F Christopher Ford
- Listed as
- architect, engineer
- Firm
- Brown Reynolds Watford Arch
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Aug 2026
30 permits since 2000 (architect on 29 permits, engineer on 1 permit): 22 completed, 4 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 301 Clay St | Silverado Contractors Inc | 29th floor: selective demo of non load baearing partitions, removal of power+ data outlets,lighting, switches, associated devices. removal of suspended ceiling tiles, grid +related ceiling mounted devices. removal of (e) floor covering down to the substrate. all work is interior, non structural.Details
29th floor: selective demo of non load baearing partitions, removal of power+ data outlets,lighting, switches, associated devices. removal of suspended ceiling tiles, grid +related ceiling mounted devices. removal of (e) floor covering down to the substrate. all work is interior, non structural. | $300,000 |
| Mar 11, 2026 | In progress issued Aug 2026 | 2 Embarcadero Center | Silverado Contractors Inc | 11/f: selective demolition of non-load-bearing partitions. removal of power and data outlets, lighting, switches, and associated electrical devices including removal of suspended ceiling tiles, grid, and related ceiling mounted devices, except smoke control devices as well as removal of (e)Details
11/f: selective demolition of non-load-bearing partitions. removal of power and data outlets, lighting, switches, and associated electrical devices including removal of suspended ceiling tiles, grid, and related ceiling mounted devices, except smoke control devices as well as removal of (e) | $300,000 |
| Dec 22, 2025 | In progress issued May 2026 | 1 Embarcadero Center | Source Planning And Construction Inc | 11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain.Details
11/f: interior improvements to elevator lobby, hallways, and restrooms on the 11th floor. including paint, lighting, toilet fixtures, partitions, and accessories, signage, carpet flooring, and ceramic tile. all walls to remain. | $400,000 |
| Jun 10, 2025 | In progress issued Jul 2025 | 4 Embarcadero Center | Gci, Inc | 23rd floor: improvement of elevator lobbies, hallways, and restrooms. all walls to remain, ada/finish and fixture upgrades onlyDetails
23rd floor: improvement of elevator lobbies, hallways, and restrooms. all walls to remain, ada/finish and fixture upgrades only | $100,000 |
| Feb 13, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | 7/f: improvement in the elevator lobbies, hallways, and restrooms on the 7th floor. all walls to remain. renovation to finishes and fixtures.Details
7/f: improvement in the elevator lobbies, hallways, and restrooms on the 7th floor. all walls to remain. renovation to finishes and fixtures. | $100,000 |
| Feb 13, 2024 | Completed final sign-off Oct 2024 | 4 Embarcadero Center | M C S Construction Services | 36/f: improvements to tbe elevator lobby, hallways, and restrooms on the 36th floor. all walls to remain. renovation to finishes and fixtures.Details
36/f: improvements to tbe elevator lobby, hallways, and restrooms on the 36th floor. all walls to remain. renovation to finishes and fixtures. | $100,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 Vicente St | Dome Construction Corp | safety retrofit of open interior stairways at halleck cottage in the form of aluminum storefront with fixed tempered glass panelsDetails
safety retrofit of open interior stairways at halleck cottage in the form of aluminum storefront with fixed tempered glass panels | $50,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 Vicente St | Dome Construction Corp | safety retrofit of open interior stairways at williams cottage in the form of aluminum storefront with fixed tempered glass panelsDetails
safety retrofit of open interior stairways at williams cottage in the form of aluminum storefront with fixed tempered glass panels | $44,000 |
| Sep 29, 2023 | Completed final sign-off Jun 2024 | 1801 Vicente St | Dome Construction Corp | safety retrofit of open interior stairways at stow cottage in the form of aluminum storefront with fixed tempered glass panelsDetails
safety retrofit of open interior stairways at stow cottage in the form of aluminum storefront with fixed tempered glass panels | $50,000 |
| May 14, 2018 | Completed final sign-off Oct 2019 | 825 Jones St | revision to 201704285129. revision is a change of configuration of new stair with the moving of a door on the lower flDetails
revision to 201704285129. revision is a change of configuration of new stair with the moving of a door on the lower fl | $5,000 | |
| Apr 28, 2017 | Completed final sign-off Oct 2019 | 825 Jones St | renovate existing unit on ground fl to add stairway into basement, converting studio into 2 bedroom unit. work will include demo of walls, slab on grade, new fire rated doors and walls, new plumbing and electrical fixturesDetails
renovate existing unit on ground fl to add stairway into basement, converting studio into 2 bedroom unit. work will include demo of walls, slab on grade, new fire rated doors and walls, new plumbing and electrical fixtures | $150,000 | |
| Mar 29, 2017 | Completed final sign-off Dec 2018 | 5048 03rd St | Mark Scott Construction Inc | selective demo, new front entry, comprehensive interior improvements, thermal insulation and other measures to comply with title 24. convert back to office occupancy. ** maher: n/a **Details
selective demo, new front entry, comprehensive interior improvements, thermal insulation and other measures to comply with title 24. convert back to office occupancy. ** maher: n/a ** | $400,000 |
| Feb 19, 2016 | Completed final sign-off Apr 2016 | 1875 California St | revision to pa 2014-1120-2079, replace skylight with flat roofDetails
revision to pa 2014-1120-2079, replace skylight with flat roof | $750 | |
