Arlene Custock
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Pac Integrations Inc
- Based in
- Concord
- On San Francisco permits
- Sep 2001 to Jan 2026
66 permits since 2000 (contractor on 66 permits, authorized agent-others on 3 permits, designer on 1 permit): 51 completed, 1 in progress, 10 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2026 | Completed final sign-off Mar 2026 | 2250 Vallejo St | Pac Integrations Inc | fire sprinkler monitoring system with facp (e). we are adding a dual path cellular communicator to replace analog phone lines.Details
fire sprinkler monitoring system with facp (e). we are adding a dual path cellular communicator to replace analog phone lines. | $6,300 |
| Sep 26, 2024 | Completed final sign-off Nov 2024 | 350 Ellis St | Pac Integrations Inc | fire alarm sleeping area decibel testDetails
fire alarm sleeping area decibel test | $5,000 |
| Sep 20, 2024 | Completed final sign-off Apr 2025 | 442 Post St | Pac Integrations Inc | revised as built fire alarm drawing for 202405091838. added existing tamper switches to as built drawingsDetails
revised as built fire alarm drawing for 202405091838. added existing tamper switches to as built drawings | $17,942 |
| May 10, 2024 | Completed final sign-off Aug 2024 | 750 33rd Av | Pac Integrations Inc | add lte communicator - telguard 7feDetails
add lte communicator - telguard 7fe | $6,671 |
| May 9, 2024 | Completed final sign-off Aug 2024 | 823 Euclid Av | Pac Integrations Inc | fire alarm only- add lte communicator (telguard tg-7fe)Details
fire alarm only- add lte communicator (telguard tg-7fe) | $6,671 |
| May 9, 2024 | In progress issued May 2024 | 442 Post St | Pac Integrations Inc | emergency fire alarm control panel replacementDetails
emergency fire alarm control panel replacement | $17,942 |
| Mar 18, 2024 | Completed final sign-off Sep 2024 | 220 Cashmere St | Pac Integrations Inc | sleeping area requirements decibel test- piillow test "to verify existing sound levels in sleeping areas, comply with sffc sec. 1103.7.6.1"Details
sleeping area requirements decibel test- piillow test "to verify existing sound levels in sleeping areas, comply with sffc sec. 1103.7.6.1" | |
| Oct 13, 2023 | Completed final sign-off Nov 2023 | 1527 Grant Av | Pac Integrations Inc | revision changes pa# 202206095963, per meeting w/sffd we ae making the following changes, add 3 strobes @ 1/f, add 5 horn strobes @ 1/f, add 2 horn strobes @ basement, add remote annunciator @ 1/f, removed all mps except 1 @ the facp, add maps @ remote annunciators @ annunciators.Details
revision changes pa# 202206095963, per meeting w/sffd we ae making the following changes, add 3 strobes @ 1/f, add 5 horn strobes @ 1/f, add 2 horn strobes @ basement, add remote annunciator @ 1/f, removed all mps except 1 @ the facp, add maps @ remote annunciators @ annunciators. | $30,000 |
| Aug 15, 2023 | Completed final sign-off Sep 2023 | 230 Cashmere St | Pac Integrations Inc | we added an lte communicatodr as an emergency replacement as the phone lines for the fire alarm stopped working.Details
we added an lte communicatodr as an emergency replacement as the phone lines for the fire alarm stopped working. | $3,300 |
| Jun 12, 2023 | Completed final sign-off Aug 2023 | 102 South Park | Pac Integrations Inc | common areas/kitchens 2, 3 & 4: add magnetic door holders on (3) kitchen doors, smoke detectors in (3) kitchenDetails
common areas/kitchens 2, 3 & 4: add magnetic door holders on (3) kitchen doors, smoke detectors in (3) kitchen | $4,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 22 South Park | Pac Integrations Inc | common areas/kitchens 2&3: add magnetic door holders on (2) kitchen doors, smoke detectors in (2) kitchen rooms.Details
common areas/kitchens 2&3: add magnetic door holders on (2) kitchen doors, smoke detectors in (2) kitchen rooms. | $6,000 |
