Federico Engel
- Listed as
- architect, authorized agent-others
- Firm
- Engel Architects
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to Oct 2026
45 permits since 2000 (architect on 45 permits, authorized agent-others on 1 permit): 21 completed, 9 in progress, 8 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1960 Broadway | 10 and 11/fl- insstall of ac, 5 in ceiling fan coil units, 1 exterior condenserDetails
10 and 11/fl- insstall of ac, 5 in ceiling fan coil units, 1 exterior condenser | $15,000 | |
| Mar 24, 2026 | In progress issued Mar 2026 | 1 Steuart Ln | Baxter Construction | unit 1401: - revision to bpa: 202508183260. remove 2 (e) walls in bedroom, 3 closets, build 2 new walls for longer closet, reframe walls in living room for mechanical art lift. new millwork for closet interiors.Details
unit 1401: - revision to bpa: 202508183260. remove 2 (e) walls in bedroom, 3 closets, build 2 new walls for longer closet, reframe walls in living room for mechanical art lift. new millwork for closet interiors. | |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 1 Steuart Ln | Baxter Construction | unit 1402: revision to bpa: 202508183262 - demo and re-frame 3 non- load bearing walls to fit new cabinetry, new closet interiors for 4 closets. (plumbing safe off for laundry room)Details
unit 1402: revision to bpa: 202508183262 - demo and re-frame 3 non- load bearing walls to fit new cabinetry, new closet interiors for 4 closets. (plumbing safe off for laundry room) | |
| Jan 26, 2026 | In progress filed Jan 2026, not yet issued | 2990 Broadway | Upscale Construction Inc. | extensive interior renovation 1st 2nd and 3rd fl. basement to have minor upgrade pertaining to (n) elevator, replace (e) windows and add (n) windows exterior and interior finishes to be replacedDetails
extensive interior renovation 1st 2nd and 3rd fl. basement to have minor upgrade pertaining to (n) elevator, replace (e) windows and add (n) windows exterior and interior finishes to be replaced | $2,000,000 |
| Oct 16, 2025 | In progress issued Dec 2025 | 9 25th Ave North Av | Ggd Inc. | new construction of adu: a 2-story type-v with fire sprinklersDetails
new construction of adu: a 2-story type-v with fire sprinklers | $150,000 |
| Sep 2, 2025 | In progress issued Sep 2025 | 9 25th North Av | Ggd Inc. | replace (e) pool w/(n)_ pool and hardscaping.Details
replace (e) pool w/(n)_ pool and hardscaping. | $45,000 |
| Jan 2, 2025 | In progress issued Jan 2025 | 9 25th North Av | Ggd Inc. | (n) outdoor shower and (n) fixed fire rated window @ 3rd floor west facadeDetails
(n) outdoor shower and (n) fixed fire rated window @ 3rd floor west facade | $13,000 |
| Nov 6, 2024 | In progress issued Mar 2025 | 2765 Vallejo St | Millennial Concrete Inc | construction of (n) retaining wall consisting of lagging and two soldier piers at the soutwest portion of the subject property. 6'0" property line fence and other work under pa: 202009083673Details
construction of (n) retaining wall consisting of lagging and two soldier piers at the soutwest portion of the subject property. 6'0" property line fence and other work under pa: 202009083673 | $5,000 |
| Aug 30, 2024 | Expired or cancelled expired May 2026 | 2640 Jackson St | Clayton Timbrell & Co | revision to pa# 202206035584 new stone accents on the south and east elevations, new non-operable skylight w/ parapet, update plan layout of bedroom 405 and bathroom 407, incorporation of field revisions made during construction.Details
revision to pa# 202206035584 new stone accents on the south and east elevations, new non-operable skylight w/ parapet, update plan layout of bedroom 405 and bathroom 407, incorporation of field revisions made during construction. | $100,000 |
| Jul 24, 2024 | In progress issued Sep 2024 | 2640 Jackson St | Clayton Timbrell & Co | revision to pa 202206136222 to update required permit building codes from 2019 to 2022. revert r-2 occupancy from previous permit back to r-3 in alignment with current code & state of california law for aduDetails
revision to pa 202206136222 to update required permit building codes from 2019 to 2022. revert r-2 occupancy from previous permit back to r-3 in alignment with current code & state of california law for adu | |
| Jul 3, 2024 | Expired or cancelled expired Apr 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | revision to pa #2020-0930-5544 replace (e) slab at garage, remove (e) column, add (n) steel beam, columns & footing. (e) garage doors to be replaced in kindDetails
revision to pa #2020-0930-5544 replace (e) slab at garage, remove (e) column, add (n) steel beam, columns & footing. (e) garage doors to be replaced in kind | $10,000 |
