): 172 completed, 14 in progress, 29 never finaled, 24 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 239.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 534 18th Av | Ren Lei Construction Co | revision to bpa: 202510177605 - reconfigure bathroom plan and convert door to window on 1st floor, reconf. bathroom and closet plan on 2nf floor, relocate laundry room from 3rd floor to 2nd floor and reconf. master bedroom/ bathroom plan at 3rd floor.Details
revision to bpa: 202510177605 - reconfigure bathroom plan and convert door to window on 1st floor, reconf. bathroom and closet plan on 2nf floor, relocate laundry room from 3rd floor to 2nd floor and reconf. master bedroom/ bathroom plan at 3rd floor. | |
| Aug 4, 2026 | Completed final sign-off Sep 2026 | 751 25th Av | Ren Lei Construction Co | to obtain final inspection for wark approved ubder pa # 200905188574, 201905150690, 202011098492, all work completedDetails
to obtain final inspection for wark approved ubder pa # 200905188574, 201905150690, 202011098492, all work completed | |
| Aug 4, 2026 | Completed final sign-off Aug 2026 | 751 25th Av | Ren Lei Construction Co | to obtain final inspection for work approved under pa # 202108166496, 202209092157 all work is completeDetails
to obtain final inspection for work approved under pa # 202108166496, 202209092157 all work is complete | |
| Jul 30, 2026 | Expired or cancelled withdrawn Aug 2026 | 751 25th Av | Ren Lei Construction Co | permit renewal.Details
permit renewal. | |
| May 15, 2026 | Completed final sign-off Jul 2026 | 517 Ulloa St | Ren Lei Construction Co | remove front setback concrete and replace w/landscaping (work within property line)Details
remove front setback concrete and replace w/landscaping (work within property line) | $1,500 |
| Dec 8, 2025 | In progress issued Mar 2026 | 534 18th Av | Ren Lei Construction Co | comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed room on 3rd fl. add one bathroom on 3rd fl. remove deck at rear item number 4.Details
comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed room on 3rd fl. add one bathroom on 3rd fl. remove deck at rear item number 4. | $250,000 |
| Oct 20, 2025 | In progress issued Nov 2025 | 1737 Webster St | Ren Lei Construction Co | revision to pa #202201216446 to repair bay at front of building for structural bracing. remove under bay, historic siding to access structure and replace historic siding in kind. only under side of bay. no other to front facade.Details
revision to pa #202201216446 to repair bay at front of building for structural bracing. remove under bay, historic siding to access structure and replace historic siding in kind. only under side of bay. no other to front facade. | $3,000 |
| Sep 19, 2025 | In progress issued Oct 2025 | 1478 41st Av | Ren Lei Construction Co | 1 story horizontal addition, add bathroom & 2 bedrooms; kitchen w/2 burner stove & convert 1 bedroom to great roomDetails
1 story horizontal addition, add bathroom & 2 bedrooms; kitchen w/2 burner stove & convert 1 bedroom to great room | $80,000 |
| Sep 5, 2025 | Completed final sign-off Apr 2026 | 170 Arleta Av | Ren Lei Construction Co | revision to 202504023555: reconfigure bath on 1sr fl & walls. relocate washer to 2nd/f & add 3 closets, reconfigure bathroom & modify skylights (invisible from st) & replace fire place w/electric.Details
revision to 202504023555: reconfigure bath on 1sr fl & walls. relocate washer to 2nd/f & add 3 closets, reconfigure bathroom & modify skylights (invisible from st) & replace fire place w/electric. | |
| Jul 22, 2025 | In progress issued Aug 2025 | 1737 Webster St | Ren Lei Construction Co | revision to 202201216446, construction has revealed an existing retaining wall that needs to be replaced along rear north prop line within builinding envelope, adjacent to neighboring rear yards. height of wall is 8 ft8inch, length of wall is 45 ftDetails
revision to 202201216446, construction has revealed an existing retaining wall that needs to be replaced along rear north prop line within builinding envelope, adjacent to neighboring rear yards. height of wall is 8 ft8inch, length of wall is 45 ft | $26,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 534 18th Av | Ren Lei Construction Co | comply w/ nov 202316929 item #3 and #4. replace all plaster inside the house (2000 sqft), remodel (3) bathrooms and (1) kitchen. replace stucco in front of building in kind. item #4 deck repair is less than 50%. baths 40 sq ft, 40 sq ft, 25 sq ft. kitch. 200 sq ft. no moving walls.Details
comply w/ nov 202316929 item #3 and #4. replace all plaster inside the house (2000 sqft), remodel (3) bathrooms and (1) kitchen. replace stucco in front of building in kind. item #4 deck repair is less than 50%. baths 40 sq ft, 40 sq ft, 25 sq ft. kitch. 200 sq ft. no moving walls. | $50,000 |