| Apr 25, 2023 | Completed final sign-off Dec 2024 | 135 Locust St | Pac Integrations Inc | pac to install a fire alarm system to monitor the sprinkler systemDetails
pac to install a fire alarm system to monitor the sprinkler system | $15,000 |
| Apr 13, 2023 | Completed final sign-off Sep 2023 | 777 Broadway | Pac Integrations Inc | as-built revision to pa# 202206095951. fire alarm. change horns & horns strobes from ceiling mounted to wall mounted. add 2 elevator relays due to elevator changes.Details
as-built revision to pa# 202206095951. fire alarm. change horns & horns strobes from ceiling mounted to wall mounted. add 2 elevator relays due to elevator changes. | $3,000 |
| Feb 27, 2023 | Completed final sign-off Dec 2023 | 3610 Washington St | Pac Integrations Inc | fire sprinlker monitoring previously approved. adding a relay to drop poer at a door that will now be access controlled. ref bpa#202212128133Details
fire sprinlker monitoring previously approved. adding a relay to drop poer at a door that will now be access controlled. ref bpa#202212128133 | $20,000 |
| Dec 12, 2022 | Completed final sign-off Jan 2024 | 3610 Washington St | Pac Integrations Inc | fire sprinkler monitoring system to be installed.Details
fire sprinkler monitoring system to be installed. | $16,690 |
| Oct 6, 2022 | Completed final sign-off Dec 2022 | 1204 Mason St | Pac Integrations Inc | revision to pa# 2022-0609-5977: revising the (e) exiting facp and remote power supply will show additional (e) devices in rooms 06,10,19,21,120,130, and 140. no new work is being doneDetails
revision to pa# 2022-0609-5977: revising the (e) exiting facp and remote power supply will show additional (e) devices in rooms 06,10,19,21,120,130, and 140. no new work is being done | $2,000 |
| Oct 6, 2022 | Completed final sign-off Sep 2023 | 777 Broadway | Pac Integrations Inc | revised drawings of permit 202206095951 to remove (1) remote power supply as it is, not needed. no other work completedDetails
revised drawings of permit 202206095951 to remove (1) remote power supply as it is, not needed. no other work completed | |
| Jun 9, 2022 | Never finaled issued Jun 2022, no final | 1204 Mason St | Pac Integrations Inc | upgrade (e) fire alarm/ sprinkler monitoring system in h.i. room: upgrading (e) facp, adding power supply in rm. adding lfh, strobes, smoke detectors, and co detector in rm. all other fire alarm devices will remain as well.Details
upgrade (e) fire alarm/ sprinkler monitoring system in h.i. room: upgrading (e) facp, adding power supply in rm. adding lfh, strobes, smoke detectors, and co detector in rm. all other fire alarm devices will remain as well. | $20,000 |
| Jun 9, 2022 | Completed final sign-off Nov 2023 | 1527 Grant Av | Pac Integrations Inc | fire only: modification of extg sprinkler monitoring system to accomodate 2 hi rooms. 33-l and 5-c. this will requre us to replace the extg facp & all extg devices. we will be installing nw lf horns in all residential units & nw sounders, and strobes, sd, and co detectors in the h.i. roomsDetails
fire only: modification of extg sprinkler monitoring system to accomodate 2 hi rooms. 33-l and 5-c. this will requre us to replace the extg facp & all extg devices. we will be installing nw lf horns in all residential units & nw sounders, and strobes, sd, and co detectors in the h.i. rooms | $80,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2023 | 777 Broadway | Pac Integrations Inc | unit #101, 210, 309: modifiy (e) fire sprinkler monitoring system to include 3 (n) hearing impaired rooms. upgrade (e) fire alarm panel, add lf horns and strobes, smoke detectors and co detectors. reuse all other (e) fire alarm equipment.Details
unit #101, 210, 309: modifiy (e) fire sprinkler monitoring system to include 3 (n) hearing impaired rooms. upgrade (e) fire alarm panel, add lf horns and strobes, smoke detectors and co detectors. reuse all other (e) fire alarm equipment. | $50,000 |
