Charles Li
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- S & A Engineering Design
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Aug 2026
191 permits since 2000 (engineer on 159 permits, architect on 30 permits, authorized agent-others on 1 permit, designer on 1 permit): 105 completed, 19 in progress, 30 never finaled, 37 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 191.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 6143 California St | Yim Kam Kong Dba Yims Construction Co. | replace (e) furnance at ground floor and add 1 new furnance at 3rd flr. ref#: 202504043782.Details
replace (e) furnance at ground floor and add 1 new furnance at 3rd flr. ref#: 202504043782. | $10,000 |
| Jul 16, 2026 | In progress issued Jul 2026 | 112 Stanyan St | S L Y Construction Company | revision to approved pa# 202603197965: reconfigure rooms layout at ground floor. reconfigure (e) bathroom at 2nd floor. remodel (e) bathroom at 3rd fl. remove (e) posts & beam at ground fl & replace w/ walls & foundation. replace (e) windows/skylights per plan.Details
revision to approved pa# 202603197965: reconfigure rooms layout at ground floor. reconfigure (e) bathroom at 2nd floor. remodel (e) bathroom at 3rd fl. remove (e) posts & beam at ground fl & replace w/ walls & foundation. replace (e) windows/skylights per plan. | $20,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 359 Grant Av | Zhang General Construction | ti: remodel (e) restaurant (limited) at g/f including bar area.Details
ti: remodel (e) restaurant (limited) at g/f including bar area. | $100,000 |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 317 Winding Wy | to comply with nov 202542298. to install new rear concrete retaining wall.Details
to comply with nov 202542298. to install new rear concrete retaining wall. | $20,000 | |
| May 19, 2026 | Completed final sign-off Oct 2026 | 1868 Greenwich St | Iy Development & Renovation Inc | construct new 14" plus or minus tall wood deck within rear yard area. per plan at ground level,Details
construct new 14" plus or minus tall wood deck within rear yard area. per plan at ground level, | $15,000 |
| May 12, 2026 | In progress issued Jun 2026 | 2699 Taylor St | Zhang General Construction | t.i. 1) remodel existing restaurant at ground floor including install new kitchen hood system. 2) add new kitchen.Details
t.i. 1) remodel existing restaurant at ground floor including install new kitchen hood system. 2) add new kitchen. | $23,000 |
| Apr 23, 2026 | Completed final sign-off Jun 2026 | 4039 18th St | Topview Construction Group Inc | defer submittal for bpa:202412187074 (renewed on bpa: 202603187819) to replace (e) cooking equipments per plan, no changes to (e) hood/ exhaust systems. no change to (e) lightingDetails
defer submittal for bpa:202412187074 (renewed on bpa: 202603187819) to replace (e) cooking equipments per plan, no changes to (e) hood/ exhaust systems. no change to (e) lighting | $5,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 2542 Bryant St | Iy Development & Renovation Inc | unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deckDetails
unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deck | $150,000 |
| Apr 6, 2026 | In progress issued Apr 2026 | 206 Cordova St | revision to bpa: 202512020782 to: 1) add 1 bathroom at 3rd floor. 2) add 1 powder room at 2nd floor. (per plan)Details
revision to bpa: 202512020782 to: 1) add 1 bathroom at 3rd floor. 2) add 1 powder room at 2nd floor. (per plan) | $3,000 | |
| Mar 19, 2026 | In progress issued Apr 2026 | 112 Stanyan St | S L Y Construction Company | 2 new bedrooms, 2 bathrooms, 1 media rm to be constructed at ground floor per plan. reconfigure (e) kitchen layout & bath rm at 2nd floor. infill (e) lightwell at 2nd floorDetails
2 new bedrooms, 2 bathrooms, 1 media rm to be constructed at ground floor per plan. reconfigure (e) kitchen layout & bath rm at 2nd floor. infill (e) lightwell at 2nd floor | $260,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 3253 Mission St | Acer-G Engineering | 1. install new heat pump system including ductwork and air outlet. install new kitchen hood exhaust system. install new lighting and receptacles. defer sumbittal. ref #202508072493 & 202212309503Details
1. install new heat pump system including ductwork and air outlet. install new kitchen hood exhaust system. install new lighting and receptacles. defer sumbittal. ref #202508072493 & 202212309503 | $90,000 |
| Nov 26, 2025 | Completed final sign-off Mar 2026 | 2301 Noriega St | Nbay Construction And Remodeling Inc | tenant improvement 3 new private offices to be constructed within e office area at ground floor per plan. change e) bank to be office use.Details
tenant improvement 3 new private offices to be constructed within e office area at ground floor per plan. change e) bank to be office use. | $50,000 |