| Jun 11, 2025 | Completed final sign-off Aug 2025 | 80 06th Av | Ren Lei Construction Co | remodel partial kitchen modify some cabinets. relocate sink 12" and add additional receptacles.Details
remodel partial kitchen modify some cabinets. relocate sink 12" and add additional receptacles. | $10,000 |
| May 21, 2025 | Completed final sign-off Dec 2025 | 331 Capistrano Av | Ren Lei Construction Co | revision p/a 2024-0711-6263 to revise scope of work to document all (e) front (street) facing windows will remain in place and will not be removed and replaced as indicated on previously approved drawing set, dmj 06/05/2025;Details
revision p/a 2024-0711-6263 to revise scope of work to document all (e) front (street) facing windows will remain in place and will not be removed and replaced as indicated on previously approved drawing set, dmj 06/05/2025; | |
| Apr 2, 2025 | Completed final sign-off Apr 2026 | 170 Arleta Av | Ren Lei Construction Co | 950 sq ft of new conditioned space on the 1st fl. 2 baths 2 beds and media room. relocate 2 bath, remodel kitchenDetails
950 sq ft of new conditioned space on the 1st fl. 2 baths 2 beds and media room. relocate 2 bath, remodel kitchen | $120,000 |
| Feb 5, 2025 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | recommencement and completion of work approved under bpa#: 202108166496 and 202209092157Details
recommencement and completion of work approved under bpa#: 202108166496 and 202209092157 | |
| Feb 5, 2025 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | recommencement and completion of work approved under bpa#:200905188574 and 201905150690Details
recommencement and completion of work approved under bpa#:200905188574 and 201905150690 | |
| Nov 7, 2024 | In progress issued Jul 2025 | 3255 Octavia St | Ren Lei Construction Co | 3/f: kitchen/bathroom renovation, combine (2)bedroom into (1)bedroom, 2/f: kitchen/bathroom renovation; ground level: widen garage door, new sliding door to backyard. horizontal addition of 17 sf at front of garage.Details
3/f: kitchen/bathroom renovation, combine (2)bedroom into (1)bedroom, 2/f: kitchen/bathroom renovation; ground level: widen garage door, new sliding door to backyard. horizontal addition of 17 sf at front of garage. | $200,000 |
| Nov 5, 2024 | Completed final sign-off Jul 2026 | 2937 24th St | Ren Lei Construction Co | renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use.Details
renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use. | $175,000 |
| Jul 11, 2024 | Completed final sign-off Dec 2025 | 331 Capistrano Av | Ren Lei Construction Co | to comply with nov #202423535 front window replacement. remove juliet balcony. update 3rd fl modification. add roof deck at front. ground floor unit to be addressed under seperate permit. unit 201408063132 - legalize dwelling unit without permit per ordDetails
to comply with nov #202423535 front window replacement. remove juliet balcony. update 3rd fl modification. add roof deck at front. ground floor unit to be addressed under seperate permit. unit 201408063132 - legalize dwelling unit without permit per ord | $12,000 |
| Jul 11, 2024 | Completed final sign-off Jan 2025 | 1341 17th Av | Ren Lei Construction Co | install landscaping at front to comply with complaint 202419224Details
install landscaping at front to comply with complaint 202419224 | $1,000 |
| Jul 11, 2024 | Completed final sign-off May 2025 | 172 Arleta Av | Ren Lei Construction Co | partially comply with nov #202420403. add 2 skylights. add landscaping at front. update configuration on 1st floor and add wall to 1st stairs. renew pa 201903195695 under separate permit.Details
partially comply with nov #202420403. add 2 skylights. add landscaping at front. update configuration on 1st floor and add wall to 1st stairs. renew pa 201903195695 under separate permit. | $10,000 |
| Jul 11, 2024 | Completed final sign-off May 2025 | 28 Waterville St | Ren Lei Construction Co | 1. to comply with complaint 202423055. 2)add landscaping at front setback. 3)remove shed (e) shed per 1938 map to remain. 4)first floor modifications (door + 1 internal window & walls). 5) 2nd floor as built mod. (bathroom configuration + closets + remove fire place).Details
1. to comply with complaint 202423055. 2)add landscaping at front setback. 3)remove shed (e) shed per 1938 map to remain. 4)first floor modifications (door + 1 internal window & walls). 5) 2nd floor as built mod. (bathroom configuration + closets + remove fire place). | |
| Jun 14, 2024 | Completed final sign-off Jun 2024 | 215 03rd Av | Ren Lei Construction Co | rev: 202405081685: update eero at front of the 1/f bedroom window to include historice code section 8.503. update 2/f kitchen layout & fire place.Details
rev: 202405081685: update eero at front of the 1/f bedroom window to include historice code section 8.503. update 2/f kitchen layout & fire place. | $5,000 |