| May 2, 2024 | Expired or cancelled expired Apr 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | document change to design in the field and remove requirements issued under bpa 202203039147 for ab 009 and fire shutters at property line openings now comply w/code section 705.8Details
document change to design in the field and remove requirements issued under bpa 202203039147 for ab 009 and fire shutters at property line openings now comply w/code section 705.8 | |
| Apr 29, 2024 | Completed final sign-off Feb 2025 | 2899 Vallejo St | Abacus Group Builders Inc | revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1Details
revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1 | |
| Mar 22, 2024 | In progress issued Sep 2024 | 9 25th North Av | Ggd Inc. | int. & ext. remodel w/ horizontal additions & infill.englarg wdw & door openings & new finishes throughout. excavation at 1/f laundry & gym areas. new structural,mech,elec systems. (e) front yard swimming pool to be replace with new & hot tub.Details
int. & ext. remodel w/ horizontal additions & infill.englarg wdw & door openings & new finishes throughout. excavation at 1/f laundry & gym areas. new structural,mech,elec systems. (e) front yard swimming pool to be replace with new & hot tub. | $2,800,000 |
| Mar 21, 2024 | Expired or cancelled expired May 2026 | 2640 Jackson St | Clayton Timbrell & Co | replace and expand 2nd floor deck. replace 3rd floor deck. infill at 3rd floor rear facade and expand 4/f balcony. ref# 202304065224Details
replace and expand 2nd floor deck. replace 3rd floor deck. infill at 3rd floor rear facade and expand 4/f balcony. ref# 202304065224 | $20,000 |
| Mar 14, 2024 | Expired or cancelled expired Apr 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | revision to pa# 202312212916 (n) raised planer bed along (e) property line retaining wall. (n) grade beams & lagging at (e) tree. rear yard workDetails
revision to pa# 202312212916 (n) raised planer bed along (e) property line retaining wall. (n) grade beams & lagging at (e) tree. rear yard work | $10,000 |
| Dec 7, 2023 | Completed final sign-off Feb 2025 | 2765 Vallejo St | Ggd Inc. | removal and replacement of a portion of (e) property line fence along the westernmost portion of the subject property. other work under permit 202009083673Details
removal and replacement of a portion of (e) property line fence along the westernmost portion of the subject property. other work under permit 202009083673 | $4,800 |
| Nov 29, 2023 | Completed final sign-off May 2026 | 2640 Jackson St | Clayton Timbrell & Co | revision to pa #202206035584 r1. replace brick in-kind at east & south facade, rebuild stair to match (e). new 90 min doors at elevator sheet, typ, all floorsDetails
revision to pa #202206035584 r1. replace brick in-kind at east & south facade, rebuild stair to match (e). new 90 min doors at elevator sheet, typ, all floors | $20,000 |
| Jul 19, 2023 | Completed final sign-off Mar 2024 | 1960 Broadway | Upscale Construction Inc. | unit 10: interior remodel-includes 10th fl bathroom, 11th fl bathroom, unit-only elevator removal and interior refinishing.Details
unit 10: interior remodel-includes 10th fl bathroom, 11th fl bathroom, unit-only elevator removal and interior refinishing. | $300,000 |
| May 25, 2023 | Never finaled issued Jun 2023, no final | 2778 Green St | Brady Construction Inc | revision to 201309257720 addenda 2. basememt remodel including above ground endless lap pool. above ground hot tub, and partial excavation for elevator & bathroomDetails
revision to 201309257720 addenda 2. basememt remodel including above ground endless lap pool. above ground hot tub, and partial excavation for elevator & bathroom | |
| May 12, 2023 | Completed final sign-off Feb 2024 | 3225 Clay St | Colindres & Associates | south facade repairs new wood deck, new in kind replacement windows and doors at south facade onlyDetails
south facade repairs new wood deck, new in kind replacement windows and doors at south facade only | $100,000 |
| Feb 3, 2023 | Completed final sign-off May 2023 | 2636 Union St | Ggd Inc. | front yard deck alterations, remove lowerportion of wood deck/rebuild stair, new wood to match (e), wood rail/deck, no interior work. no work in public right of way.Details
front yard deck alterations, remove lowerportion of wood deck/rebuild stair, new wood to match (e), wood rail/deck, no interior work. no work in public right of way. | $30,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2024 | 1717 Broderick St | 0303 Construction Inc. | addition of residential elevator at south exterior alley.Details
addition of residential elevator at south exterior alley. | $90,000 |
| Jun 3, 2022 | Completed final sign-off May 2026 | 2640 Jackson St | Ggd Inc. | interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit.Details