| Nov 24, 2025 | Completed final sign-off Apr 2026 | 2297 Mission St | Iy Development & Renovation Inc | unit 2299 - revision to pa 202503132225 to change rooftop ac unit to split heat pump systemDetails
unit 2299 - revision to pa 202503132225 to change rooftop ac unit to split heat pump system | |
| Oct 8, 2025 | In progress issued Nov 2025 | 398 Christopher Dr | Rati Construction Inc | revision to permit 202507231456. reconfigure bathrooms layout at ground floor. add new bath and dormers at (e) attic space and construct stair from 2nd floor to attic.Details
revision to permit 202507231456. reconfigure bathrooms layout at ground floor. add new bath and dormers at (e) attic space and construct stair from 2nd floor to attic. | $45,000 |
| Oct 8, 2025 | In progress filed Oct 2025, not yet issued | 3734 Judah St | adding (2) bedrooms and (1) bath, kitchen, and living area on the ground level to comply with nov# ces-201519891 and ces-201522161.Details
adding (2) bedrooms and (1) bath, kitchen, and living area on the ground level to comply with nov# ces-201519891 and ces-201522161. | $20,000 | |
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 594 Vermont St | adjust outside air air volume for (e) furnace due to occupancy change; install new ductwork and air outlet; replace (e) condenser; install new lighting & switches, receptacles ref 202502100053Details
adjust outside air air volume for (e) furnace due to occupancy change; install new ductwork and air outlet; replace (e) condenser; install new lighting & switches, receptacles ref 202502100053 | $30,000 | |
| Apr 9, 2025 | In progress issued Apr 2025 | 1119 Shotwell St | All Type Remodeling Inc | replace (e) concrete, slab and foundation per plan; replace (e) piping & electrical wiring @ ground floor; provide 5/8" type'x' gyped on wand eiling @ ground floorDetails
replace (e) concrete, slab and foundation per plan; replace (e) piping & electrical wiring @ ground floor; provide 5/8" type'x' gyped on wand eiling @ ground floor | $8,000 |
| Feb 13, 2025 | Expired or cancelled expired Aug 2026 | 125 Colon Av | revision to pa 202409271878 in compliance with planning enforcement 2024010936enf - to restore removed chimney to original location; new windows next to chimney for new room at ground fl; close (e) windows facing south along property line @ ground & 2nd flDetails
revision to pa 202409271878 in compliance with planning enforcement 2024010936enf - to restore removed chimney to original location; new windows next to chimney for new room at ground fl; close (e) windows facing south along property line @ ground & 2nd fl | $8,000 | |
| Feb 11, 2025 | In progress issued Jan 2026 | 1747 Buchanan St | 328 Construction | ref ti permit 202410163077. restaurant tenant improvement (mep), type 1 kitchen hood.Details
ref ti permit 202410163077. restaurant tenant improvement (mep), type 1 kitchen hood. | $50,000 |
| Oct 28, 2024 | In progress filed Oct 2024, not yet issued | 210 Everglade Dr | add new bedroom and bath at ground floor and replace (e) interior stair with new - from 2nd floor to ground.Details
add new bedroom and bath at ground floor and replace (e) interior stair with new - from 2nd floor to ground. | $80,000 | |
| Oct 25, 2024 | In progress filed Oct 2024, not yet issued | 217 Beverly St | add (n) wood deck at the 2nd fl rear of the bldg with stairs. legalize unpermitted 2 bathrooms & hallway with countertop, sink, electrical stove (2 burners), family & bedroom at ground flDetails
add (n) wood deck at the 2nd fl rear of the bldg with stairs. legalize unpermitted 2 bathrooms & hallway with countertop, sink, electrical stove (2 burners), family & bedroom at ground fl | $100,000 | |
| Oct 4, 2024 | Completed final sign-off Feb 2025 | 2000 Grove St | revision to pa#: 2018-0509-8704. install new heat pump system (split) for new adu unit#a at ground floor. pa#: 2018-0509-8704 called for direct-vent wall furnace for bedroom use.Details
revision to pa#: 2018-0509-8704. install new heat pump system (split) for new adu unit#a at ground floor. pa#: 2018-0509-8704 called for direct-vent wall furnace for bedroom use. | $15,000 | |
| Aug 8, 2024 | Completed final sign-off Jul 2025 | 400 Dewey Bl | Wong Electric Inc | remove (e) 400a main switch board & replace w/ new 1200a main switch board. add 3 additional gas meters & relocate 4 e) gas meters. provide gas trench. provide electric trenches & put in conduuts (electrical & plumbing work only)Details
remove (e) 400a main switch board & replace w/ new 1200a main switch board. add 3 additional gas meters & relocate 4 e) gas meters. provide gas trench. provide electric trenches & put in conduuts (electrical & plumbing work only) | $30,000 |
| May 29, 2024 | In progress filed May 2024, not yet issued | 3529 Mission St | Hong's General Construction Inc | to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building.Details
to comply with nov 202290782. to clarify existing foundation condition for the original plan approved pa# 201802090958 and 202204041535. no change to original height of building. | $180,000 |