| Dec 4, 2015 | Completed final sign-off Mar 2018 | 744 Oak St | change of use. add unit per ord #30-15. this project proposes the conversion of 1 existint office and storage area into an apartment. seismic soft story permit #2015-09-24-8016.Details
change of use. add unit per ord #30-15. this project proposes the conversion of 1 existint office and storage area into an apartment. seismic soft story permit #2015-09-24-8016. | $20,000 | |
| Nov 6, 2015 | Completed final sign-off Feb 2018 | 3250 Laguna St | add unit per ordinance# 30-15. spliting of apartment unit# 302 into 2units. creating (e) penthouse as a separate unit. seismic retrofit permit under p# 2013/08/12/4047.Details
add unit per ordinance# 30-15. spliting of apartment unit# 302 into 2units. creating (e) penthouse as a separate unit. seismic retrofit permit under p# 2013/08/12/4047. | $25,000 | |
| Aug 13, 2015 | Completed final sign-off Oct 2015 | 3250 Laguna St | replace exterior walls due to dryrot, replace part of fire escape, add roof over stairwell, remove dryrot walls and roof surrounding trash enclosureDetails
replace exterior walls due to dryrot, replace part of fire escape, add roof over stairwell, remove dryrot walls and roof surrounding trash enclosure | $20,000 | |
| May 1, 2015 | Completed final sign-off Feb 2017 | 1875 California St | revision to 2014 1120 2079 (replace stair): to restore original full toilet room and entrance door at unit #6. maher naDetails
revision to 2014 1120 2079 (replace stair): to restore original full toilet room and entrance door at unit #6. maher na | $4,000 | |
| Jan 28, 2015 | Completed final sign-off Oct 2015 | 1875 California St | unit #7: repair/replace existing 3rd floor rooftop deck; maher n/aDetails
unit #7: repair/replace existing 3rd floor rooftop deck; maher n/a | $6,000 | |
| Jan 10, 2014 | Completed final sign-off Dec 2014 | 4000 19th St | existing apt unit with size of 1000 sq. ft. alteration/expansion into the (e) storage basement space. addition of interior stairs, 2 bedrms, 1 bathrm in total of 600 sf. structural reinforcement of (e) ground floor. comply with sf green building code table 4.Details
existing apt unit with size of 1000 sq. ft. alteration/expansion into the (e) storage basement space. addition of interior stairs, 2 bedrms, 1 bathrm in total of 600 sf. structural reinforcement of (e) ground floor. comply with sf green building code table 4. | $40,000 | |
| Apr 19, 2012 | Completed final sign-off Feb 2014 | 2902 Washington St | replacement in-kind of existing rear exit stair with structural upgrades.Details
replacement in-kind of existing rear exit stair with structural upgrades. | $15,000 | |
| May 3, 2011 | Completed final sign-off Oct 2011 | 4000 19th St | exterior renovation of exisitng building street side elevatiions siding and detailsDetails
exterior renovation of exisitng building street side elevatiions siding and details | $25,000 | |
| Sep 2, 2010 | Completed final sign-off Nov 2010 | 955 Pine St | add exterior stair to existing exterior deck at rear pf propertyDetails
add exterior stair to existing exterior deck at rear pf property | $1,400 | |
| Jun 18, 2008 | Completed final sign-off Apr 2009 | 525 23rd Av | revision to pa# 2006-1113-7565 to mve closet wall and add windowDetails
revision to pa# 2006-1113-7565 to mve closet wall and add window | $1,500 | |
| Oct 11, 2007 | Completed final sign-off Nov 2007 | 2728 Hyde St | removal of 33 lineal feet of non-bearing, non rated interior wall at convenience stair on 2nd floor.Details
removal of 33 lineal feet of non-bearing, non rated interior wall at convenience stair on 2nd floor. | $5,000 | |
| Nov 13, 2006 | Expired or cancelled expired Apr 2009 | 525 23rd Av | revised kitchen layout, added back door off bedroom, added window in attic , added shower to extg. bathrm, revision to application #200411058619Details
revised kitchen layout, added back door off bedroom, added window in attic , added shower to extg. bathrm, revision to application #200411058619 | $2,500 | |
| Nov 29, 2005 | Completed final sign-off Nov 2006 | 4 Embarcadero Center | Field Construction Inc. | interior improvements within a portion of (e) 1/f envelope of bldg. work includes 812 sf of interior improvement & 406 sf of exterior improvement.restroom facilities are already in place as part of embarcadero center.alterations to interior space are to be limited to removal of (e)interior walls &Details
interior improvements within a portion of (e) 1/f envelope of bldg. work includes 812 sf of interior improvement & 406 sf of exterior improvement.restroom facilities are already in place as part of embarcadero center.alterations to interior space are to be limited to removal of (e)interior walls & | $170,000 |
| Jul 14, 2005 | Expired or cancelled expired Oct 2007 | 2904 Washington St | project includes: demo & replacement of some footings & a portion of conc. slab in basement,Details
project includes: demo & replacement of some footings & a portion of conc. slab in basement, | $150,000 | |
| May 17, 2005 | Expired or cancelled expired Apr 2009 | 525 23rd Av | to comply with n.o.v. #200556836 to remove and replace south footingDetails
to comply with n.o.v. #200556836 to remove and replace south footing | $10,500 | |
| Nov 5, 2004 | Expired or cancelled expired Apr 2009 | 525 23rd Av | interior improvements within (e) shell of house include: a new powder room (toilet & sink), new staiDetails
interior improvements within (e) shell of house include: a new powder room (toilet & sink), new stai | $40,000 | |
| Jun 18, 2004 | Completed final sign-off Apr 2005 | 851 Post St | correct the relord and restore legal use of bldg to twenty three units. cfc 399417 issued 7/21/80.Details
correct the relord and restore legal use of bldg to twenty three units. cfc 399417 issued 7/21/80. |