| May 8, 2024 | Completed final sign-off Jun 2024 | 215 03rd Av | Ren Lei Construction Co | to comply w/ nov 202421698 to include 1st floor - add wet bar and enclose stairs with (n)wall and door. 2nd floor add window in pantry and glass guardrail. 3rd floor add window in bedroom and bathroom and update name of roof deck, roof framing and light tubeDetails
to comply w/ nov 202421698 to include 1st floor - add wet bar and enclose stairs with (n)wall and door. 2nd floor add window in pantry and glass guardrail. 3rd floor add window in bedroom and bathroom and update name of roof deck, roof framing and light tube | $10,000 |
| Dec 13, 2023 | In progress issued Mar 2024 | 2760 Vallejo St | Ren Lei Construction Co, Matarozzi/Pelsinger Builders Inc., Clayton Timbrell & Co | remove and replace existing failing concrete retaining wall in the rear yard along the east property line.Details
remove and replace existing failing concrete retaining wall in the rear yard along the east property line. | $15,000 |
| Nov 2, 2023 | Completed final sign-off May 2024 | 1674 39th Av | Ren Lei Construction Co | replacing 25' x 8' stucco in kind. replacing (2) windows in the front of the building in kind.Details
replacing 25' x 8' stucco in kind. replacing (2) windows in the front of the building in kind. | $8,000 |
| Aug 28, 2023 | In progress issued Dec 2024 | 742 26th Av | Ren Lei Construction Co | vert+horz addition & remodel. add adu w/2 bdrms & 2 baths at 1st flr. full remodel of 2nd flr+add 2 bdrms and 2 baths. new 3rd flr to include 3 baths 3 bdrms and 1 kitchen. (n) 3rd flr exterior facade to match existing. new rear balconies.Details
vert+horz addition & remodel. add adu w/2 bdrms & 2 baths at 1st flr. full remodel of 2nd flr+add 2 bdrms and 2 baths. new 3rd flr to include 3 baths 3 bdrms and 1 kitchen. (n) 3rd flr exterior facade to match existing. new rear balconies. | $830,000 |
| Jun 30, 2023 | Never finaled issued Jul 2023, no final | 2760 Vallejo St | Ren Lei Construction Co, Matarozzi/Pelsinger Builders Inc. | remove existing plaster at interior only where cracking and failing. replace w/ gyp bd.Details
remove existing plaster at interior only where cracking and failing. replace w/ gyp bd. | $20,000 |
| Jun 8, 2023 | In progress issued Feb 2024 | 2760 Vallejo St | Ren Lei Construction Co, Matarozzi/Pelsinger Builders Inc., Clayton Timbrell & Co | remodel 4 story over basement sfr, modification to rooms & floor layouts, adding bathrooms & kitchen relocation. no modifications to the exterior of building. work limited to interior onlyDetails
remodel 4 story over basement sfr, modification to rooms & floor layouts, adding bathrooms & kitchen relocation. no modifications to the exterior of building. work limited to interior only | $200,000 |
| Apr 11, 2023 | Completed final sign-off Sep 2023 | 517 Ulloa St | Ren Lei Construction Co | rev to pa# 2022-0519-4636: fur out wall on west side of first fl. reconfigure master bathroom and closet and kitchen on 2nd fl. add shearwalls at 2nd floor front walls.Details
rev to pa# 2022-0519-4636: fur out wall on west side of first fl. reconfigure master bathroom and closet and kitchen on 2nd fl. add shearwalls at 2nd floor front walls. | |
| Dec 27, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | Ren Lei Construction Co | replace (e) stucco on all four sidesDetails
replace (e) stucco on all four sides | $6,000 |
| Nov 30, 2022 | Completed final sign-off Sep 2023 | 1335 Divisadero St | Ren Lei Construction Co | 1) revise bpa# 201507010499, 202203109719. 2) reconfigure 3rd floor bathrrom + (3) new skylights. 3) reconfigure second floor dining room wall + add gas fireplace. 4) reconfigure first floor wall.Details
1) revise bpa# 201507010499, 202203109719. 2) reconfigure 3rd floor bathrrom + (3) new skylights. 3) reconfigure second floor dining room wall + add gas fireplace. 4) reconfigure first floor wall. | |
| Nov 23, 2022 | In progress issued Sep 2025 | 2725 Broadway | Ren Lei Construction Co, Green City Construction Inc | basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces.Details
basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces. | $175,000 |
| Nov 23, 2022 | Never finaled issued Jun 2023, no final | 2760 Vallejo St | Ren Lei Construction Co, Matarozzi/Pelsinger Builders Inc., Clayton Timbrell & Co | replace extg foundations and remodel extg basement.Details
replace extg foundations and remodel extg basement. | $175,000 |
| Sep 9, 2022 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | revision to pa# 2019-0515-0690 & 2021-0816-6496: additional structural details for the canopy support at the front entryDetails
revision to pa# 2019-0515-0690 & 2021-0816-6496: additional structural details for the canopy support at the front entry | |
| Jul 8, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | Ren Lei Construction Co | replace (5) windows @ front in-kind sliders, decay stair repair @ front of home, replace in-kindDetails
