Andrew Rodgers
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Rodgers Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to May 2026
195 permits since 2000 (architect on 186 permits, authorized agent-others on 6 permits, designer on 3 permits, engineer on 2 permits, pmt consultant/expediter on 1 permit): 92 completed, 24 in progress, 45 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 195.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2026 | In progress issued Jun 2026 | 171 Pope St | 2 Y Construction Inc. | revision 202509034490- (e) conditions require updated foundation replacmeent at soutn and east walls as shown in structural plansDetails
revision 202509034490- (e) conditions require updated foundation replacmeent at soutn and east walls as shown in structural plans | |
| May 1, 2026 | Expired or cancelled cancelled May 2026 | 1421 Shrader St | vertical addition of 3/f with interior renovations to 1/f & 2/f. 1/f (n) adu at rear and infill at lightwell (not visible from street). electrical & plumbing as required. special use district- family and senior opportunity.Details
vertical addition of 3/f with interior renovations to 1/f & 2/f. 1/f (n) adu at rear and infill at lightwell (not visible from street). electrical & plumbing as required. special use district- family and senior opportunity. | $675,000 | |
| Apr 28, 2026 | In progress issued Aug 2026 | 4174 26th St | Ewen Utting Inc. | scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck.Details
scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck. | $426,000 |
| Mar 13, 2026 | In progress filed Mar 2026, not yet issued | 1439 Oak St | Thomas Le Construction Inc | alter-site.1st fl:new 1439-b oak st with new laundry & storage. 2nd fl: renovation of (e) 1439-a oak st. renovation fo (e) 1439 oak st into new unit. 3rd fl: renovate (e) 1441 oak st into new 1441-a oak st & new 1441 oak st. 4th fl: all-new structural, mep work as required. ref 2021-002010 variance.Details
alter-site.1st fl:new 1439-b oak st with new laundry & storage. 2nd fl: renovation of (e) 1439-a oak st. renovation fo (e) 1439 oak st into new unit. 3rd fl: renovate (e) 1441 oak st into new 1441-a oak st & new 1441 oak st. 4th fl: all-new structural, mep work as required. ref 2021-002010 variance. | $527,124 |
| Feb 20, 2026 | In progress filed Feb 2026, not yet issued | 638 Rhode Island St | revision to bpa#202306139926- scope of work to include installation of (e) elec. matt in floor heating to replace to (e) elec. base board heating units, no increase to wattageDetails
revision to bpa#202306139926- scope of work to include installation of (e) elec. matt in floor heating to replace to (e) elec. base board heating units, no increase to wattage | ||
| Jan 22, 2026 | In progress issued Feb 2026 | 638 Rhode Island St | Waters And Waters | revision to pa 202302031391 scope of work to include installation of (n) electric matt in floor heating to replace (e) electric base board heating units floor heating units at the 3rd fl. no increase in wattage. no work at (e) 1st & 2nd floors, (e) roof, (e) roof, (e) front facade and rear cottageDetails
revision to pa 202302031391 scope of work to include installation of (n) electric matt in floor heating to replace (e) electric base board heating units floor heating units at the 3rd fl. no increase in wattage. no work at (e) 1st & 2nd floors, (e) roof, (e) roof, (e) front facade and rear cottage | $3,000 |
| Dec 30, 2025 | Completed final sign-off Sep 2026 | 467 Filbert St | remodel (e) bathroom, powder room and closets to include (n) primary bathroom. (n) doors, plumbing and electrical work as needed. no structural workDetails
remodel (e) bathroom, powder room and closets to include (n) primary bathroom. (n) doors, plumbing and electrical work as needed. no structural work | $68,000 | |
