Arnold Lee Lerner
- Listed as
- architect, authorized agent-others
- Firm
- Lerner & Assoc Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Oct 2023
34 permits since 2000 (architect on 33 permits, authorized agent-others on 1 permit): 19 completed, 8 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 11, 2023 | Completed final sign-off Oct 2023 | 2150 Taraval St | Sf Gonzalez Concrete Inc. | revision to pa# 202207128281. to document public works dac reviewer (edward liu) requirement to provide level landing at entrance and to remove the power door operators from the scope.Details
revision to pa# 202207128281. to document public works dac reviewer (edward liu) requirement to provide level landing at entrance and to remove the power door operators from the scope. | |
| Dec 29, 2022 | Completed final sign-off Nov 2023 | 558 Capp St | Ken O'sullivan Construction And Renovati | to comply with infeasibility or undreasonable hardship abe ordinance per 51-16, abe#202008312908, replace existing handrails at existing stairs leading to entrance, add contrast stripping on stair treads, add sign at entry step, applying for technical infeasibility because of stairsDetails
to comply with infeasibility or undreasonable hardship abe ordinance per 51-16, abe#202008312908, replace existing handrails at existing stairs leading to entrance, add contrast stripping on stair treads, add sign at entry step, applying for technical infeasibility because of stairs | $12,017 |
| Jul 12, 2022 | Completed final sign-off Oct 2023 | 2150 Taraval St | Sf Gonzalez Concrete Inc. | to comply with abe# 201812143003. replace power door operator & actuators with one that facing sidewalk. redesign parking lot to include accessible van space. provide path of travel from accessible stall to entrance including regarding sidewalk, parking lot to recessed entrance. reduce curbcut.Details
to comply with abe# 201812143003. replace power door operator & actuators with one that facing sidewalk. redesign parking lot to include accessible van space. provide path of travel from accessible stall to entrance including regarding sidewalk, parking lot to recessed entrance. reduce curbcut. | $178,000 |
| Dec 16, 2020 | Never finaled issued Mar 2021, no final | 380 Eddy St | install evacuation maps for the "cadillac hotel"Details
install evacuation maps for the "cadillac hotel" | $15,000 | |
| Dec 17, 2019 | Completed final sign-off Jun 2021 | 1187 Franklin St | Angotti & Reilly Inc. | provide gender neutral restrooms at existing library,one of them accessible.accessibility upgrades@existing multi-user restrooms including:a)replac lavatory in women's+men's w/lavatory with rim no higher than 34".b)provide power door operator at men's.c)lower mirrors.d)replace toilet partitions,Details
provide gender neutral restrooms at existing library,one of them accessible.accessibility upgrades@existing multi-user restrooms including:a)replac lavatory in women's+men's w/lavatory with rim no higher than 34".b)provide power door operator at men's.c)lower mirrors.d)replace toilet partitions, | $200,000 |
| Nov 21, 2019 | Never finaled issued Nov 2019, no final | 55 Brady St | per owner's request, add address for commercial unit on the ground floor as "55 brady street" per block map.Details
per owner's request, add address for commercial unit on the ground floor as "55 brady street" per block map. | ||
| Jul 12, 2019 | Completed final sign-off Jul 2021 | 1187 Franklin St | Angotti & Reilly Inc. | alteration (new openings in (e) wall and holes for conduit) at 1st flr library for 2 futre accessible single user restrooms, hall and small conference room. alterations (cores) at (e) multi-user restrooms for future horn strobes.Details
alteration (new openings in (e) wall and holes for conduit) at 1st flr library for 2 futre accessible single user restrooms, hall and small conference room. alterations (cores) at (e) multi-user restrooms for future horn strobes. | $54,000 |
| Dec 20, 2017 | Never finaled issued Jun 2019, no final | 1533 Franklin St | Amone Corp, Buhler Construction | remodel 4 story vacant building for use as a hostel. existing restaurant to remain. remodel ground fl restaurant for use as hostel reception, lobby, cafe, bar and back of house uses. install vertical platform lift for access to 2nd fl. remodel 2nd, 3rd, 4th fl to include 25 guestrooms, 12 toilets,Details