replace (5) windows @ front in-kind sliders, decay stair repair @ front of home, replace in-kind | $6,500 |
| Jun 28, 2022 | Completed final sign-off May 2024 | 1674 39th Av | Ren Lei Construction Co | 1st fl - remodel bedroom, bathroom, convert family room to bedroom; add 1 bath & kitchenette. eg-02 applied.Details
1st fl - remodel bedroom, bathroom, convert family room to bedroom; add 1 bath & kitchenette. eg-02 applied. | $65,000 |
| May 19, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | Ren Lei Construction Co | one new bath on 2nd fl. add bathroom, family room, wet bar and 2.5 bath on 1st fl.Details
one new bath on 2nd fl. add bathroom, family room, wet bar and 2.5 bath on 1st fl. | $100,000 |
| May 12, 2022 | Never finaled issued May 2022, no final | 3771 Cesar Chavez St | revision to pa# 202012241699. new layout for open kitchen remodel & bathroom relocation. no change to other floorws, exterior nor occupancy.Details
revision to pa# 202012241699. new layout for open kitchen remodel & bathroom relocation. no change to other floorws, exterior nor occupancy. | $20,000 | |
| May 12, 2022 | Completed final sign-off Jan 2023 | 2106 22nd Av | Ren Lei Construction Co | first floor remodel bathroom. convert office to family room and add media room.Details
first floor remodel bathroom. convert office to family room and add media room. | $85,000 |
| Apr 26, 2022 | Completed final sign-off May 2022 | 1557 Francisco St | Ren Lei Construction Co | revise bpa#202102104392. relocate fire place and remove (n) fire place on 3rd fl. reconfigure laundry rm on 3rd fl. relocate fire place and reconfigure closet on 4th fl.Details
revise bpa#202102104392. relocate fire place and remove (n) fire place on 3rd fl. reconfigure laundry rm on 3rd fl. relocate fire place and reconfigure closet on 4th fl. | |
| Mar 10, 2022 | Completed final sign-off Sep 2023 | 1335 Divisadero St | Ren Lei Construction Co | revision to premit 201507010499 convert additional 287 sqft of existing unconditioned space to living space alter window layout at south side elevation. relocate interior stair from 1st to 2nd floor. revise kitchen, master bath, two full bath designs. remove one full bath.Details
revision to premit 201507010499 convert additional 287 sqft of existing unconditioned space to living space alter window layout at south side elevation. relocate interior stair from 1st to 2nd floor. revise kitchen, master bath, two full bath designs. remove one full bath. | $40,000 |
| Feb 3, 2022 | Completed final sign-off Jan 2023 | 2106 22nd Av | Ren Lei Construction Co | replace plaster and insulation. replace 4 windows in the back on 2nd floor (non street facing). remodel 2 bathrooms and kitchen.Details
replace plaster and insulation. replace 4 windows in the back on 2nd floor (non street facing). remodel 2 bathrooms and kitchen. | $80,000 |
| Jan 28, 2022 | In progress issued May 2025 | 4209 Kirkham St | Ren Lei Construction Co | horizontal & vertical addition. (n) unit on (n) 3rd flr(2 bdrms, 2 bthrms, kitchen, living & dining rm). 2nd flr to become 2 bdrms, 2 bthrms, kitchen, liv & ding rm). with (n) bedrm, bath & kit on 1st flr w/2 brner elect top on 1st flr part of unit 4209 w/hallway connection. project per sb9 & sb330.Details
horizontal & vertical addition. (n) unit on (n) 3rd flr(2 bdrms, 2 bthrms, kitchen, living & dining rm). 2nd flr to become 2 bdrms, 2 bthrms, kitchen, liv & ding rm). with (n) bedrm, bath & kit on 1st flr w/2 brner elect top on 1st flr part of unit 4209 w/hallway connection. project per sb9 & sb330. | $650,000 |
| Jan 21, 2022 | In progress issued May 2025 | 1737 Webster St | Ren Lei Construction Co | remodel (e) unit residential home. remodel includes vertical addition for new story and roof deck @ 4th level, and 235 cy excavation for new basement. horizontal expansion, no additional depth into rear proposed, except permitted bay @ second level.Details
remodel (e) unit residential home. remodel includes vertical addition for new story and roof deck @ 4th level, and 235 cy excavation for new basement. horizontal expansion, no additional depth into rear proposed, except permitted bay @ second level. | $800,000 |
| Jan 14, 2022 | Completed final sign-off Aug 2022 | 627 Felton St | Ren Lei Construction Co | to comply with pid complaint # 202185592. add kitchen on 1st fl.Details
to comply with pid complaint # 202185592. add kitchen on 1st fl. | $10,000 |
| Dec 2, 2021 | Completed final sign-off Jan 2023 | 1860 09th Av | Ren Lei Construction Co | as built revision bpa 201608185448. reconfigure 1st floor, add bath on second and third floor, remove bath on 4th.Details
as built revision bpa 201608185448. reconfigure 1st floor, add bath on second and third floor, remove bath on 4th. | $30,000 |