| Mar 15, 2024 | Completed final sign-off Jan 2026 | 43 Ervine St | Sld Construction Inc | add new family room @ basement & install new stair from ground to basement. provide sprinklers at basement per nfpa 13d.Details
add new family room @ basement & install new stair from ground to basement. provide sprinklers at basement per nfpa 13d. | $30,000 |
| Mar 5, 2024 | In progress issued Feb 2025 | 1919 34th Av | rear addition at 2nd floor including 2 bedrooms, 1 bath. reconfigure 2nd floor layout per plan.Details
rear addition at 2nd floor including 2 bedrooms, 1 bath. reconfigure 2nd floor layout per plan. | $160,000 | |
| Feb 23, 2024 | Completed final sign-off Feb 2025 | 5145 Geary Bl | Paragon Management Construction | install new lighting fixtures ref pa 202009305602Details
install new lighting fixtures ref pa 202009305602 | $15,000 |
| Feb 23, 2024 | Completed final sign-off Mar 2024 | 15 San Gabriel Av | revision to pa 202309146642 to replace (e) furnace with new high efficiency type. revise middle wall location (move 1 ft to the right of the existing location)Details
revision to pa 202309146642 to replace (e) furnace with new high efficiency type. revise middle wall location (move 1 ft to the right of the existing location) | $1,000 | |
| Jan 8, 2024 | Completed final sign-off Feb 2025 | 4444 Balboa St | Donald Wu | 1)fire damaged repairing to fix all the damaged rooms at 3rd floor unit #306. replace and install all plmbg, mech, elect.l work to current code. replace all gyped as well as flooring finishing match extg like kind. to comply with nov #202307502. 2)repair partial fire damaged roofing per plan.Details
1)fire damaged repairing to fix all the damaged rooms at 3rd floor unit #306. replace and install all plmbg, mech, elect.l work to current code. replace all gyped as well as flooring finishing match extg like kind. to comply with nov #202307502. 2)repair partial fire damaged roofing per plan. | $160,000 |
| Nov 29, 2023 | Completed final sign-off Mar 2024 | 15 San Gabriel Av | revision to pa# 202309146642, to revise front wall foundation detail.Details
revision to pa# 202309146642, to revise front wall foundation detail. | $10,000 | |
| Nov 29, 2023 | Expired or cancelled expired Aug 2026 | 125 Colon Av | revision to pa# 202308114288, to low down partial floor slab to match (e) slab at ground floor per plan.Details
revision to pa# 202308114288, to low down partial floor slab to match (e) slab at ground floor per plan. | $10,000 | |
| Nov 8, 2023 | In progress issued Oct 2025 | 961 Lombard St | Shek's Construction Co | construct new family room, office, den, and bathroom at ground floor. replace (e) foundation per plan at ground floor.Details
construct new family room, office, den, and bathroom at ground floor. replace (e) foundation per plan at ground floor. | $120,000 |
| Nov 1, 2023 | Completed final sign-off Mar 2025 | 105 Skyview Wy | Y& G Construction Inc | legalize (e) rooms downstairs, 1-bath, media, home office, and bedroom; construct new wood deck attached to rear of house @ 2/fDetails
legalize (e) rooms downstairs, 1-bath, media, home office, and bedroom; construct new wood deck attached to rear of house @ 2/f | $120,000 |
| Sep 15, 2023 | In progress issued Oct 2023 | 574 44th Av | Taico Builder Inc | fire damage repairing to fix the damaged bathrooms, kitchen and rooms downstairs at 2nd & ground flrs. replace & upgrade all bldg, mep to current code. repair fire damaged roofing to current code in compliance of nov# 202309072.Details
fire damage repairing to fix the damaged bathrooms, kitchen and rooms downstairs at 2nd & ground flrs. replace & upgrade all bldg, mep to current code. repair fire damaged roofing to current code in compliance of nov# 202309072. | $220,000 |
| Sep 14, 2023 | Completed final sign-off Mar 2024 | 15 San Gabriel Av | new rooms to be constructed at downstair, including 1 bed, 1 office, 1 primary & 2 bathrooms. replace (e) footing & conc slab per plan at ground floor. add rear stair with landing to the existing bldg at 2nd flr, repaur existing front stairs.Details
new rooms to be constructed at downstair, including 1 bed, 1 office, 1 primary & 2 bathrooms. replace (e) footing & conc slab per plan at ground floor. add rear stair with landing to the existing bldg at 2nd flr, repaur existing front stairs. | $120,000 | |
| Aug 11, 2023 | Completed final sign-off Aug 2026 | 125 Colon Av | Donald Wu | remodel (e) bathrooms & kitchen at 2nd fl. relocate (e) stair from 2nd to ground fl. new rooms downstair. replace (e) foundation & slap, footing with post at ground fl. replace (e) gypbd with new 5/8" type x. no exterior work.Details
remodel (e) bathrooms & kitchen at 2nd fl. relocate (e) stair from 2nd to ground fl. new rooms downstair. replace (e) foundation & slap, footing with post at ground fl. replace (e) gypbd with new 5/8" type x. no exterior work. | $90,000 |