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 638 Rhode Island St | Waters And Waters | new retaining wall to be reflected on west side of exterior stairs at the rear of the property. not to comply with nov #202290972. nov to be addressed under sepeated permit.Details
new retaining wall to be reflected on west side of exterior stairs at the rear of the property. not to comply with nov #202290972. nov to be addressed under sepeated permit. | $5,000 |
| Sep 3, 2025 | In progress issued Jan 2026 | 171 Pope St | remodel of 1st and 2nd floor to include two (n)bathrooms, one remodeled bathroom, (n)laundry, (n)bedroom and media room. new interior stairs. (n)skylights above 1st floor stair and 2nd floor bathrooms. alteration of front facade windows to 2nd floor only. mep defered. add 408 sq ft conditioned spaceDetails
remodel of 1st and 2nd floor to include two (n)bathrooms, one remodeled bathroom, (n)laundry, (n)bedroom and media room. new interior stairs. (n)skylights above 1st floor stair and 2nd floor bathrooms. alteration of front facade windows to 2nd floor only. mep defered. add 408 sq ft conditioned space | $282,000 | |
| Apr 16, 2025 | In progress issued Apr 2025 | 145 Jefferson St | revision to pa# 202504083967, revised ocupancy load calculations.Details
revision to pa# 202504083967, revised ocupancy load calculations. | ||
| Apr 8, 2025 | In progress issued Apr 2025 | 145 Jefferson St | 2nd/f t.i. cosmetic work only. no construction. patch & paint as neccessary. install casework & display case for museum of failures. new bathroom signage & ada compliant soap dispenser to satisfy ada upgrade. e) light, mrch & sprinkler remain as-is. no change in use, no structural, & exterior workDetails
2nd/f t.i. cosmetic work only. no construction. patch & paint as neccessary. install casework & display case for museum of failures. new bathroom signage & ada compliant soap dispenser to satisfy ada upgrade. e) light, mrch & sprinkler remain as-is. no change in use, no structural, & exterior work | $7,500 | |
| Apr 3, 2025 | In progress issued Apr 2025 | 145 Jefferson St | ti: patch and paint as necessary. installation of slat walls, casework, and display cases for merchandise display. no structural, (e) lighting, mech, and sprinklers to remain as-is. no change of use. new entry doors to satisfy the new ada requirements.Details
ti: patch and paint as necessary. installation of slat walls, casework, and display cases for merchandise display. no structural, (e) lighting, mech, and sprinklers to remain as-is. no change of use. new entry doors to satisfy the new ada requirements. | $20,000 | |
| Mar 11, 2025 | In progress issued Jul 2025 | 638 Rhode Island St | Waters And Waters | (n) exterior deck, (n) exterior stair to (n) 3rd fl deck, (n) roof deck, (n) spiral stair to (n) roof deck, (n) window and (n) door at 3rd fl. ref pa# 2023-0203-1391 for additional scope of work to 3rd fl.Details
(n) exterior deck, (n) exterior stair to (n) 3rd fl deck, (n) roof deck, (n) spiral stair to (n) roof deck, (n) window and (n) door at 3rd fl. ref pa# 2023-0203-1391 for additional scope of work to 3rd fl. | $68,000 |
| Oct 28, 2024 | In progress issued Feb 2025 | 442 Noe St | Hillside General Contracting | remodel project to consist of enclose south lightwell at first floor, remove (e) scullery/pantry and replace with (n) bathroom and skylight. add 30 in parapet at skylight; add (n) bedroom within (e) footprint at 442 noe. remodel kitchen within (e) footprint and replace 1 (e) window and add 1 (n)Details
remodel project to consist of enclose south lightwell at first floor, remove (e) scullery/pantry and replace with (n) bathroom and skylight. add 30 in parapet at skylight; add (n) bedroom within (e) footprint at 442 noe. remodel kitchen within (e) footprint and replace 1 (e) window and add 1 (n) | $108,000 |