| Sep 9, 2021 | Expired or cancelled withdrawn Mar 2022 | 1557 Francisco St | Ren Lei Construction Co | revision to 202102104392. relocate entry door on 1st fl. relocate fire place and remove n fire place, reconfigure laundry on 3rd fl. reconfig closet and fire place on 4th fl and convert roof to deckDetails
revision to 202102104392. relocate entry door on 1st fl. relocate fire place and remove n fire place, reconfigure laundry on 3rd fl. reconfig closet and fire place on 4th fl and convert roof to deck | $12,000 |
| Aug 16, 2021 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | foundation revision for pa# 201812289328. excavation, concrete foundation, ramps, steps and slab on grade.Details
foundation revision for pa# 201812289328. excavation, concrete foundation, ramps, steps and slab on grade. | $3,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2021 | 3520 Fulton St | Ren Lei Construction Co | revision to pa# 201910104169. show location of 2 existing skylights (one to be replaced in kind) and window on 3rd floor w18x30 replace in kind with temp glazing. u=0.32 max. window not visible from street.Details
revision to pa# 201910104169. show location of 2 existing skylights (one to be replaced in kind) and window on 3rd floor w18x30 replace in kind with temp glazing. u=0.32 max. window not visible from street. | $8,000 |
| Feb 10, 2021 | Completed final sign-off May 2022 | 1557 Francisco St | Ren Lei Construction Co | revision to app#202007160354. relocate wndw and partial south lightwell enclosure on 1st fl. add closet and wine rack & remove interior wall in dining area on 2nd fl. reconfigure closet & remove wndw on 3rd fl. revise closet, wndws, & bath on 4th fl.; 3 kitchens shown in residenceDetails
revision to app#202007160354. relocate wndw and partial south lightwell enclosure on 1st fl. add closet and wine rack & remove interior wall in dining area on 2nd fl. reconfigure closet & remove wndw on 3rd fl. revise closet, wndws, & bath on 4th fl.; 3 kitchens shown in residence | $20,000 |
| Feb 2, 2021 | Completed final sign-off Jan 2023 | 1860 09th Av | Ren Lei Construction Co | revision to pa 201608185448. demo second floor entry approx. 53 sqft. clearly illustrate 100% right side elevation removal (previously approved)Details
revision to pa 201608185448. demo second floor entry approx. 53 sqft. clearly illustrate 100% right side elevation removal (previously approved) | |
| Nov 9, 2020 | Expired or cancelled expired Sep 2026 | 751 25th Av | Ren Lei Construction Co | ref pa# 201905150690. mechanical & electrical. new forced air unit. new condenser unit. new exhaust fan. new duct work. furnish & install various equipment, panelboard, conductors, conduits, lighting fixtures, & receptacles.Details
ref pa# 201905150690. mechanical & electrical. new forced air unit. new condenser unit. new exhaust fan. new duct work. furnish & install various equipment, panelboard, conductors, conduits, lighting fixtures, & receptacles. | $150,000 |
| Jul 16, 2020 | Completed final sign-off May 2022 | 1557 Francisco St | Ren Lei Construction Co | replace front windows inkind, same size, location w/windows w/true light;relocate stairs & add elevator, rebuild entry stairs to be code compiant, enclose north lightwell, add 1/2 bathrm on 1st floor, relocate kitchen on 2nd fl; add stairs to rear yard, add bathroom to 3rd floor, remodelDetails
replace front windows inkind, same size, location w/windows w/true light;relocate stairs & add elevator, rebuild entry stairs to be code compiant, enclose north lightwell, add 1/2 bathrm on 1st floor, relocate kitchen on 2nd fl; add stairs to rear yard, add bathroom to 3rd floor, remodel | $230,000 |
| Jun 18, 2020 | Completed final sign-off Jun 2020 | 2327 Fillmore St | Ren Lei Construction Co | ref pa# 201807275778. add 3m safety and security window laminate film - safety sfo (sh7clarl) at all interior/exterior guardrail.Details
ref pa# 201807275778. add 3m safety and security window laminate film - safety sfo (sh7clarl) at all interior/exterior guardrail. | $4,150 |
| Jun 8, 2020 | Completed final sign-off May 2022 | 1557 Francisco St | Ren Lei Construction Co | 1st flr: remodel existing bathroom and ktichen in-kind. 2nd flr: remodel existing kitchen in-kind. 3rd flr: remodel existing 4 bathrooms and laundry in-kind. 4th flr: remodel existing bathroom. remove lath & plaster, insulate exterior walls, roof & 1st flr ceiling (r19) with batt insulation.Details
1st flr: remodel existing bathroom and ktichen in-kind. 2nd flr: remodel existing kitchen in-kind. 3rd flr: remodel existing 4 bathrooms and laundry in-kind. 4th flr: remodel existing bathroom. remove lath & plaster, insulate exterior walls, roof & 1st flr ceiling (r19) with batt insulation. | $150,000 |
| May 28, 2020 | Completed final sign-off Jun 2020 | 2327 Fillmore St | Ren Lei Construction Co | to obtain final inspection for work approved under pa #2015 0821 4968. all work has been completed.Details