| Jun 5, 2023 | Completed final sign-off Mar 2024 | 1639 Polk St | Yes General Construction Builder Llc | establish "union dumpling" restaurant. scope of work includes new ktichen equipment per plan. (e) kitchen hood to remain.Details
establish "union dumpling" restaurant. scope of work includes new ktichen equipment per plan. (e) kitchen hood to remain. | $100,000 |
| May 30, 2023 | Never finaled filed May 2023, never issued | 366 Howth St | one story new rear addition including 1 bedroom with full bathroom.Details
one story new rear addition including 1 bedroom with full bathroom. | $85,000 | |
| Dec 15, 2022 | Expired or cancelled withdrawn Mar 2025 | 2924 Sacramento St | add new adu @ ground floor per ordinance 162-16 including 2 bedrooms,2 baths & 1 kitchen, living room.Details
add new adu @ ground floor per ordinance 162-16 including 2 bedrooms,2 baths & 1 kitchen, living room. | $90,000 | |
| Nov 3, 2022 | Completed final sign-off Nov 2022 | 1465 Carroll Av | comply with complaint 202297937 to legalize installed filters for existing type ii hood within (e) kitchen areaDetails
comply with complaint 202297937 to legalize installed filters for existing type ii hood within (e) kitchen area | $4,000 | |
| Oct 26, 2022 | Never finaled filed Oct 2022, never issued | 162 Raymond Av | reconfigure existing building rooms layout at ground floor. shared plans with pa# 202210265244.Details
reconfigure existing building rooms layout at ground floor. shared plans with pa# 202210265244. | $30,000 | |
| Oct 26, 2022 | Never finaled filed Oct 2022, never issued | 162 Raymond Av | to erect an adu building. 3-story, 1-unit, type vb.Details
to erect an adu building. 3-story, 1-unit, type vb. | $400,000 | |
| Oct 20, 2022 | Completed final sign-off Apr 2023 | 2442 29th Av | Randy's Construction | revision to approved pa#202206287262. replace (e) front windows with aluminium clad wood (same size and same location). replace (e) footing and relocate rear door at ground floor. revise rear retaining wall detail.Details
revision to approved pa#202206287262. replace (e) front windows with aluminium clad wood (same size and same location). replace (e) footing and relocate rear door at ground floor. revise rear retaining wall detail. | $6,000 |
| Oct 20, 2022 | Expired or cancelled expired Sep 2025 | 188 Collins St | Dwp Co. | revision to pa#202206297424. no change to front windows at 2nd & 3rd floors. remove washer/ dryer, laundery sink at ground floor. reconfigure bathroom layout and bar sink location at ground floor. add new electric fireplace at 2nd floor. change laundry rm to be study rm and relocate washery/ dryerDetails
revision to pa#202206297424. no change to front windows at 2nd & 3rd floors. remove washer/ dryer, laundery sink at ground floor. reconfigure bathroom layout and bar sink location at ground floor. add new electric fireplace at 2nd floor. change laundry rm to be study rm and relocate washery/ dryer | $1,000 |
| May 9, 2022 | Completed final sign-off Apr 2025 | 2924 Sacramento St | J C General Construction | remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yardDetails
remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yard | $30,000 |
| Feb 16, 2022 | Completed final sign-off Mar 2022 | 2329 24th Av | revision to 202101273447 to revise detail a on page a-2 and clarify dimension on page a-3Details
revision to 202101273447 to revise detail a on page a-2 and clarify dimension on page a-3 | ||
| Jan 5, 2022 | Completed final sign-off Jun 2022 | 1235 18th Av | unit #1: remodel (e) kitchen & bathroom at 2nd floor unit #1. convert living room area to second bedroom.Details
unit #1: remodel (e) kitchen & bathroom at 2nd floor unit #1. convert living room area to second bedroom. | $30,000 | |
| Oct 15, 2021 | Never finaled issued Oct 2021, no final | 1250 Jones St | Level 8 Construction Inc | apt 1801: install new stackup washer/elec dryer (ventless) into (e) closet. new laundry box.Details
apt 1801: install new stackup washer/elec dryer (ventless) into (e) closet. new laundry box. | $3,000 |
| Aug 19, 2021 | Expired or cancelled expired Apr 2026 | 410 Dewey Bl | change (e) office to be limited service restaurant and install new cooking equipment,kitchen hood exhaust system & construct new ada rest room.Details
change (e) office to be limited service restaurant and install new cooking equipment,kitchen hood exhaust system & construct new ada rest room. | $100,000 | |
| Jul 8, 2021 | Never finaled issued Jul 2021, no final | 132 Blake St | replace (e) floor slab and footing and posts at ground fl. add new insulation and gypbd to walls and ceiling at ground fl.Details
replace (e) floor slab and footing and posts at ground fl. add new insulation and gypbd to walls and ceiling at ground fl. | $20,000 | |
| Jun 15, 2021 | Completed final sign-off Feb 2023 | 595 41st Av | Hungto Co Incorporation, Samco Construction Inc | remodel (e) bathroom, kitchen & add 1 ned bathroom within (e) bedroom. remove (e) fire place at 2nd fl. replace (e) windows per plan. add 1 full bathroom, family room, & 2 bedrooms at ground fl. replace (e) posts & beams with new bearing wall.Details