| Apr 29, 2022 | Completed final sign-off Jun 2022 | 2740 Green St | Pac Integrations Inc | sprinkler monitoring fire alarm stand-alone. revision to permit 2021.1203.3620Details
sprinkler monitoring fire alarm stand-alone. revision to permit 2021.1203.3620 | $2,500 |
| Apr 6, 2022 | Completed final sign-off Jun 2022 | 2740 Green St | Pac Integrations Inc | revision to pa 202112033620 to add 4 mini horns to scope. sprinkler monitoring fire alarm w/ mini-horns per flr. ref pa 202203099584.Details
revision to pa 202112033620 to add 4 mini horns to scope. sprinkler monitoring fire alarm w/ mini-horns per flr. ref pa 202203099584. | $2,500 |
| Dec 16, 2021 | Completed final sign-off Jan 2022 | 106 South Park | Pac Integrations Inc | as built change to 202110271310. changed facp from 6820 to 6808. adjusted nac circuits 5 & 6 to faps. removed sd low frequency bases, added low frequency horns to replace low requency sounder bases. changed calculations.Details
as built change to 202110271310. changed facp from 6820 to 6808. adjusted nac circuits 5 & 6 to faps. removed sd low frequency bases, added low frequency horns to replace low requency sounder bases. changed calculations. | |
| Dec 13, 2021 | Completed final sign-off Jan 2022 | 102 South Park | Pac Integrations Inc | as built revision to 202110200868. revised locations of flow switches and 120vac horn strobe. updated wire routes and nac circuits. replace lf sounder bases with horn strobe in hi rooms, revised calcs.Details
as built revision to 202110200868. revised locations of flow switches and 120vac horn strobe. updated wire routes and nac circuits. replace lf sounder bases with horn strobe in hi rooms, revised calcs. | |
| Dec 6, 2021 | Completed final sign-off Dec 2021 | 34 Maple St | Pac Integrations Inc | revision to pa# 2021-1105-1891 as-built fire alarm.Details
revision to pa# 2021-1105-1891 as-built fire alarm. | |
| Dec 3, 2021 | Completed final sign-off Jun 2022 | 2740 Green St | Pac Integrations Inc | sprinkler monitoring fire systemDetails
sprinkler monitoring fire system | $10,000 |
| Nov 5, 2021 | Completed final sign-off Dec 2021 | 34 Maple St | Pac Integrations Inc | sprinkler system to be monitored by burglar/fire alarm comno control panelDetails
sprinkler system to be monitored by burglar/fire alarm comno control panel | $5,000 |
| Oct 27, 2021 | Completed final sign-off Jan 2022 | 106 South Park | Pac Integrations Inc | revising #2019/1218/9921-s-5. changing fire alarm manufacturer from fahenhyt to silent knight do to supply issues. no changes in operation matrix or device locations.Details
revising #2019/1218/9921-s-5. changing fire alarm manufacturer from fahenhyt to silent knight do to supply issues. no changes in operation matrix or device locations. | |
| Oct 20, 2021 | Completed final sign-off Jan 2022 | 102 South Park | Pac Integrations Inc | we had to change the facp and addressable devices from farhyant to silent knight. no changes in scope of work. permit app #202009113988Details
we had to change the facp and addressable devices from farhyant to silent knight. no changes in scope of work. permit app #202009113988 | |
| Jun 21, 2021 | Completed final sign-off Jan 2022 | 22 South Park | Pac Integrations Inc | as-built changes to approved plan (pa #2021-0331-7660 r1). had to change legend symbol from wall to ceiling room horns and some hallway horn strobes. made some hallway h/s strobe only due to high sound levels, added a 2nd tamper switch, change both room h/s to strobe only, change make & model of lfhDetails
as-built changes to approved plan (pa #2021-0331-7660 r1). had to change legend symbol from wall to ceiling room horns and some hallway horn strobes. made some hallway h/s strobe only due to high sound levels, added a 2nd tamper switch, change both room h/s to strobe only, change make & model of lfh | |