to obtain final inspection for work approved under pa #2015 0821 4968. all work has been completed. | |
| Mar 3, 2020 | Completed final sign-off Jan 2024 | 1369 Sanchez St | Ren Lei Construction Co | to comply w/ nov #201882681 per ord #162-16. adu @ 1st floor. demolition plans. revise front & rear elevations. provide spiral stairs @ rear from 1st to 2nd fl. new adu at ground floor. change of use from r-3 to r-2, comply with 2019 sfebc section 506.4.3.3Details
to comply w/ nov #201882681 per ord #162-16. adu @ 1st floor. demolition plans. revise front & rear elevations. provide spiral stairs @ rear from 1st to 2nd fl. new adu at ground floor. change of use from r-3 to r-2, comply with 2019 sfebc section 506.4.3.3 | $12,000 |
| Dec 31, 2019 | In progress issued Apr 2025 | 538 23rd Av | Ren Lei Construction Co | vertical and horizontial addition. add two story and one unit. convert two bed two bathroom to three bed and three bathroom at second floor. new 4 bedroom 4 bathroom on third and fourth floor.Details
vertical and horizontial addition. add two story and one unit. convert two bed two bathroom to three bed and three bathroom at second floor. new 4 bedroom 4 bathroom on third and fourth floor. | $438,000 |
| Dec 18, 2019 | Completed final sign-off Jun 2020 | 1415 Clement St | Ren Lei Construction Co | replacing kitchen cabinets and kitchen faucet in kindDetails
replacing kitchen cabinets and kitchen faucet in kind | $10,000 |
| Oct 17, 2019 | Completed final sign-off Feb 2021 | 3520 Fulton St | Ren Lei Construction Co | window replacement at front as in-kind with wood windows muntin tdl and ogee.Details
window replacement at front as in-kind with wood windows muntin tdl and ogee. | $5,000 |
| Oct 10, 2019 | Completed final sign-off Apr 2021 | 3520 Fulton St | Ren Lei Construction Co | new 2 bedrooms 2 bathrooms unit on basement level. add bathroom to 2nd floor. replace rear windows and delay repair of deck and stair as in kind less than 50%Details
new 2 bedrooms 2 bathrooms unit on basement level. add bathroom to 2nd floor. replace rear windows and delay repair of deck and stair as in kind less than 50% | $96,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2020 | 750 26th Av | Ren Lei Construction Co | replacing existing 10' wire fence on four sides. street facing wil be 75% open.Details
replacing existing 10' wire fence on four sides. street facing wil be 75% open. | $25,000 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 345 Gambier St | Ren Lei Construction Co | retiling bath, replace kitchen countertop on 2nd floor. on ground floor: remove and replace sheetrock btw garage and habitable space. no structural and no wall moveDetails
retiling bath, replace kitchen countertop on 2nd floor. on ground floor: remove and replace sheetrock btw garage and habitable space. no structural and no wall move | $5,000 |
| Sep 6, 2019 | Completed final sign-off Mar 2021 | 2424 Divisadero St | Ren Lei Construction Co | reroofingDetails
reroofing | $40,000 |
| Sep 6, 2019 | Completed final sign-off Mar 2021 | 2424 Divisadero St | Ren Lei Construction Co | revision of pa 201907246793. replacing plaster w/ sheetrock. install insulation.Details
revision of pa 201907246793. replacing plaster w/ sheetrock. install insulation. | $80,000 |
| Jul 24, 2019 | Completed final sign-off Mar 2021 | 2424 Divisadero St | Ren Lei Construction Co, Alex Builder Inc | remodel kitchen and remove rear yard bay window. remodel 5 bathrooms, all new electrical work( abandon old knob and tube where possible) convert unheated storage @ 2nd floor to heated rooms and media, hobby. remove photography studio/darkroom at front of 2nd floor. repair dry rot @ rear.Details
remodel kitchen and remove rear yard bay window. remodel 5 bathrooms, all new electrical work( abandon old knob and tube where possible) convert unheated storage @ 2nd floor to heated rooms and media, hobby. remove photography studio/darkroom at front of 2nd floor. repair dry rot @ rear. | $578,440 |
| Jul 22, 2019 | Completed final sign-off Oct 2019 | 246 11th Av | Ren Lei Construction Co | replace siding in the front and on the side of the building to match both in materials and architecturally. per google photo 2018Details
replace siding in the front and on the side of the building to match both in materials and architecturally. per google photo 2018 | $23,000 |
| May 31, 2019 | Completed final sign-off Sep 2019 | 225 17th Av | Ren Lei Construction Co | revise apprved pa# 2019-0429-9024Details
revise apprved pa# 2019-0429-9024 | |
| May 15, 2019 | Expired or cancelled expired Sep 2026 | 751 25th Av | Ren Lei Construction Co | superstructure revision to app#200905188574 structural framing and architectural revisions to inerior partitions and exterior fenestration.Details
superstructure revision to app#200905188574 structural framing and architectural revisions to inerior partitions and exterior fenestration. | |