interior remodel including kitchen & baths, window sash replacements @ front facade, replacement of exterior windows & doors @ rear facade, addition of an elevator & addition of sprinklers. legalization of adu to be filed on seperate permit. | $1,200,000 |
| May 9, 2022 | Never finaled filed May 2022, never issued | 131 Devonshire Wy | addition of one adu unit on the new, proposed ground floor below an existing, two-story residence per the state adu program. entry to the 2-bedroom, 1.5 bath adu would be from oak park drive.Details
addition of one adu unit on the new, proposed ground floor below an existing, two-story residence per the state adu program. entry to the 2-bedroom, 1.5 bath adu would be from oak park drive. | $400,000 | |
| Apr 18, 2022 | Never finaled issued Apr 2023, no final | 2151 Pacific Av | Clayton Timbrell & Co | addition of penthouse at roof level & relocation of existing roof deck to north side of roof. addition of solar panels & mechanical enclosure. new support cowling around existing chimney flues base.Details
addition of penthouse at roof level & relocation of existing roof deck to north side of roof. addition of solar panels & mechanical enclosure. new support cowling around existing chimney flues base. | $250,000 |
| Mar 29, 2022 | Expired or cancelled expired May 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | new retaining wall and fence at south property line and fenceDetails
new retaining wall and fence at south property line and fence | $40,000 |
| Mar 7, 2022 | Completed final sign-off May 2025 | 1558 Grove St | Box Canyon Builders Dba The Englander | ground floor expansion at rear and dormer at stair.Details
ground floor expansion at rear and dormer at stair. | $50,000 |
| Mar 3, 2022 | Expired or cancelled expired May 2026 | 2845 Fillmore St | add 80 sqft addition at first floor on southwest side, remodel existing bathrooms and bedrooms at first floor. cut back exterior second floor deck along west elevation and add new metal spiral stair. new at laundry room and new at north property line . rev to pa 202009305544Details
add 80 sqft addition at first floor on southwest side, remodel existing bathrooms and bedrooms at first floor. cut back exterior second floor deck along west elevation and add new metal spiral stair. new at laundry room and new at north property line . rev to pa 202009305544 | $350,000 | |
| Feb 22, 2022 | Completed final sign-off Jun 2024 | 2151 Pacific Av | Clayton Timbrell & Co | revision to pa 2021-0727-5165 for change in height to retaining walls at unit #1 rear yardDetails
revision to pa 2021-0727-5165 for change in height to retaining walls at unit #1 rear yard | $95,000 |
| Feb 4, 2022 | Completed final sign-off Feb 2025 | 2765 Vallejo St | Ggd Inc. | partial infill of east lightwell on 2/3 floor only. (no extension past existing envelope) other work under permit no. 2020 0908 3673Details
partial infill of east lightwell on 2/3 floor only. (no extension past existing envelope) other work under permit no. 2020 0908 3673 | $45,000 |
| Feb 3, 2022 | Never finaled issued Mar 2022, no final | 2151 Pacific Av | Clayton Timbrell & Co | addition of roof deck that is less than 500 sf.Details
addition of roof deck that is less than 500 sf. | $175,000 |
| Jul 27, 2021 | Completed final sign-off Jul 2024 | 2151 Pacific Av | Clayton Timbrell & Co | unit 1: interior remodel, foundation repair and re-roofing, new in-kind garage door.Details
unit 1: interior remodel, foundation repair and re-roofing, new in-kind garage door. | $250,000 |
| Jul 27, 2021 | Completed final sign-off Jul 2024 | 2151 Pacific Av | Clayton Timbrell & Co | unit 2: interior remodel, foundation repair and re-roofing, new in-kind garage door.Details
unit 2: interior remodel, foundation repair and re-roofing, new in-kind garage door. | $250,000 |
| Apr 7, 2021 | Never finaled issued Jan 2023, no final | 3737 Jackson St | Colindres & Associates | expansion of garage (sub-basement) level. expansion @ basement level. addition @ south (rear) end of builidng. addition of 4th floor level. addition of elevator. addition of automatic sprinkler system. new hardscape in rear yard. const type form v-a to (i-a & v-a). adu @ basement under state programDetails
expansion of garage (sub-basement) level. expansion @ basement level. addition @ south (rear) end of builidng. addition of 4th floor level. addition of elevator. addition of automatic sprinkler system. new hardscape in rear yard. const type form v-a to (i-a & v-a). adu @ basement under state program | $900,000 |
| Mar 4, 2021 | Completed final sign-off Nov 2021 | 1805 Buchanan St | Brady Construction Inc | revision to pa 201602220182 s-2 and pa 201907125765. correct the building sotries from "3 stories over basement" to "4 stories" remove egress windows from 4th story bedrooms as allowed by cbc 1030.1 general. no structural or exterior changes.Details
