Byron Kwong
- License
- C33768
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Des Architects/Engineers
- Based in
- Redwood City
- On San Francisco permits
- Feb 2021 to Sep 2021
5 permits since 2000 (architect on 5 permits): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (3), Skyline Construction, Source Planning And Construction Inc
- Architects
- Marc Pfenninger, Teresa Emery
- Engineers
- Mozart Faizi, Robert Pekelnicky
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 5
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2021 | Completed final sign-off Mar 2023 | 188 The Embarcadero | Plant Construction Co, Lp | g/f: remodel of 2 (e) all gender restrooms and 1 (e) mothers room. maher n/a.Details
g/f: remodel of 2 (e) all gender restrooms and 1 (e) mothers room. maher n/a. | $25,000 |
| Jul 21, 2021 | Completed final sign-off Dec 2022 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary structural strengthening 4th level of e 8 story concrete office bldg with basement parking garage. structural improvement include install fiberglass reinforced polymer frp spandrel beam and column wraps. 4th level will be brought into accessibility compliance the balance of the scope isDetails
voluntary structural strengthening 4th level of e 8 story concrete office bldg with basement parking garage. structural improvement include install fiberglass reinforced polymer frp spandrel beam and column wraps. 4th level will be brought into accessibility compliance the balance of the scope is | $250,000 |
| May 21, 2021 | Completed final sign-off May 2023 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)columnDetails
voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column | $6,000,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2021 | 2 Harrison St | Source Planning And Construction Inc | 4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maherDetails
4th floor: renovation of an (e) coffee bar and storage room, permit includes electrical and plumbing n/a maher | $100,000 |
| Feb 5, 2021 | Completed final sign-off May 2022 | 121 Spear St | Skyline Construction | levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls.Details
levels 3,5, & 6: the renovation of 12 exiting men's and women's restrooms with multi-stalls. | $700,000 |