remodel 4 story vacant building for use as a hostel. existing restaurant to remain. remodel ground fl restaurant for use as hostel reception, lobby, cafe, bar and back of house uses. install vertical platform lift for access to 2nd fl. remodel 2nd, 3rd, 4th fl to include 25 guestrooms, 12 toilets, | $622,000 |
| Sep 8, 2017 | Never finaled issued Sep 2017, no final | 2007 Franklin St | Oliver & Company Inc. | revision to pa#201012217130-r3, retain (e) door to former pantry addition, omit 1 hr. infill per california historical bldg code, building is fully sprinklered locate wall at rear of storage 113 to clear existing trim at door to remain. n/a ordinance #155-13Details
revision to pa#201012217130-r3, retain (e) door to former pantry addition, omit 1 hr. infill per california historical bldg code, building is fully sprinklered locate wall at rear of storage 113 to clear existing trim at door to remain. n/a ordinance #155-13 | |
| Jan 17, 2017 | Completed final sign-off Jul 2018 | 175 Twin Peaks Bl | add deck on south side of house at 2nd floor.Details
add deck on south side of house at 2nd floor. | $65,000 | |
| Apr 15, 2016 | Completed final sign-off Jan 2018 | 455 Fair Oaks St | Ken O'sullivan Construction And Renovati | horizontal addition. addition of accessible entry, accessible restroom and ramp at north side of building, sidewalk replacement for transition at base of ramp. (reviewed by eiliesh tuffy, planning).Details
horizontal addition. addition of accessible entry, accessible restroom and ramp at north side of building, sidewalk replacement for transition at base of ramp. (reviewed by eiliesh tuffy, planning). | $60,000 |
| Jan 8, 2016 | Completed final sign-off May 2016 | 1314 Grant Av | renovation of storefront commercial space for use as a retail bakery space. installation of display counters, hand washing sink, 3 compartment sink, electric bakery oven (warming) & refrigerated drink displays, modify entrance & add door openersDetails
renovation of storefront commercial space for use as a retail bakery space. installation of display counters, hand washing sink, 3 compartment sink, electric bakery oven (warming) & refrigerated drink displays, modify entrance & add door openers | $27,894 | |
| Sep 18, 2015 | Never finaled issued Jan 2016, no final | 63 Ellis St | C D R Construction | 3rd floor -interior work includes, but is not limited to the following: relocation of 3rd floor bar to space between elevator & new stair, extension of 3rd floor dining area into existing kitchen. new occupant laod for all three floors- sffd assembly permitDetails
3rd floor -interior work includes, but is not limited to the following: relocation of 3rd floor bar to space between elevator & new stair, extension of 3rd floor dining area into existing kitchen. new occupant laod for all three floors- sffd assembly permit | $40,000 |
| Jul 1, 2015 | Expired or cancelled cancelled Nov 2022 | 101 Topeka Av | Bel Builders Inc | horizontal & vertical addition. expansion of 2 bedrm, bathrm residence. the expansion keep the (e) front facade, east wall & 2nd flr plate in place, extends the living area to the west property line & into the rear yard & adds a new 3rd flr, the (e) garage flr is lowered to provide code req'd.Details
horizontal & vertical addition. expansion of 2 bedrm, bathrm residence. the expansion keep the (e) front facade, east wall & 2nd flr plate in place, extends the living area to the west property line & into the rear yard & adds a new 3rd flr, the (e) garage flr is lowered to provide code req'd. | $728,243 |
| Jun 3, 2014 | Never finaled issued Dec 2014, no final | 63 Ellis St | Redican Homes | remodel entrance for accessibility including powered door operators for adequate door width clearance, replace threshold, fix inner doors in place for adequate clear space in front of ext. doors. this work is barrier removal only.Details
remodel entrance for accessibility including powered door operators for adequate door width clearance, replace threshold, fix inner doors in place for adequate clear space in front of ext. doors. this work is barrier removal only. | $6,500 |
| May 13, 2014 | Completed final sign-off Dec 2014 | 82 02nd St | remodel and enlarge 2nd floor restrooms for accessibility, relocate water heater, demolish one shower, the work is for barrier removal.Details
