Bingshuo Jacky Tang
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to May 2019
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2019 | Completed final sign-off Dec 2019 | 110 Hearst Av | in compliance of n.o.v 201951131 to legalize (e) retaining wall within rear yard area per plan.Details
in compliance of n.o.v 201951131 to legalize (e) retaining wall within rear yard area per plan. | $8,000 |
| Jan 18, 2019 | Completed final sign-off Jun 2019 | 2726 Clement St | add one new bath rm, bedroom, & media rm at ground fl.Details
add one new bath rm, bedroom, & media rm at ground fl. | $50,000 |
| Jan 4, 2019 | Completed final sign-off Dec 2019 | 110 Hearst Av | add 2 bedrooms, an office and 3 full bathrooms on the 1st floor. replace foundation lower 1st floor grade by 12" maximum. replace furnace. relocate washer and dryer and water heater.Details
add 2 bedrooms, an office and 3 full bathrooms on the 1st floor. replace foundation lower 1st floor grade by 12" maximum. replace furnace. relocate washer and dryer and water heater. | $80,000 |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 2728 Clement St | street spaceDetails
street space | |
| Oct 5, 2018 | Completed final sign-off Jun 2019 | 2728 Clement St | to comply with nov #201762031 and upgrade electrical panel to 200amp. remodel kitchen & half bath. take off sheetrock on 2nd floor for 3 bedrooms & living room to install insulation due to no prior insulation. install sheetrock after insulation on 2nd fl 5/8" type "x' gyp bd.Details
to comply with nov #201762031 and upgrade electrical panel to 200amp. remodel kitchen & half bath. take off sheetrock on 2nd floor for 3 bedrooms & living room to install insulation due to no prior insulation. install sheetrock after insulation on 2nd fl 5/8" type "x' gyp bd. | $85,000 |
| May 29, 2018 | Never finaled issued Jun 2018, no final | 3015 San Bruno Av | rev to pa# 201607283597; revision for sheet e-1, electrical permitDetails
rev to pa# 201607283597; revision for sheet e-1, electrical permit | $6,000 |
| Jul 21, 2017 | Completed final sign-off Feb 2018 | 1317 20th Av | convert (e) massage store into a pel learning center, convert (e) shower room #1, #2 & #3 into one single classroom, convert (e) living room & employee room into one single classroom, (e) hvac system remain, no additional work required. n/a ordinance #155-13Details
convert (e) massage store into a pel learning center, convert (e) shower room #1, #2 & #3 into one single classroom, convert (e) living room & employee room into one single classroom, (e) hvac system remain, no additional work required. n/a ordinance #155-13 | $20,000 |
| May 4, 2017 | Completed final sign-off Jun 2017 | 2426 43rd Av | replace existing stucco with stucco, replace two windows on front facade with fiberglass double -pane windows. no change to window openings.Details
replace existing stucco with stucco, replace two windows on front facade with fiberglass double -pane windows. no change to window openings. | $1,000 |
| Jul 28, 2016 | Completed final sign-off Aug 2018 | 3015 San Bruno Av | g/f -tenant improvements for convert (e) office/commercial space to a medical cannabis dispensary (mcd). update accessibility/restroom. new service counter, new partition walls & doors. new restroom. maher n/aDetails
g/f -tenant improvements for convert (e) office/commercial space to a medical cannabis dispensary (mcd). update accessibility/restroom. new service counter, new partition walls & doors. new restroom. maher n/a | $60,000 |
| Mar 23, 2015 | Completed final sign-off Apr 2015 | 455 29th St | work for back yard stucco, not visible from streetDetails
work for back yard stucco, not visible from street | $9,000 |
| Jun 16, 2014 | Completed final sign-off Apr 2015 | 418 Victoria St | construct one bedrm, family rm, storage rm and full bath room at ground floor, upgrade partial foundationDetails
construct one bedrm, family rm, storage rm and full bath room at ground floor, upgrade partial foundation | $34,000 |