| Apr 30, 2019 | Expired or cancelled cancelled Jan 2026 | 751 25th Av | Ren Lei Construction Co | foundation revision for pa200905188574: excavation, concrete, fountains, ramps, steps & slab on grade. structural revision only.Details
foundation revision for pa200905188574: excavation, concrete, fountains, ramps, steps & slab on grade. structural revision only. | |
| Apr 29, 2019 | Completed final sign-off Sep 2019 | 225 17th Av | Ren Lei Construction Co | revision to approved bpa# 2018-0525-0259. see ref. p.a. for structural special inspections and observations.Details
revision to approved bpa# 2018-0525-0259. see ref. p.a. for structural special inspections and observations. | |
| Mar 19, 2019 | Completed final sign-off Jan 2025 | 172 Arleta Av | Ren Lei Construction Co | as built revision pa 2016-0114-7154Details
as built revision pa 2016-0114-7154 | |
| Jan 8, 2019 | Completed final sign-off May 2020 | 2327 Fillmore St | Ren Lei Construction Co | as-biuilt revision to bpa 2018-0727-5778.Details
as-biuilt revision to bpa 2018-0727-5778. | |
| Dec 28, 2018 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | recommencement and completion of work approved under pa # 200905188524, 201210252838, 201206011732Details
recommencement and completion of work approved under pa # 200905188524, 201210252838, 201206011732 | $250,000 |
| Oct 24, 2018 | Never finaled issued Feb 2019, no final | 1376 20th Av | Ren Lei Construction Co | legalize unit on first flr per ord# 43-14 w/ two bed, bath unit and kitchen & living room.Details
legalize unit on first flr per ord# 43-14 w/ two bed, bath unit and kitchen & living room. | $80,000 |
| Oct 1, 2018 | Completed final sign-off Feb 2021 | 3520 Fulton St | Ren Lei Construction Co | kitchen 15'x15' & 3 5'x8' bathrooms remodel. all remodel in same location. exploratory demo & lath & plaster removal approx. 200 sq ft.Details
kitchen 15'x15' & 3 5'x8' bathrooms remodel. all remodel in same location. exploratory demo & lath & plaster removal approx. 200 sq ft. | $65,568 |
| Jul 27, 2018 | Completed final sign-off Jun 2020 | 2327 Fillmore St | Ren Lei Construction Co | to comply with nov 201876673 add 3 story elevator. ne bathroom, bedroom & family room on 1st flr. new roof deck on attice level and convert attic to habitable space and add (5) 8'x8' dormers. remove stucco on front facade and restore (e) wood siding. convert 2 2 bedrm/2 bathrooms to 1,3,3 aDetails
to comply with nov 201876673 add 3 story elevator. ne bathroom, bedroom & family room on 1st flr. new roof deck on attice level and convert attic to habitable space and add (5) 8'x8' dormers. remove stucco on front facade and restore (e) wood siding. convert 2 2 bedrm/2 bathrooms to 1,3,3 a | $180,000 |
| Jul 12, 2018 | Expired or cancelled withdrawn Jun 2020 | 2327 Fillmore St | Ren Lei Construction Co | remove all stucco at front facade to reveal historic siding for documentation.Details
remove all stucco at front facade to reveal historic siding for documentation. | $180,000 |
| Jul 2, 2018 | Completed final sign-off May 2020 | 2327 Fillmore St | Ren Lei Construction Co | to comply with complaint 201875245 voluntary strengthening on 2nd fl and 3rd fl. upgrade floor framing for 3rd floor ceiling and 3rd floor; strengthen floor sheating.Details
to comply with complaint 201875245 voluntary strengthening on 2nd fl and 3rd fl. upgrade floor framing for 3rd floor ceiling and 3rd floor; strengthen floor sheating. | $88,000 |
| Jun 29, 2018 | Completed final sign-off May 2020 | 2327 Fillmore St | Ren Lei Construction Co | remodeling 5-1/2 bathrooms and 2 kitchens,upgrade allplumbing and electircval to 200a.Details
remodeling 5-1/2 bathrooms and 2 kitchens,upgrade allplumbing and electircval to 200a. | $140,000 |
| May 25, 2018 | Completed final sign-off Sep 2019 | 225 17th Av | Ren Lei Construction Co | revision to 201403261777 s1 convert single family home to 2 unit residentialDetails
revision to 201403261777 s1 convert single family home to 2 unit residential | $60,000 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 172 Arleta Av | Ren Lei Construction Co | street spaceDetails
street space | |
| Mar 8, 2018 | Completed final sign-off Apr 2018 | 215 03rd Av | Ren Lei Construction Co | as built revision 201502239089 r\structural revisionDetails
as built revision 201502239089 r\structural revision | |
| Dec 28, 2017 | Completed final sign-off Mar 2019 | 1720 Eucalyptus Dr | Ren Lei Construction Co | remodel (e) family rm to relocate the (e) bathroom on the grnd flrDetails
remodel (e) family rm to relocate the (e) bathroom on the grnd flr | $25,000 |
| Nov 2, 2017 | Never finaled issued Nov 2017, no final | 371 12th Av | Ren Lei Construction Co | as built revision to pa#201410027946, to delete half bathroom on 1/f and convert to closet.Details
as built revision to pa#201410027946, to delete half bathroom on 1/f and convert to closet. | |