remodel and enlarge 2nd floor restrooms for accessibility, relocate water heater, demolish one shower, the work is for barrier removal. | $24,000 | |
| Dec 30, 2013 | Completed final sign-off Dec 2018 | 3045 23rd St | (front bldg).compliance with ordinance no.155-13 not required. excavation <50 cu.yd. remodel lower, upper & expand upper unit into attic. new mechanical systems, new kitchens & applicance. new bath fixtures. replace (e) wood windows with new wood windows to match. add (2) dormers & deck at rear ofDetails
(front bldg).compliance with ordinance no.155-13 not required. excavation <50 cu.yd. remodel lower, upper & expand upper unit into attic. new mechanical systems, new kitchens & applicance. new bath fixtures. replace (e) wood windows with new wood windows to match. add (2) dormers & deck at rear of | $375,000 | |
| Aug 16, 2013 | Completed final sign-off Sep 2013 | 124 Teddy Av | comply with nov# 201312371-required inspection to abate complaint, work includes alterations/replacement in kind of front stairs & deck. reconfiguring stair layoutDetails
comply with nov# 201312371-required inspection to abate complaint, work includes alterations/replacement in kind of front stairs & deck. reconfiguring stair layout | $8,550 | |
| Jun 1, 2012 | Completed final sign-off Aug 2012 | 2901 Pacific Av | Faubel Construction Inc. | 1st floor/suite #103 & 109-barrier removal work, alter (e) hotel bathrooms for accessiblityDetails
1st floor/suite #103 & 109-barrier removal work, alter (e) hotel bathrooms for accessiblity | $30,000 |
| Jun 24, 2011 | Expired or cancelled cancelled Nov 2024 | 575 10th St | response to complaint from sf fire dept#14704 work includes installation of emergency exit lights/signage, fireproofing of drapevy. change of use from ware house to 45 seat theater (b). mep separate permit.Details
response to complaint from sf fire dept#14704 work includes installation of emergency exit lights/signage, fireproofing of drapevy. change of use from ware house to 45 seat theater (b). mep separate permit. | $3,500 | |
| Dec 21, 2010 | Completed final sign-off Aug 2018 | 2007 Franklin St | Oliver & Company Inc. | barrier removal. provide ramp up to side entry door. expand & remodel ground floor restroom into accessible unisex restroom.stripe top & bottom tread of interior stairs & exterior stairs. add handrail to front entrance steps.Details
barrier removal. provide ramp up to side entry door. expand & remodel ground floor restroom into accessible unisex restroom.stripe top & bottom tread of interior stairs & exterior stairs. add handrail to front entrance steps. | $79,500 |
| Dec 21, 2010 | Completed final sign-off Aug 2018 | 2007 Franklin St | Oliver & Company Inc. | change of use frm sfd to mixed use, office, museum& residence. legalize 3rd flr 2nd unit. install fire escape @rear of bldg, convert library into living space & connect w/ living & bathrms. add illuminated exit signs & lighting. rear stair replacement.Details
change of use frm sfd to mixed use, office, museum& residence. legalize 3rd flr 2nd unit. install fire escape @rear of bldg, convert library into living space & connect w/ living & bathrms. add illuminated exit signs & lighting. rear stair replacement. | $102,000 |
| Dec 17, 2010 | Expired or cancelled expired Jul 2013 | 1092 Post St | Caputo Construction | t.i. for vacant "bar space". new tenant-remodel restrooms for accessiblity, install new bar with seating, install new entry doorsDetails
t.i. for vacant "bar space". new tenant-remodel restrooms for accessiblity, install new bar with seating, install new entry doors | $40,000 |
| Jun 4, 2010 | Completed final sign-off May 2012 | 146 Leavenworth St | Amone Corp | replace sidewalk over sub-sidewalk space. remodel 1st floor restroom. install 5 stop hydrallic elevator, upgrade to full sprinkler. remodel 2nd floor homeless shelter. install new roof deck. historic resource.Details
replace sidewalk over sub-sidewalk space. remodel 1st floor restroom. install 5 stop hydrallic elevator, upgrade to full sprinkler. remodel 2nd floor homeless shelter. install new roof deck. historic resource. | $571,000 |