remodel (e) bathroom, kitchen & add 1 ned bathroom within (e) bedroom. remove (e) fire place at 2nd fl. replace (e) windows per plan. add 1 full bathroom, family room, & 2 bedrooms at ground fl. replace (e) posts & beams with new bearing wall. | $80,000 |
| May 18, 2021 | Never finaled filed May 2021, never issued | 7 San Gabriel Av | construct 3-story horizontal rear addition w/ bed rooms, fam room & bath rooms. remove glass enclosures and revert front porch as approved under pa 201402289581. add 20% landscaping and 50% permeability on front setback. to comply w/ planning 2020-001105enfDetails
construct 3-story horizontal rear addition w/ bed rooms, fam room & bath rooms. remove glass enclosures and revert front porch as approved under pa 201402289581. add 20% landscaping and 50% permeability on front setback. to comply w/ planning 2020-001105enf | $100,000 | |
| Jan 27, 2021 | Never finaled issued Oct 2021, no final | 2329 24th Av | to comply with nov# 202051660. replace (e) rear deck & stair.Details
to comply with nov# 202051660. replace (e) rear deck & stair. | $10,000 | |
| Dec 29, 2020 | Expired or cancelled cancelled Jan 2026 | 2263 39th Av | remove (e) unpermitted rear porch. new 1-story rear addition including 2 bedrooms, 1 bathroom.add deck on roof. 1 new bathroom & media room to be constructed at g/f. remodel (e) kitchen & bathroom and add 1 new bathroom on 2/f.Details
remove (e) unpermitted rear porch. new 1-story rear addition including 2 bedrooms, 1 bathroom.add deck on roof. 1 new bathroom & media room to be constructed at g/f. remodel (e) kitchen & bathroom and add 1 new bathroom on 2/f. | $120,000 | |
| Dec 28, 2020 | Never finaled filed Dec 2020, never issued | 923 Pacific Av | convert (e) commercial store to be a new adu on g/f per oridinace 162-76 including 1 bedrooms, 1 office, 1 bathroom, 1 kitchen and change (e) front door and window. maher n/a.Details
convert (e) commercial store to be a new adu on g/f per oridinace 162-76 including 1 bedrooms, 1 office, 1 bathroom, 1 kitchen and change (e) front door and window. maher n/a. | $56,000 | |
| Dec 24, 2020 | Completed final sign-off Jun 2023 | 1846 31st Av | Zhuo Zhang Construction Inc, Samco Construction Inc | remodel (e) kitchen and 2 bathrooms at 2nd fl. add new rooms at g/f. replace (e) foundation with new. replace all sheetrock for (e) bldg. install new skylights & replace (e) windows. replace (e) deck with new wood deck to the rear of bldg.Details
remodel (e) kitchen and 2 bathrooms at 2nd fl. add new rooms at g/f. replace (e) foundation with new. replace all sheetrock for (e) bldg. install new skylights & replace (e) windows. replace (e) deck with new wood deck to the rear of bldg. | $120,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2022 | 558 35th Av | Jian Lou Construction Co. | remodel (e) kitchen, (e) bath, add 1 new bath & toilet room. reconfigure (e) rooms @ 2nd floor per plan. replace (e) gypsum board & infill (e) lightwell 2nd floor to ground floor. 2 new bedrooms, 2 bathrooms, and media room to be constructed at ground floor. replace partial footing & concrete slab.Details
remodel (e) kitchen, (e) bath, add 1 new bath & toilet room. reconfigure (e) rooms @ 2nd floor per plan. replace (e) gypsum board & infill (e) lightwell 2nd floor to ground floor. 2 new bedrooms, 2 bathrooms, and media room to be constructed at ground floor. replace partial footing & concrete slab. | $100,000 |
| Sep 18, 2020 | Expired or cancelled withdrawn Jun 2021 | 2422 23rd Av | new adu to be added at ground floor per ordinance 162-16.2. replace (e) partial foundation,slab & beam per plan. construct 2 story of rear stair.Details
new adu to be added at ground floor per ordinance 162-16.2. replace (e) partial foundation,slab & beam per plan. construct 2 story of rear stair. | $100,000 | |
| Feb 5, 2020 | Completed final sign-off Jun 2021 | 1420 Market St | Golden Brick Construction Inc | refer to 201911268301: to install downdraft cooking grill & rated grease exhaust ductwork within (e) restaurant.Details
refer to 201911268301: to install downdraft cooking grill & rated grease exhaust ductwork within (e) restaurant. | $18,000 |
| Feb 5, 2020 | Completed final sign-off Oct 2021 | 222 Vernon St | revision to approved app#201911278382 to retrofit partial extg foundation and floor slab at ground floor per plan.Details
revision to approved app#201911278382 to retrofit partial extg foundation and floor slab at ground floor per plan. | $10,000 | |
| Nov 26, 2019 | Completed final sign-off Jun 2021 | 1420 Market St | Primo Management Studio | ti install new lighting fixtures. remove (e) wet bar and rebuild new prep station with new countertop & equipmentsDetails
ti install new lighting fixtures. remove (e) wet bar and rebuild new prep station with new countertop & equipments | $7,000 |