| Sep 4, 2024 | In progress issued Oct 2024 | 2217 Scott St | unit #402 - renovation of existing penthouse study to include: (n) bathroom, (n) exterior windows to north, south, east and west facade, (n) electrical & plumbing work as required. no structural work. not visable from streetDetails
unit #402 - renovation of existing penthouse study to include: (n) bathroom, (n) exterior windows to north, south, east and west facade, (n) electrical & plumbing work as required. no structural work. not visable from street | $54,000 | |
| May 28, 2024 | Completed final sign-off Sep 2024 | 28 Ashbury St | revision to pa #202205275191 reduce scope. remove full bathroom from plan on 2nd flDetails
revision to pa #202205275191 reduce scope. remove full bathroom from plan on 2nd fl | ||
| May 1, 2024 | In progress filed May 2024, not yet issued | 1042 Filbert St | proposed roof deck & new stairs, penthouse for use by upper level (3rd flr) unit only, minor bathroom alteration within unit.Details
proposed roof deck & new stairs, penthouse for use by upper level (3rd flr) unit only, minor bathroom alteration within unit. | $78,000 | |
| Apr 22, 2024 | In progress issued May 2024 | 638 Rhode Island St | revision to pa#202209162645: (ref nov# 202313020) - to include window opening modifications on 1st and 2nd floor, exterior plywood and siding replacement, rebuild walk where necessary in kind. (n) exterior stair to 2nd floor at rear of property, (n) exterior stair from grade to 1/f, (n) structural..Details
revision to pa#202209162645: (ref nov# 202313020) - to include window opening modifications on 1st and 2nd floor, exterior plywood and siding replacement, rebuild walk where necessary in kind. (n) exterior stair to 2nd floor at rear of property, (n) exterior stair from grade to 1/f, (n) structural.. | ||
| Mar 21, 2024 | Completed final sign-off Jul 2024 | 1212 Union St | revision 202011108615 to include interior remodel to unit 1 to include (n) interior wall next to stairs, replacing (4) windows within the same opening. unit 2 remodel to include replacing windows in kind at the rear of property. replace window on thrid floor and infilling (e) window. add (n) office,Details
revision 202011108615 to include interior remodel to unit 1 to include (n) interior wall next to stairs, replacing (4) windows within the same opening. unit 2 remodel to include replacing windows in kind at the rear of property. replace window on thrid floor and infilling (e) window. add (n) office, | $5,000 | |
| Mar 4, 2024 | Completed final sign-off Apr 2024 | 2266 Union St | to comply with nov 20249406 remove roof leak into storage room water rain leak sheet rock repair insulation as needed. renovation to (e) bathroom, ada improvements such as (n) grabbars, (n) sink, (n) toilet, (n) 1 hr rated wall.Details
to comply with nov 20249406 remove roof leak into storage room water rain leak sheet rock repair insulation as needed. renovation to (e) bathroom, ada improvements such as (n) grabbars, (n) sink, (n) toilet, (n) 1 hr rated wall. | $5,500 | |
| Nov 30, 2023 | In progress filed Nov 2023, not yet issued | 285 Moncada Wy | replace existing detached garage at rear of property with (n) detached garage and adu above. includes one kitchen, one bath, elec, plumb, and structural as required for above scopeDetails
replace existing detached garage at rear of property with (n) detached garage and adu above. includes one kitchen, one bath, elec, plumb, and structural as required for above scope | $250,000 | |
| Nov 30, 2023 | In progress filed Nov 2023, not yet issued | 285 Moncada Wy | demolish type-5 rear garage structureDetails
demolish type-5 rear garage structure | $7,800 | |
| Nov 8, 2023 | Completed final sign-off Nov 2023 | 214 09th Av | Yefa Construction Inc | add 2 skylights, 2 30" height fire-rated parapets at property line, and one 42" height wall at existing roof deck. all changes are revisions made to previously approved bpa 201903266261Details