| Jun 3, 2010 | Expired or cancelled expired Mar 2013 | 605 Kearny St | Housing Construction Inc. | in response to complaint id# 10534 for violating conditions of approval contained in motion# 1649 (case# 2001.0249 ekcv) as a result of the violations, a stop work order for work performed under pa# 2002/02/11/8951 was issued on 12/31/09 by acting zoning administrator kelley amdur. project plannerDetails
in response to complaint id# 10534 for violating conditions of approval contained in motion# 1649 (case# 2001.0249 ekcv) as a result of the violations, a stop work order for work performed under pa# 2002/02/11/8951 was issued on 12/31/09 by acting zoning administrator kelley amdur. project planner | |
| Jan 14, 2010 | Completed final sign-off Mar 2010 | 585 Columbus Av | replace counter, wine display, install (n) tilel flooring replace entrance doors w/accessible 3' door.Details
replace counter, wine display, install (n) tilel flooring replace entrance doors w/accessible 3' door. | $10,000 | |
| Jul 24, 2009 | Completed final sign-off Aug 2009 | 958 Geary St | to justify the change of use from retail to medical cannabis dispensary, no work under this permit, ref pa #200903053401Details
to justify the change of use from retail to medical cannabis dispensary, no work under this permit, ref pa #200903053401 | ||
| Jul 21, 2009 | Completed final sign-off Jul 2009 | 3239 Sacramento St | revision to pa# 2009.06.04.9789 ( for change of use) per building inspector's request. review rating of property line walls, travel distance to exit and verify # of stories.Details
revision to pa# 2009.06.04.9789 ( for change of use) per building inspector's request. review rating of property line walls, travel distance to exit and verify # of stories. | ||
| Jun 6, 2007 | Expired or cancelled expired Jul 2009 | 333 Ofarrell St | converting guest room to executive offices. suite 3-1650 conversion, change of occupancy.Details
converting guest room to executive offices. suite 3-1650 conversion, change of occupancy. | $55,000 | |
| Jan 18, 2007 | Expired or cancelled cancelled Jan 2008 | 610 Fillmore St | partial code compliance renovations as per order of abatement bldg code orders #1671991, #163722, #167437, exhibits b & status report 1/25/96. please refer to senior housing inspector partick mckenzie and his complaint #h9481166 eliminate 9 guest rooms.Details
partial code compliance renovations as per order of abatement bldg code orders #1671991, #163722, #167437, exhibits b & status report 1/25/96. please refer to senior housing inspector partick mckenzie and his complaint #h9481166 eliminate 9 guest rooms. | $50,000 | |
| Mar 24, 2006 | Completed final sign-off Jan 2009 | 2135 Sutter St | this permit is rev to 9801717(seismic upgrade to umb).gary ho was orig plan ck.wk consists disabled access wk plans prev reviewed by luellen dcp.also had pre appl plan review meeting w/debella(sffd)&r.cheung.wk incl(n)elevator,unisex restrooms.cost incl credit for prev permit which had elev,bathrms.Details
this permit is rev to 9801717(seismic upgrade to umb).gary ho was orig plan ck.wk consists disabled access wk plans prev reviewed by luellen dcp.also had pre appl plan review meeting w/debella(sffd)&r.cheung.wk incl(n)elevator,unisex restrooms.cost incl credit for prev permit which had elev,bathrms. | $100,000 | |
| Feb 28, 2006 | Never finaled issued Sep 2008, no final | 1808 Bush St | horrizontal addition at 2nd floor/garage at 1st floor with new roof deck/new foundation and driveway and retaining wall/new kchn and bathrooms/rebuild 2nd unit which was illegally removed by previous ownerDetails
horrizontal addition at 2nd floor/garage at 1st floor with new roof deck/new foundation and driveway and retaining wall/new kchn and bathrooms/rebuild 2nd unit which was illegally removed by previous owner | $285,000 | |
| Dec 8, 2004 | Never finaled issued Dec 2004, no final | 590 Bush St | Webcor Construction Lp | as per correction notice & report by tam chiu dated 11/22/04, handrails added to (e) ramp,Details
as per correction notice & report by tam chiu dated 11/22/04, handrails added to (e) ramp, | $1,000 |
| Oct 22, 2004 | Expired or cancelled expired Sep 2006 | 590 Bush St | Webcor Construction Lp | hardship forms for path of travel to bathroom approved in permit 200410136608. install new stairs,Details
hardship forms for path of travel to bathroom approved in permit 200410136608. install new stairs, | $4,500 |