| Nov 12, 2019 | Never finaled filed Nov 2019, never issued | 3591 20th St | change (e) commercial store to limited restaurant. including new lightings, fixtures, & hvac system installation.Details
change (e) commercial store to limited restaurant. including new lightings, fixtures, & hvac system installation. | $60,000 | |
| Oct 1, 2019 | Completed final sign-off Dec 2020 | 119 Stillings Av | Bay County Construction Inc | revision to pa 2016-0104-6318 to reconfigure room layout @ 2nd floor & replace (e) interior stair; replace (e) front windows with new. match (e) like kind & size (in compliance with nov 201942772)Details
revision to pa 2016-0104-6318 to reconfigure room layout @ 2nd floor & replace (e) interior stair; replace (e) front windows with new. match (e) like kind & size (in compliance with nov 201942772) | $30,000 |
| Jul 5, 2019 | Completed final sign-off Nov 2019 | 1099 Mississippi St | Odysseus Builders | install new bathroom at ground fl. sprinkler under sep permit if req'd.Details
install new bathroom at ground fl. sprinkler under sep permit if req'd. | $12,000 |
| May 22, 2019 | Completed final sign-off Dec 2019 | 110 Hearst Av | Bingshuo Jacky Tang | in compliance of n.o.v 201951131 to legalize (e) retaining wall within rear yard area per plan.Details
in compliance of n.o.v 201951131 to legalize (e) retaining wall within rear yard area per plan. | $8,000 |
| Apr 26, 2019 | Expired or cancelled expired Apr 2021 | 279 Sadowa St | revision to pa 2018-0803-6452 to install 2 wood beam to support (e) roof & replace (e0 6 x 10 beam with new psl beam @ garage ceilingDetails
revision to pa 2018-0803-6452 to install 2 wood beam to support (e) roof & replace (e0 6 x 10 beam with new psl beam @ garage ceiling | $5,000 | |
| Nov 15, 2018 | Completed final sign-off Apr 2019 | 88 King St | remodel (e) bathroom & relocate (e) washer/dryer to (e) closet area at 2nd fl. install new door to (e) bathroom at ground fl.Details
remodel (e) bathroom & relocate (e) washer/dryer to (e) closet area at 2nd fl. install new door to (e) bathroom at ground fl. | $20,000 | |
| Oct 18, 2018 | Completed final sign-off Mar 2019 | 75 Ofarrell St | Transworld Construction | tenant improvement to remodel (e) restaurant to install new sink, kitchen sink, refrigerators, & new counters.Details
tenant improvement to remodel (e) restaurant to install new sink, kitchen sink, refrigerators, & new counters. | $10,000 |
| Oct 16, 2018 | Expired or cancelled withdrawn Mar 2019 | 442 10th Av | K & J Construction Co. | add (n) unit @ basement w/ 2 bedrooms and 1 bath per ord# 162-16.Details
add (n) unit @ basement w/ 2 bedrooms and 1 bath per ord# 162-16. | $5,000 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 601 Grant Av | 328 Construction | revision to approved pa #201809180680. to eliminate smoke duct detector per cmc section 608.1, exception (2).Details
revision to approved pa #201809180680. to eliminate smoke duct detector per cmc section 608.1, exception (2). | |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 601 Grant Av | 328 Construction | mech and elec ti - replace (e) hvac system with new heat pumo, fan coil & ductwork for dining area only. install new lighting per plan for kitchen and dining areas. t-24 forms. existing hood. 1 new duct detector. ref #201804186647. fire under separate permit(s).Details
mech and elec ti - replace (e) hvac system with new heat pumo, fan coil & ductwork for dining area only. install new lighting per plan for kitchen and dining areas. t-24 forms. existing hood. 1 new duct detector. ref #201804186647. fire under separate permit(s). | $40,000 |
| Aug 24, 2018 | Completed final sign-off May 2019 | 3177 16th St | interior remodel new kitchen hood, roof top exhaust fan and makeup fanDetails
interior remodel new kitchen hood, roof top exhaust fan and makeup fan | $25,000 | |
| Jul 20, 2018 | Completed final sign-off Feb 2025 | 1644 Taraval St | Elux Construction Inc | erect 3-story, type 5b, 2 dwelling units over commercial building. sprinkler and sprinkler monitoring under separate permits.Details
erect 3-story, type 5b, 2 dwelling units over commercial building. sprinkler and sprinkler monitoring under separate permits. | $400,000 |
| Jul 20, 2018 | Completed final sign-off Jul 2023 | 1644 Taraval St | Synergy Enterprises Inc., Elux Construction Inc | demolish 1-story, office building.Details
demolish 1-story, office building. | $15,000 |
| May 9, 2018 | Expired or cancelled cancelled Jan 2026 | 1909 Ellis St | replace (e) beam with new steel beam & partial foundation, slab at ground fl.Details
replace (e) beam with new steel beam & partial foundation, slab at ground fl. | $26,000 | |
| Sep 15, 2017 | Never finaled filed Sep 2017, never issued | 1455 Sacramento St | structurally retrofit for (4) story wood frame building per san francisco wood-frame seismic retrofit program per 2016 cebc appendix a-4 (in compliance of nov #201703161.Details