add 2 skylights, 2 30" height fire-rated parapets at property line, and one 42" height wall at existing roof deck. all changes are revisions made to previously approved bpa 201903266261 | $5,000 |
| Nov 3, 2023 | In progress issued Feb 2025 | 763 Kansas St | Andrew Gallagher Construction | 3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot.Details
3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot. | $540,000 |
| Sep 5, 2023 | In progress issued Feb 2024 | 780 Kansas St | Proper Home Inc. | revision to pa 201802211876. 3rd, 4th fl and roof deck to include reconfiguration of: 3rd fl plan with removal of lightwell. 4th fl plan w(n) exterior stair up to roof deck. roof deck with (n) exterior stair.Details
revision to pa 201802211876. 3rd, 4th fl and roof deck to include reconfiguration of: 3rd fl plan with removal of lightwell. 4th fl plan w(n) exterior stair up to roof deck. roof deck with (n) exterior stair. | |
| Jul 28, 2023 | In progress issued Jun 2024 | 42 Homestead St | rev pa# 201308124073. scope of work is the same except for some interior floor plan updates with no change to the building envelope.Details
rev pa# 201308124073. scope of work is the same except for some interior floor plan updates with no change to the building envelope. | ||
| Jun 13, 2023 | In progress issued May 2025 | 638 Rhode Island St | Waters And Waters | rear cottage: renovation of (e) 2-story rear cottage. 1st fl: new bathroom, bedrrom and study. 2nd fl: new kitchen and living room new exterior balcony @ 2nd floor. new structural, electrical, and plumbing as required.Details
rear cottage: renovation of (e) 2-story rear cottage. 1st fl: new bathroom, bedrrom and study. 2nd fl: new kitchen and living room new exterior balcony @ 2nd floor. new structural, electrical, and plumbing as required. | $94,000 |
| Apr 18, 2023 | Never finaled filed Apr 2023, never issued | 1449 Lake St | scope of work include alterations to front, rear and side elevations. interior renovations to 1st and 2nd flr w/ addition of a 3rd flr and roof deck. new electrical and plumbing work as required by the above scope.Details
scope of work include alterations to front, rear and side elevations. interior renovations to 1st and 2nd flr w/ addition of a 3rd flr and roof deck. new electrical and plumbing work as required by the above scope. | $910,000 | |
| Feb 3, 2023 | In progress issued Jun 2024 | 638 Rhode Island St | Waters And Waters | legalization of 3rd unit under ord 43-14 to include: 1 bedroom, 1 baths, living room, dining room, kitchen & laundry.(n) structural, electrical, plumbing as req.replacement of (e) west egres stairs. ref legalization pa on sheet a0.01.Details
legalization of 3rd unit under ord 43-14 to include: 1 bedroom, 1 baths, living room, dining room, kitchen & laundry.(n) structural, electrical, plumbing as req.replacement of (e) west egres stairs. ref legalization pa on sheet a0.01. | $182,000 |
| Nov 14, 2022 | Completed final sign-off Nov 2022 | 4120 22nd St | revision to 200904136175 show 9 skylights per plan in total.Details
revision to 200904136175 show 9 skylights per plan in total. | $12,000 | |
| Nov 2, 2022 | Never finaled filed Nov 2022, never issued | 730 Shrader St | subject property to recieve (n) garage door and (n) egress door. no work to be done to 1st, 2nd, 3rd or attic levels.Details
subject property to recieve (n) garage door and (n) egress door. no work to be done to 1st, 2nd, 3rd or attic levels. | $104,000 | |
| Oct 7, 2022 | Expired or cancelled withdrawn Oct 2022 | 150 Yerba Buena Av | Groundbreaking Landscapes | revision to permit 202201246543 due to design change, which moved proposed patio location, and lessen retaining wall heights, and complexity.Details