| Mar 31, 2021 | Completed final sign-off Jan 2022 | 22 South Park | Pac Integrations Inc | as built changes to approved plan/permit # 2020-0912-4009 !. due to items discovered during construction new conduit and wire was installed to all existing notification device. 2. due to plan changes the elevator equipment room was relocated. 3. door swings to lunch room were changed.Details
as built changes to approved plan/permit # 2020-0912-4009 !. due to items discovered during construction new conduit and wire was installed to all existing notification device. 2. due to plan changes the elevator equipment room was relocated. 3. door swings to lunch room were changed. | |
| Dec 21, 2020 | Completed final sign-off Jan 2021 | 323 Cumberland St | Pac Integrations Inc | sprinkler monitoring systemDetails
sprinkler monitoring system | $10,000 |
| Dec 15, 2020 | Completed final sign-off Jun 2021 | 3725 Washington St | Pac Integrations Inc | sprinkler monitoring system. as builts requested by fire inspector.Details
sprinkler monitoring system. as builts requested by fire inspector. | $1,000 |
| Sep 12, 2020 | Completed final sign-off Mar 2022 | 22 South Park | Pac Integrations Inc | modify (e) fire alarm systemDetails
modify (e) fire alarm system | $50,000 |
| Sep 11, 2020 | Completed final sign-off Jan 2022 | 102 South Park | Pac Integrations Inc | replace old fire alarm system with new fire alarm system.Details
replace old fire alarm system with new fire alarm system. | $50,000 |
| Aug 6, 2020 | Completed final sign-off Jun 2021 | 3725 Washington St | Pac Integrations Inc | sprinkler monitoring per nfpa 13Details
sprinkler monitoring per nfpa 13 | $20,000 |
| Oct 30, 2019 | Completed final sign-off Mar 2020 | 75 Laguna St | Pac Integrations Inc | fire alarm system ti: add 10 new smoke detectors for fsds shut down, add 3 new manual pull stations and 3 new horn strobes (one exterior) on basement and first floorDetails
fire alarm system ti: add 10 new smoke detectors for fsds shut down, add 3 new manual pull stations and 3 new horn strobes (one exterior) on basement and first floor | $9,000 |
| Jun 14, 2019 | Completed final sign-off Oct 2020 | 430 Turk St | Pac Integrations Inc | connect errcs system to existing fire alarm system and provide remote annunciator for errcs system at facp.Details
connect errcs system to existing fire alarm system and provide remote annunciator for errcs system at facp. | $5,000 |
| Jun 13, 2019 | Completed final sign-off Jul 2020 | 75 Laguna St | Pac Integrations Inc | basement and 1st floor: adding fire alarm devices to existing fire alarm system at this building.Details
basement and 1st floor: adding fire alarm devices to existing fire alarm system at this building. | $20,000 |
| May 22, 2019 | Completed final sign-off May 2019 | 350 Ellis St | Pac Integrations Inc | rev to pa# 201511182921-s3; revised plans showing additional devices added during construction. 41 new devices.Details
rev to pa# 201511182921-s3; revised plans showing additional devices added during construction. 41 new devices. | $21,651 |
| Apr 17, 2019 | Completed final sign-off Sep 2019 | 230 Eddy St | Pac Integrations Inc | connecting errcs system to existing fire alarm systemDetails
connecting errcs system to existing fire alarm system | $10,000 |
| Mar 26, 2019 | Never finaled issued Mar 2019, no final | 430 Turk St | Pac Integrations Inc | as built revision to app#201812128112. equipment moved to roof level (attic space) . n/a for maherDetails
as built revision to app#201812128112. equipment moved to roof level (attic space) . n/a for maher | |
| Jan 3, 2019 | Completed final sign-off Oct 2020 | 430 Turk St | Pac Integrations Inc | adding low frequency horns to all residential units.Details
adding low frequency horns to all residential units. | $100,000 |
