Back to bathroom remodel contractors
Bingshuo Jacky Tang
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to May 2019
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 6 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2019 | Completed final sign-off Jun 2019 | 2726 Clement St | add one new bath rm, bedroom, & media rm at ground fl.Details
add one new bath rm, bedroom, & media rm at ground fl. | $50,000 |
| Jan 4, 2019 | Completed final sign-off Dec 2019 | 110 Hearst Av | add 2 bedrooms, an office and 3 full bathrooms on the 1st floor. replace foundation lower 1st floor grade by 12" maximum. replace furnace. relocate washer and dryer and water heater.Details
add 2 bedrooms, an office and 3 full bathrooms on the 1st floor. replace foundation lower 1st floor grade by 12" maximum. replace furnace. relocate washer and dryer and water heater. | $80,000 |
| Oct 5, 2018 | Completed final sign-off Jun 2019 | 2728 Clement St | to comply with nov #201762031 and upgrade electrical panel to 200amp. remodel kitchen & half bath. take off sheetrock on 2nd floor for 3 bedrooms & living room to install insulation due to no prior insulation. install sheetrock after insulation on 2nd fl 5/8" type "x' gyp bd.Details
to comply with nov #201762031 and upgrade electrical panel to 200amp. remodel kitchen & half bath. take off sheetrock on 2nd floor for 3 bedrooms & living room to install insulation due to no prior insulation. install sheetrock after insulation on 2nd fl 5/8" type "x' gyp bd. | $85,000 |
| Jun 16, 2014 | Completed final sign-off Apr 2015 | 418 Victoria St | construct one bedrm, family rm, storage rm and full bath room at ground floor, upgrade partial foundationDetails
construct one bedrm, family rm, storage rm and full bath room at ground floor, upgrade partial foundation | $34,000 |