revision to permit 202201246543 due to design change, which moved proposed patio location, and lessen retaining wall heights, and complexity. | $25,000 |
| Sep 16, 2022 | Never finaled issued Apr 2023, no final | 638 Rhode Island St | Waters And Waters | renovation/recofiguration of (e) 4 units: (4) new bathrooms, kitchens, laudry and bedrooms on fl 1-2. renovation/recofifurarion comply w/complaint 201524471 & 202209972. no work @ (e) roof and (e) rear yard cottage. areas shown for ref only.Details
renovation/recofiguration of (e) 4 units: (4) new bathrooms, kitchens, laudry and bedrooms on fl 1-2. renovation/recofifurarion comply w/complaint 201524471 & 202209972. no work @ (e) roof and (e) rear yard cottage. areas shown for ref only. | $510,000 |
| Aug 11, 2022 | Expired or cancelled expired Sep 2024 | 21 Lapidge St | unit #1 & unit #5: alteration of kitchens and bathrooms in 1st level and 4th fl. no structural/ exteior workDetails
unit #1 & unit #5: alteration of kitchens and bathrooms in 1st level and 4th fl. no structural/ exteior work | $60,000 | |
| Jul 25, 2022 | Expired or cancelled expired Sep 2024 | 21 Lapidge St | comply with nov 202291615.unit 3: remove wall at kitchen, 2nd fl. no structural work. no exterior work. elec, plumb as required ref appl 202206065717Details
comply with nov 202291615.unit 3: remove wall at kitchen, 2nd fl. no structural work. no exterior work. elec, plumb as required ref appl 202206065717 | $30,000 | |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 787 Wisconsin St | rev to pa 202110251141 no work at (e) garage, (e) 1st floor, (e) 2nd floor, (e) 3rd floor. reconfiguration of previously approved skylights at roof deck to include (n) 36" curb height. (n) sink and counter at (e) roof deck.Details
rev to pa 202110251141 no work at (e) garage, (e) 1st floor, (e) 2nd floor, (e) 3rd floor. reconfiguration of previously approved skylights at roof deck to include (n) 36" curb height. (n) sink and counter at (e) roof deck. | $16,000 | |
| May 31, 2022 | In progress issued Apr 2025 | 1212 Union St | expansion of 3rd floor towards the south property line w/ (n) stair to roof. project to include an alteration of the facade @ 3rd level only. new windows, doors, electrical & plumbing work as required for the above scope.Details
expansion of 3rd floor towards the south property line w/ (n) stair to roof. project to include an alteration of the facade @ 3rd level only. new windows, doors, electrical & plumbing work as required for the above scope. | $230,000 | |
| May 27, 2022 | Completed final sign-off Sep 2024 | 28 Ashbury St | Deleon Builders Inc | interior reno: 1st and 3rd flr:1st flr (n) conditioned exercise/storage space within (e) bldg envelope. 3rd flr: reconfigure (e) entry closetm renovate (e) hall bathroom, kitchen, master closet and master bathroom, replacement windows at rear, replace (e) double hung units w/ (n) casementDetails
interior reno: 1st and 3rd flr:1st flr (n) conditioned exercise/storage space within (e) bldg envelope. 3rd flr: reconfigure (e) entry closetm renovate (e) hall bathroom, kitchen, master closet and master bathroom, replacement windows at rear, replace (e) double hung units w/ (n) casement | $118,000 |
| Feb 17, 2022 | Never finaled filed Feb 2022, never issued | 3043 22nd St | 4th floor north horizontal expansion of 7'-0", remodel of (e) 4th floor kitchen, living area, 1/2 bath, (n) skylights, (n) ext. pergola @ south deck. (n) structural, electrical and plumbing as needed.Details
4th floor north horizontal expansion of 7'-0", remodel of (e) 4th floor kitchen, living area, 1/2 bath, (n) skylights, (n) ext. pergola @ south deck. (n) structural, electrical and plumbing as needed. | $156,000 | |
| Jan 24, 2022 | Expired or cancelled cancelled Nov 2022 | 150 Yerba Buena Av | Groundbreaking Landscapes | new retaining walls and landscaping at rear yard.Details
new retaining walls and landscaping at rear yard. | $26,200 |