| Dec 12, 2018 | Never finaled issued Feb 2019, no final | 430 Turk St | Pac Integrations Inc | installation of emergency responder radio coverage system.Details
installation of emergency responder radio coverage system. | $50,000 |
| Nov 30, 2018 | Never finaled issued Nov 2018, no final | 939 Eddy St | Pac Integrations Inc | monitoring of errcs system by existing fire alarm system. errcs under appliaction 201810012808Details
monitoring of errcs system by existing fire alarm system. errcs under appliaction 201810012808 | $5,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2019 | 230 Eddy St | Pac Integrations Inc | installation of emergency responder radio coverage system.Details
installation of emergency responder radio coverage system. | $50,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 1695 18th St | Pac Integrations Inc | monitoring of 2 new duct detectors on new air unit that were installed by othersDetails
monitoring of 2 new duct detectors on new air unit that were installed by others | $3,500 |
| Aug 20, 2018 | Completed final sign-off Oct 2018 | 666 Ellis St | Pac Integrations Inc | test emergency generator supervision by the fa system only per approved reference permit pa # 2017-0919-8986 sequence of opeartion matrix. the fa contractor shall provide a copy of the approved refrence fa permit to the fire inspector at time of inspection. no new plans are provided with this permitDetails
test emergency generator supervision by the fa system only per approved reference permit pa # 2017-0919-8986 sequence of opeartion matrix. the fa contractor shall provide a copy of the approved refrence fa permit to the fire inspector at time of inspection. no new plans are provided with this permit | |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 750 33rd Av | Pac Integrations Inc | reapir and bring back to operation (e) fire alarm. replace like for like with updated equipment.Details
reapir and bring back to operation (e) fire alarm. replace like for like with updated equipment. | $6,500 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 823 Euclid Av | Pac Integrations Inc | reapir and bring back to operation (e) fire alarm control. replace facp and devices like for like with updated equipment.Details
reapir and bring back to operation (e) fire alarm control. replace facp and devices like for like with updated equipment. | $6,500 |
| Feb 7, 2018 | Completed final sign-off Mar 2018 | 666 Ellis St | Pac Integrations Inc | as buitls for fire alarm ref 201602240348Details
as buitls for fire alarm ref 201602240348 | |
| Sep 19, 2017 | Completed final sign-off Mar 2018 | 666 Ellis St | Pac Integrations Inc | as built revision to 201602240348. add low freq horns to all unints, ad additional indicating devices, add monitoring of erres, add additional smk detector in basement, mode changes to annunciator, add additional fire pump pointsDetails
as built revision to 201602240348. add low freq horns to all unints, ad additional indicating devices, add monitoring of erres, add additional smk detector in basement, mode changes to annunciator, add additional fire pump points | $103,000 |
| Apr 7, 2017 | Completed final sign-off Apr 2017 | 55 Laguna St | Pac Integrations Inc | as built per sffd ref 201306270646-s5Details
as built per sffd ref 201306270646-s5 | |
| Feb 24, 2016 | Completed final sign-off Feb 2018 | 666 Ellis St | Pac Integrations Inc | retrofit of (e) fire alarm system on a like-for-like basis. no exterior work.Details
retrofit of (e) fire alarm system on a like-for-like basis. no exterior work. | $200,000 |
| Nov 25, 2015 | Expired or cancelled withdrawn Apr 2016 | 55 Laguna St | Pac Integrations Inc | new fire alarm system, ref #201306270646Details
new fire alarm system, ref #201306270646 | $80,000 |