| Nov 2, 2017 | Completed final sign-off Dec 2017 | 31 Cortland Av | Ren Lei Construction Co | revise pa#201606240887, as built revision to reconfigure 3/f kitchen, 2/f closets and half bathroom, relocate washer/dryer and furnace on 1/f.Details
revise pa#201606240887, as built revision to reconfigure 3/f kitchen, 2/f closets and half bathroom, relocate washer/dryer and furnace on 1/f. | |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 268 Wawona St | Ren Lei Construction Co | replace kitchen countertop, 2 bathrooms tiles, remove sheetrock on hallway/living room ceiling. all works are done on 2nd floor only.Details
replace kitchen countertop, 2 bathrooms tiles, remove sheetrock on hallway/living room ceiling. all works are done on 2nd floor only. | $15,000 |
| Jul 27, 2017 | Completed final sign-off Mar 2018 | 1046 Jackson St | Ren Lei Construction Co | to comply w/nov #201794041 - replacement of two new 45 min rated proeprty line windows at the north elevation at the third floor bedroom. no work visible from street.Details
to comply w/nov #201794041 - replacement of two new 45 min rated proeprty line windows at the north elevation at the third floor bedroom. no work visible from street. | $4,000 |
| May 12, 2017 | Completed final sign-off Nov 2017 | 3535 Clement St | Ren Lei Construction Co | decay repair not to exceed 50% at front of the home from interior (work not visible from street) decay header replacement first and second flr. replace decay studs as in kind. maher naDetails
decay repair not to exceed 50% at front of the home from interior (work not visible from street) decay header replacement first and second flr. replace decay studs as in kind. maher na | $10,000 |
| May 3, 2017 | Completed final sign-off May 2020 | 2327 Fillmore St | Ren Lei Construction Co | re-roofingDetails
re-roofing | $7,000 |
| Apr 28, 2017 | Completed final sign-off May 2020 | 2327 Fillmore St | Ren Lei Construction Co | stucco repair & replacement , decay repair as in kind not to exceed 50% lathe & plaster removal and replacement exploritoryDetails
stucco repair & replacement , decay repair as in kind not to exceed 50% lathe & plaster removal and replacement exploritory | $15,000 |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 2300 Mason St | Ren Lei Construction Co | add roll up utility accessible door to ground level commercial space. n/a maherDetails
add roll up utility accessible door to ground level commercial space. n/a maher | $7,200 |
| Nov 21, 2016 | Completed final sign-off Aug 2017 | 2300 Mason St | Ren Lei Construction Co | renovation of top 2 floors of an (e) 3 story commercial bld. change of use for addition of residence. variance required for open space, minor facade alterations include street level entry door at mason st. addition of 2nd flr window at mason. addition of 2ns & 3rd flr windows at francisco maher naDetails
renovation of top 2 floors of an (e) 3 story commercial bld. change of use for addition of residence. variance required for open space, minor facade alterations include street level entry door at mason st. addition of 2nd flr window at mason. addition of 2ns & 3rd flr windows at francisco maher na | $51,000 |
| Sep 15, 2016 | Never finaled issued Sep 2016, no final | 546 34th Av | Ren Lei Construction Co | as built revision for interior partitions/ ref app#201305156961, 201601147121 and 201604215318Details
as built revision for interior partitions/ ref app#201305156961, 201601147121 and 201604215318 | |
| Sep 15, 2016 | Completed final sign-off Oct 2016 | 3695 Market St | Ren Lei Construction Co | as built revision interior wall adjustments. ref app#201504133511 and 201512084484Details
as built revision interior wall adjustments. ref app#201504133511 and 201512084484 | |
| Aug 18, 2016 | Completed final sign-off Jan 2023 | 1860 09th Av | Ren Lei Construction Co | horizontal & vertical addition. (2 story to 4 story). new configuration of 2 bedrooms & 2 bathrooms and 4 bedrooms & 3 bathrooms.Details
horizontal & vertical addition. (2 story to 4 story). new configuration of 2 bedrooms & 2 bathrooms and 4 bedrooms & 3 bathrooms. | $165,000 |
| Aug 8, 2016 | Never finaled issued Aug 2016, no final | 750 26th Av | Ren Lei Construction Co | repair dry rot under siding. visible to the street.Details
repair dry rot under siding. visible to the street. | $5,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2017 | 31 Cortland Av | Ren Lei Construction Co | four new dormers, add 2 bathrooms and 2 half bathrooms. relocate unit 2 to 1st floor.Details
four new dormers, add 2 bathrooms and 2 half bathrooms. relocate unit 2 to 1st floor. | $65,000 |
| May 27, 2016 | Completed final sign-off Sep 2016 | 175 Princeton St | Ren Lei Construction Co | remodeling 2 bathrooms& 1 kitchen, non structural.Details
remodeling 2 bathrooms& 1 kitchen, non structural. | $45,000 |