structurally retrofit for (4) story wood frame building per san francisco wood-frame seismic retrofit program per 2016 cebc appendix a-4 (in compliance of nov #201703161. | $60,000 | |
| Sep 15, 2017 | Completed final sign-off Apr 2026 | 1327 Grant Av | Zhongwei Construction, Q & Qq Construction Inc | residential: structurally retrofit (e) (3) story wood frame building per san francisco wood-frame seismic retrofit program (2016 cebc appendix a-4) (sfe bc 505e.6.1)Details
residential: structurally retrofit (e) (3) story wood frame building per san francisco wood-frame seismic retrofit program (2016 cebc appendix a-4) (sfe bc 505e.6.1) | $200,000 |
| Sep 8, 2017 | Completed final sign-off Feb 2020 | 1101 Phelps St | mandatory seismic structurally retrofit for existing 3 story wood frame building, per san francisco wood-frame seismic retrofit program 2016 cebc appendix a-4.Details
mandatory seismic structurally retrofit for existing 3 story wood frame building, per san francisco wood-frame seismic retrofit program 2016 cebc appendix a-4. | $50,000 | |
| Jun 16, 2017 | Expired or cancelled cancelled Aug 2023 | 966 Ingerson Av | 1 story vertical addition over (e) 2 story building including 1 new bedroom with 1 full bath.Details
1 story vertical addition over (e) 2 story building including 1 new bedroom with 1 full bath. | $80,000 | |
| May 12, 2017 | Completed final sign-off Jun 2017 | 1 Hallidie Pz | unit #303 & #304 - remove (e) glass panel within corridor area & infill opening. to comply with nov# 201570982Details
unit #303 & #304 - remove (e) glass panel within corridor area & infill opening. to comply with nov# 201570982 | $1,000 | |
| Apr 6, 2017 | Completed final sign-off Feb 2020 | 1101 Phelps St | add 4 new residential units at ground floor to (e) 5 units house per plan. enclose new bedrooms beneath (e) rooms at ground floor.Details
add 4 new residential units at ground floor to (e) 5 units house per plan. enclose new bedrooms beneath (e) rooms at ground floor. | $100,000 | |
| Mar 17, 2017 | Expired or cancelled withdrawn Jul 2018 | 248 03rd Av | to comply with nov 201759422: to legalize guest room and bathroom at ground floor. replace partial (e) slab & foundation per plan.Details
to comply with nov 201759422: to legalize guest room and bathroom at ground floor. replace partial (e) slab & foundation per plan. | $25,000 | |
| Nov 4, 2016 | Completed final sign-off Jun 2017 | 2328 32nd Av | S & K Construction | remodel (e) kitchen and add 1 new bathroom at 2nd. add 2 full bathrooms, 1 laundry rm, bedroom, family rm, social & storage rm at ground flr. infill (e) lightwell at 2nd flr & replace (e) windows per planDetails
remodel (e) kitchen and add 1 new bathroom at 2nd. add 2 full bathrooms, 1 laundry rm, bedroom, family rm, social & storage rm at ground flr. infill (e) lightwell at 2nd flr & replace (e) windows per plan | $90,000 |
| Nov 1, 2016 | Expired or cancelled cancelled Jan 2026 | 1230 Moraga St | revision to pa#201510220594 to reuse footing detail to the west side of the (e) bldg. at g/f.Details
revision to pa#201510220594 to reuse footing detail to the west side of the (e) bldg. at g/f. | $1,000 | |
| Oct 19, 2016 | Completed final sign-off Apr 2017 | 2729 35th Av | S & F Construction | revision to pa #201509146893 - relocate closet location & reconfigure bathroom at ground floor. add new windows to the new rear additon & change door location & add door between (n) sunroom & (e) bedroom at 2nd floor.Details
revision to pa #201509146893 - relocate closet location & reconfigure bathroom at ground floor. add new windows to the new rear additon & change door location & add door between (n) sunroom & (e) bedroom at 2nd floor. | $2,000 |
| Sep 30, 2016 | Completed final sign-off May 2017 | 19 Venus St | Ahumada General Contractor | horizontal: rear deck w/ stair to be constructed at 2/fl.Details
horizontal: rear deck w/ stair to be constructed at 2/fl. | $5,000 |
| Jul 12, 2016 | Completed final sign-off Oct 2016 | 811 Alvarado St | Ecowave Inc | intall two electric heaters. install (n) r-15 wall insulation. replace in-kind window replacement non-street facing. replace all drywall where removed to insulate with 5/8in type-x drywall.Details
intall two electric heaters. install (n) r-15 wall insulation. replace in-kind window replacement non-street facing. replace all drywall where removed to insulate with 5/8in type-x drywall. | $2,000 |
| Jul 8, 2016 | Completed final sign-off Aug 2017 | 1343 Palou Av | Parkhill Paint Decor Inc, Bay C T Construction Inc. | remodel e bath, ktichen at 2nd fl, remodel e bath and add 1 new bath, bedroom and study rm.Details
remodel e bath, ktichen at 2nd fl, remodel e bath and add 1 new bath, bedroom and study rm. | $50,000 |
| Jul 8, 2016 | Expired or cancelled expired Sep 2023 | 623 Clement St | Mark Scott Construction Inc | repair e restaurant due to fire damage including : replace all damaged floor/ceiling/fafters and studs. match e kind and size, replace all damaged equipment, kitchen exhause hood systems and associated ductworkDetails