| Nov 18, 2015 | Completed final sign-off May 2019 | 350 Ellis St | D & H Construction, Pac Integrations Inc | accessibility upgrades, ground floor addition, office/common area, lobby renovation, storefront replacement, elevator modernization, energy & envelope improvement, unit accessibility upgrades, casework, appliances, fixtures, finishes, lighting upgrades, site improvements, n & s facade improvement.Details
accessibility upgrades, ground floor addition, office/common area, lobby renovation, storefront replacement, elevator modernization, energy & envelope improvement, unit accessibility upgrades, casework, appliances, fixtures, finishes, lighting upgrades, site improvements, n & s facade improvement. | $21,000,000 |
| Jul 6, 2015 | Completed final sign-off Jul 2020 | 95 Laguna St | James E Roberts-Obayashi Corporation, Pac Integrations Inc | to erect 6 stories, no basement, 79 units residential senior center building.Details
to erect 6 stories, no basement, 79 units residential senior center building. | $21,000,000 |
| Jul 10, 2014 | Completed final sign-off Mar 2015 | 442 Post St | Pac Integrations Inc | install firemans telephone and tie into existing fa systemDetails
install firemans telephone and tie into existing fa system | $45,000 |
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 611 02nd St | Pac Integrations Inc | replace defective fire alarm panel. no new devices have been added, riser diagram for initiating devices only.Details
replace defective fire alarm panel. no new devices have been added, riser diagram for initiating devices only. | $20,000 |
| Jun 27, 2013 | Completed final sign-off Jun 2017 | 55 Laguna St | James E Roberts-Obayashi Corporation, Pac Integrations Inc | change of occupancy and change of use of an existing historic building from a school into affordable senior housing.the grd fl incl retail space and t.i. space for a non-profit organization. the bldg is landmark #256, work was approved on 5/16/12.Details
change of occupancy and change of use of an existing historic building from a school into affordable senior housing.the grd fl incl retail space and t.i. space for a non-profit organization. the bldg is landmark #256, work was approved on 5/16/12. | $15,000,000 |
| May 8, 2012 | Never finaled issued Aug 2012, no final | 220 Cashmere St | Pac Integrations Inc | this is a voluntary manual fire alarm system consisting of 12 manual pull boxes and 12 horn strobesDetails
this is a voluntary manual fire alarm system consisting of 12 manual pull boxes and 12 horn strobes | $15,000 |
| Oct 28, 2010 | Completed final sign-off Dec 2011 | 442 Post St | Pac Integrations Inc | replacement of (e) fire alarm system on all floors. 2-way fire fighter communication system is required to be installed by may 1, 2012 on a separate permit.Details
replacement of (e) fire alarm system on all floors. 2-way fire fighter communication system is required to be installed by may 1, 2012 on a separate permit. | $25,000 |
| Jul 23, 2004 | Never finaled issued Jul 2004, no final | 300 Treat Av | Pac Integrations Inc | modification of (e)fire alarm system,deletion of duct smoke detectorsDetails
modification of (e)fire alarm system,deletion of duct smoke detectors | $900 |
| Jul 22, 2004 | Expired or cancelled expired Jan 2005 | 501 02nd St | Pac Integrations Inc | reinstall (e) speaker strobes in ceiling as requested by local ahjDetails
reinstall (e) speaker strobes in ceiling as requested by local ahj | |
| Dec 9, 2002 | Expired or cancelled expired Apr 2005 | 501 Folsom St | Pac Integrations Inc | provide sprinkler monitoring system for buildingDetails
provide sprinkler monitoring system for building | $20,000 |
| Sep 10, 2001 | Expired or cancelled expired May 2008 | 60 Federal St | Pac Integrations Inc | addendum to appl#20000120491 install addressable fire alarm control to monitor sprinkler systemDetails
addendum to appl#20000120491 install addressable fire alarm control to monitor sprinkler system |