Block 5975, lot 010
627 Felton St
- City’s use
- Single Family Residential
- Built
- 1914
- Stories
- 3
- Units
- 1
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 2,943 sq ft
- Lot
- 2,517 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2022 | Completed final sign-off Aug 2022 | 627 Felton St | Ren Lei Construction Co | to comply with pid complaint # 202185592. add kitchen on 1st fl.Details
to comply with pid complaint # 202185592. add kitchen on 1st fl. | $10,000 |
| Jan 14, 2019 | Completed final sign-off Aug 2022 | 627 Felton St | to comply w/ n.o.v 201898117. merge bedroom and office at second flr, add 1 windows and door and change one window.Details
to comply w/ n.o.v 201898117. merge bedroom and office at second flr, add 1 windows and door and change one window. | $10,000 | |
| Mar 14, 2017 | Completed final sign-off Apr 2017 | 627 Felton St | Kevin L V Smith Your Energy Source | building permit for pv system to accompany solar electrical permit as required by eid. isntall solar flashings.Details
building permit for pv system to accompany solar electrical permit as required by eid. isntall solar flashings. | $4,000 |
| Feb 1, 2012 | Completed final sign-off Sep 2012 | 627 Felton St | Ren Lei Construction Co | as built revision, reference approved app#201107140259 and 201111088485. reconfigure attic bathroom, remove north wall windows, add bathroom and office at 2nd floor reconfigure rear stairs.Details
as built revision, reference approved app#201107140259 and 201111088485. reconfigure attic bathroom, remove north wall windows, add bathroom and office at 2nd floor reconfigure rear stairs. | $10,000 |
| Nov 8, 2011 | Completed final sign-off Sep 2012 | 627 Felton St | Ren Lei Construction Co | reference approved bldg app#201107140259. elevation of bldg per bldg inspector request showing roof slope. to comply with nov 200990480Details
reference approved bldg app#201107140259. elevation of bldg per bldg inspector request showing roof slope. to comply with nov 200990480 | |
| Jul 14, 2011 | Completed final sign-off Sep 2012 | 627 Felton St | Ren Lei Construction Co | to reconfigure interior space, ref app#200707187118. to comply nov 200990780.to relocate interior stairway to reduce from 4 full baths to 3.5 to convert extg storage to new bedroom and remove extg workshop at ground floor. to reconfigure at 2nd floor new bedroom, new kich, new dinningrm,nw living rmDetails
to reconfigure interior space, ref app#200707187118. to comply nov 200990780.to relocate interior stairway to reduce from 4 full baths to 3.5 to convert extg storage to new bedroom and remove extg workshop at ground floor. to reconfigure at 2nd floor new bedroom, new kich, new dinningrm,nw living rm | $31,500 |
| Jun 7, 2011 | Never finaled issued Jun 2011, no final | 627 Felton St | street spaceDetails
street space | ||
| May 26, 2011 | Completed final sign-off Sep 2012 | 627 Felton St | Ren Lei Construction Co | to complete work and obtain final inspection for work approved under pa#200707187118Details
to complete work and obtain final inspection for work approved under pa#200707187118 | |
| May 26, 2011 | Expired or cancelled expired Mar 2013 | 627 Felton St | Ren Lei Construction Co | to complete work and obtain final inspection for work approved under pa#200707187125Details
to complete work and obtain final inspection for work approved under pa#200707187125 | |
| May 26, 2011 | Expired or cancelled expired Mar 2013 | 627 Felton St | Ren Lei Construction Co | remove fire damage, provide temporary shoring to meet unsafe condition. temporary shoring will be design build under license civil engineer. future permit required for final renovation and and 201197907.Details
remove fire damage, provide temporary shoring to meet unsafe condition. temporary shoring will be design build under license civil engineer. future permit required for final renovation and and 201197907. | $6,000 |
| May 29, 2009 | Expired or cancelled withdrawn May 2011 | 627 Felton St | remove fire damage debris-install 12 linear ft of temporary support for 2nd floor, install 5 braces for roof, ref nov# 200990480. additional permit required for complianceDetails
remove fire damage debris-install 12 linear ft of temporary support for 2nd floor, install 5 braces for roof, ref nov# 200990480. additional permit required for compliance | $6,000 | |
| Jul 18, 2007 | Expired or cancelled expired Mar 2013 | 627 Felton St | remodel (e) kitchen & bathroom upstairs. about 100 sq. ft. dry wall repair. no structural work.Details
remodel (e) kitchen & bathroom upstairs. about 100 sq. ft. dry wall repair. no structural work. | $50,000 | |
| Jul 18, 2007 | Expired or cancelled expired Mar 2013 | 627 Felton St | add family rooom, master bedroom and bathrooms per plans on ground floor. to add 1 bathroom on 2nd floor.Details
add family rooom, master bedroom and bathrooms per plans on ground floor. to add 1 bathroom on 2nd floor. | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ren Lei Construction Co (7), Kevin L V Smith Your Energy Source
- Engineers
- Ronald Yu (3), Philip Whitehead
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.