revision to pa 201602220182 s-2 and pa 201907125765. correct the building sotries from "3 stories over basement" to "4 stories" remove egress windows from 4th story bedrooms as allowed by cbc 1030.1 general. no structural or exterior changes. | |
| Dec 21, 2020 | Never finaled issued Jan 2021, no final | 170 Palo Alto Av | Ggd Inc. | revision to bpa# 201912200188 to include a minor change to the interior floor plan or the existing pool house, minor electrical work. no exterior work required.Details
revision to bpa# 201912200188 to include a minor change to the interior floor plan or the existing pool house, minor electrical work. no exterior work required. | $5,000 |
| Nov 13, 2020 | Completed final sign-off Dec 2022 | 3070 Pacific Av | Colindres & Associates | selective seismic structural upgrade, no change to architectural plans & elevations. ref pa# 202008292928Details
selective seismic structural upgrade, no change to architectural plans & elevations. ref pa# 202008292928 | $165,000 |
| Nov 4, 2020 | Completed final sign-off May 2025 | 1558 Grove St | Box Canyon Builders Dba The Englander | revision to previous no plan pa# 202008101472 : interior remodel & attic conversion with full seismic upgrade. new windows/doors at rear. no change to bldg envelope. no landscape/site work. fire sprinkler nfpa 13r under separate permit.Details
revision to previous no plan pa# 202008101472 : interior remodel & attic conversion with full seismic upgrade. new windows/doors at rear. no change to bldg envelope. no landscape/site work. fire sprinkler nfpa 13r under separate permit. | $900,000 |
| Oct 20, 2020 | Never finaled issued Jan 2022, no final | 2622 Jackson St | Upscale Construction Inc. | addition of a motorized steel driveway gate for security, located at the southeast corner of the house.Details
addition of a motorized steel driveway gate for security, located at the southeast corner of the house. | $40,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2024 | 3801 Jackson St | Jeff King And Company Inc | interior remodel including kitchen & baths, replacemet of (e) windows & doors, in kind. foundation upgrade, energy upgrade, & full seismic upgrade. pv panels & fire sprinklers under separate permit.Details
interior remodel including kitchen & baths, replacemet of (e) windows & doors, in kind. foundation upgrade, energy upgrade, & full seismic upgrade. pv panels & fire sprinklers under separate permit. | $550,000 |
| Aug 29, 2020 | Completed final sign-off Jan 2023 | 3070 Pacific Av | Colindres & Associates | interior remodel including basement bath, 1st fl kitchen, 2nd fl bathrooms, and reconfiguration of 3rd fl. exterior work includes replacements of 3 windows in-kind on north elevation. 1 window & 4 doors in kind on east. replace glass only on 5 windows & doors on east & south.Details
interior remodel including basement bath, 1st fl kitchen, 2nd fl bathrooms, and reconfiguration of 3rd fl. exterior work includes replacements of 3 windows in-kind on north elevation. 1 window & 4 doors in kind on east. replace glass only on 5 windows & doors on east & south. | $465,000 |
| Aug 26, 2020 | Completed final sign-off Oct 2021 | 153 Upper Tr | Clayton Timbrell & Co | revision to pa# 201901150363 (scope reduction)- relocate (1) window on north facade. minor interior remodel on ground fl. remove tub & replace fixtures & finishes in 3rd fl bath. all structural work removed from scope.Details
revision to pa# 201901150363 (scope reduction)- relocate (1) window on north facade. minor interior remodel on ground fl. remove tub & replace fixtures & finishes in 3rd fl bath. all structural work removed from scope. | |
| Nov 21, 2012 | Completed final sign-off Sep 2015 | 465 Grant Av | Transworld Construction | remodel lobby including new finishes,reception desk. replace (e) storefront windows & tile at ext ground flr w/new in kind. voluntary ada upgrade of two guestrms @ 6th flr, flrs 2-6: cosmetic remodel 70 guestrms including new carpet & paint, new bathrm fixtures & shower stalls, new bathrm tileDetails
remodel lobby including new finishes,reception desk. replace (e) storefront windows & tile at ext ground flr w/new in kind. voluntary ada upgrade of two guestrms @ 6th flr, flrs 2-6: cosmetic remodel 70 guestrms including new carpet & paint, new bathrm fixtures & shower stalls, new bathrm tile | $425,000 |
| Jul 20, 2012 | Never finaled issued Jul 2012, no final | 807 Columbus Av | Kevin Slagle Design & Build | revision to pa# 2012-0209-3900-t.i of (e) vacant ground floor commercial space. modify partitions at employee area & office. no exterior workDetails
revision to pa# 2012-0209-3900-t.i of (e) vacant ground floor commercial space. modify partitions at employee area & office. no exterior work | $2,000 |