| Dec 23, 2021 | Never finaled issued Feb 2022, no final | 147 Fillmore St | remodel work to superced bpa#202103025669,and comply with nov#202177213 & complaint#20217150. g/f:structural work for (n)beams above units 145 & 147. (n)strutural beams,remodeld kitchen,4/2 bath,3/4 bath,(n)mbr,bath & closets.Details
remodel work to superced bpa#202103025669,and comply with nov#202177213 & complaint#20217150. g/f:structural work for (n)beams above units 145 & 147. (n)strutural beams,remodeld kitchen,4/2 bath,3/4 bath,(n)mbr,bath & closets. | $120,000 | |
| Nov 3, 2021 | Completed final sign-off Jul 2022 | 230 24th Av | Yefa Construction Inc | revision to pa# 201904309351. reconfigure 4th fl south elevation property line windows from 3 to 4.Details
revision to pa# 201904309351. reconfigure 4th fl south elevation property line windows from 3 to 4. | $7,800 |
| Oct 25, 2021 | Never finaled issued Jun 2022, no final | 787 Wisconsin St | revision to pa 2021-0212-4586 increast ht of 3rd fl ceiling w/new ceiling joists; (n) interior stair to roof & (n) roof hatch/ penthouse for access re pv installation & maintenance. comply with 20212172003Details
revision to pa 2021-0212-4586 increast ht of 3rd fl ceiling w/new ceiling joists; (n) interior stair to roof & (n) roof hatch/ penthouse for access re pv installation & maintenance. comply with 20212172003 | $38,500 | |
| Sep 14, 2021 | Never finaled issued Jun 2022, no final | 345 10th Av | renovation of e 1/f unconditioned space including e garage, utility, laundry, storage & bedrm. in conditioned n bathrm, laundry, hall, 2 n bedrms, 1 master bedrm w/closet & bath, & n patio. relocate e stairs from 1/f to 2/f. n ext. stair from rear yard to renovated kitch on 2/f. renovate portion ofDetails
renovation of e 1/f unconditioned space including e garage, utility, laundry, storage & bedrm. in conditioned n bathrm, laundry, hall, 2 n bedrms, 1 master bedrm w/closet & bath, & n patio. relocate e stairs from 1/f to 2/f. n ext. stair from rear yard to renovated kitch on 2/f. renovate portion of | $208,000 | |
| Jun 1, 2021 | Completed final sign-off Dec 2021 | 4309 20th St | Armour Construction | replacement of (e) guardrail at entry stair and 1/f. north patio. (n) in-swing gate at sidewalk.relace (e) stone surface at (e) stair and patio.Details
replacement of (e) guardrail at entry stair and 1/f. north patio. (n) in-swing gate at sidewalk.relace (e) stone surface at (e) stair and patio. | $20,400 |
| Apr 19, 2021 | Never finaled filed Apr 2021, never issued | 48 Peralta Av | site. rev 201908098430. infill at front entry.(n) bay windws over (n) garage dr. (n) casment windw abv (n) entry dr. (n) cement plast & vert wd clad at frnt facade.(n) int stair, reconfig din rm-bath-bedrm at l2.(n) rf deck,2 skylts on (e) flat rf w/ guardrail & (n) ext stair.(n) firewallDetails
site. rev 201908098430. infill at front entry.(n) bay windws over (n) garage dr. (n) casment windw abv (n) entry dr. (n) cement plast & vert wd clad at frnt facade.(n) int stair, reconfig din rm-bath-bedrm at l2.(n) rf deck,2 skylts on (e) flat rf w/ guardrail & (n) ext stair.(n) firewall | $186,000 | |
| Mar 17, 2021 | In progress issued Nov 2023 | 31 Belmont Av | horizontal expansion & remodel of 2nd fl kitch & bath. remodel 2 baths. (n) 3rd flr bath. (n) roof frame. (n) windows & doors. foundation work. voluntary seismic. new slab on 1st flr. replace entry stair brick in-kind. (n) int stair. remodel 1st flr bath, bed, laundry, storage spaceDetails
horizontal expansion & remodel of 2nd fl kitch & bath. remodel 2 baths. (n) 3rd flr bath. (n) roof frame. (n) windows & doors. foundation work. voluntary seismic. new slab on 1st flr. replace entry stair brick in-kind. (n) int stair. remodel 1st flr bath, bed, laundry, storage space | $355,000 | |