repair e restaurant due to fire damage including : replace all damaged floor/ceiling/fafters and studs. match e kind and size, replace all damaged equipment, kitchen exhause hood systems and associated ductwork | $140,000 |
| Jun 9, 2016 | Never finaled issued Jan 2019, no final | 121 Leland Av | E R M A Construction Company | 2 story rear addition including 2 bedrooms, 1 bath, 1 family & laundry @ 2nd & 3rd floor. add 1 new computer , 1 office & 1 bathroom within (e) bldg @ ground floor.Details
2 story rear addition including 2 bedrooms, 1 bath, 1 family & laundry @ 2nd & 3rd floor. add 1 new computer , 1 office & 1 bathroom within (e) bldg @ ground floor. | $100,000 |
| Jun 2, 2016 | Never finaled issued Jun 2016, no final | 120 Church St | install new furnace & duct work & install new lighting fixtures at ground floor for retail space. ref pa #201510291105.Details
install new furnace & duct work & install new lighting fixtures at ground floor for retail space. ref pa #201510291105. | $20,000 | |
| Oct 16, 2015 | Completed final sign-off Apr 2016 | 2840 San Bruno Av | Lei's Construction Company | remodel e kitchen and change e dining to be bedroom in unit #1 and #3 at 2nd fl per planDetails
remodel e kitchen and change e dining to be bedroom in unit #1 and #3 at 2nd fl per plan | $20,000 |
| Jul 27, 2015 | Completed final sign-off Oct 2015 | 134 Vienna St | Steven Wong Builders | remodel (e) kitchen at 1/f, remove (e) partition wall between (e) kitchen & bedroom to make new family room at 1/fDetails
remodel (e) kitchen at 1/f, remove (e) partition wall between (e) kitchen & bedroom to make new family room at 1/f | $20,000 |
| Jul 3, 2015 | Expired or cancelled cancelled Aug 2025 | 3734 Judah St | adu, to comply w/ complaint #201519891 work on g/f, modified walls per plan, remodel bathroom, new sheetrock, replace 2 windows in rear, new structural beam post, new footings, change door on 2/f, add one dwelling unit at ground floor.Details
adu, to comply w/ complaint #201519891 work on g/f, modified walls per plan, remodel bathroom, new sheetrock, replace 2 windows in rear, new structural beam post, new footings, change door on 2/f, add one dwelling unit at ground floor. | $40,000 | |
| Apr 17, 2015 | Completed final sign-off Aug 2017 | 1 Hallidie Pz | R 3 Builders Inc. | 5th & 6th flr: ti - 6th flr - reconfigure (e) office area. new lighting & air outlet relocation. 5th flr -reconfigure (e) office area - new ada restroom with shower. new ligting & hvac system...building exempt from sprink rqmnt, filed verify. fa separate permitDetails
5th & 6th flr: ti - 6th flr - reconfigure (e) office area. new lighting & air outlet relocation. 5th flr -reconfigure (e) office area - new ada restroom with shower. new ligting & hvac system...building exempt from sprink rqmnt, filed verify. fa separate permit | $350,000 |
| Mar 27, 2015 | Completed final sign-off Oct 2015 | 615 33rd Av | revision to 201312174427 - change 1/2 bath to full bath @ 2nd floor, change slab on grade to raised floor at ground floor for new addition.Details
revision to 201312174427 - change 1/2 bath to full bath @ 2nd floor, change slab on grade to raised floor at ground floor for new addition. | $8,000 | |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 951 Ofarrell St | unit #14,22,24,34- revision to 201502259253: remove e non load bearing wall between e. kitchen and studio. all fire rated assemblies to be maintained.Details
unit #14,22,24,34- revision to 201502259253: remove e non load bearing wall between e. kitchen and studio. all fire rated assemblies to be maintained. | $1,000 | |
| Mar 16, 2015 | Completed final sign-off Sep 2018 | 104 Dorado Tr | Samco Construction Inc | in compliance of complaint #201525921, 201525931, 201525932. legalize (e) storage and laundry room and retaining wall to the rear of (e) building at ground floor per planDetails
in compliance of complaint #201525921, 201525931, 201525932. legalize (e) storage and laundry room and retaining wall to the rear of (e) building at ground floor per plan | $20,000 |
| Feb 25, 2015 | Completed final sign-off Oct 2015 | 951 Ofarrell St | comply w/nov #201492503 & 201527911 - fire damage repair for units #14,22,24,34 & 44 including bathrooms & kitchen remodel, replace broken windows.Details
comply w/nov #201492503 & 201527911 - fire damage repair for units #14,22,24,34 & 44 including bathrooms & kitchen remodel, replace broken windows. | $40,000 | |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 2667 24th Av | new bath room & family room to be constructed at ground floor per plan & reconfigure (e) bedroom, install new wood beam at ground floor.Details
new bath room & family room to be constructed at ground floor per plan & reconfigure (e) bedroom, install new wood beam at ground floor. | $40,000 |