| Feb 23, 2021 | Never finaled issued Sep 2021, no final | 735 Victoria St | Deasy Builders Inc | 1st fl renovate unconditioned space into wine storage, laundry, 3 bedrooms, 2 bathrooms & storage/utility. 2nd fl relocate stair, renovate 3 bedrooms, kitchen into master suite, bedroom & bath. new kitchen layout. new office/nursey. rear yard new pergola. new eleectrical/plumbing as required.Details
1st fl renovate unconditioned space into wine storage, laundry, 3 bedrooms, 2 bathrooms & storage/utility. 2nd fl relocate stair, renovate 3 bedrooms, kitchen into master suite, bedroom & bath. new kitchen layout. new office/nursey. rear yard new pergola. new eleectrical/plumbing as required. | $344,000 |
| Feb 12, 2021 | Never finaled issued May 2021, no final | 787 Wisconsin St | Waters And Waters | 2nd fl: reconfiguration of (e) closets in front bedrooms w/ new master bath. renovation of (e) kitchen, (e) bath, (e) pantry and (e) living area. no work/change to exterior walls, facade. electrical and plumbing work as required. rear yard work under separate permit.Details
2nd fl: reconfiguration of (e) closets in front bedrooms w/ new master bath. renovation of (e) kitchen, (e) bath, (e) pantry and (e) living area. no work/change to exterior walls, facade. electrical and plumbing work as required. rear yard work under separate permit. | $77,000 |
| Feb 12, 2021 | Never finaled issued Jul 2021, no final | 787 Wisconsin St | at 1st level, rear yard (n) wood deck to replace (e). (n) level grading with (n) 6' wood privacy fence at eastern property line.Details
at 1st level, rear yard (n) wood deck to replace (e). (n) level grading with (n) 6' wood privacy fence at eastern property line. | $22,700 | |
| Jan 12, 2021 | In progress issued Aug 2024 | 1439 Oak St | Thomas Le Construction Inc | remodel 2nd & 3rd floors: unit #1 - (n) bedroom & remodel kitchen; unit #2 - (n) kitchen and (n) bathroom, (n) windows at kitchen & bathroom; reconfigure unit #3 into (n) unit #3 and #4 - unit #3 - 2 (n) bedrooms, (n) bath, (n) laundry, (n) kitchen; unit #4 - 2 (n) bedrooms, (n) bath, (n) kitchen;Details
remodel 2nd & 3rd floors: unit #1 - (n) bedroom & remodel kitchen; unit #2 - (n) kitchen and (n) bathroom, (n) windows at kitchen & bathroom; reconfigure unit #3 into (n) unit #3 and #4 - unit #3 - 2 (n) bedrooms, (n) bath, (n) laundry, (n) kitchen; unit #4 - 2 (n) bedrooms, (n) bath, (n) kitchen; | $400,000 |
| Dec 23, 2020 | Completed final sign-off Jul 2024 | 403 28th St | Hive Builds Inc. | ref pa# 201810123136 & nov # 2020066271. install new concrete stem wall & sister (e) wall framing at ground level east elevation due to failing (e) condition. to meet building codes & structurally sound for occupancy. inclusion of a 2nd unit on ground floor per 2021-000342cua.Details
ref pa# 201810123136 & nov # 2020066271. install new concrete stem wall & sister (e) wall framing at ground level east elevation due to failing (e) condition. to meet building codes & structurally sound for occupancy. inclusion of a 2nd unit on ground floor per 2021-000342cua. | $20,000 |
| Nov 24, 2020 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | new garage door in (e) opening. new entrydoor w/ new side lites w/ low-e, double glazing to replace failing (e) single glazed door and side lites. new doors will be the same size. add first floor fire barrier wall, door to create an elevator lobby.Details
new garage door in (e) opening. new entrydoor w/ new side lites w/ low-e, double glazing to replace failing (e) single glazed door and side lites. new doors will be the same size. add first floor fire barrier wall, door to create an elevator lobby. | $13,600 |
| Nov 12, 2020 | Never finaled filed Nov 2020, never issued | 31 Belmont Av | A J O Group Build Inc | replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade.Details
replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade. | $110,000 |
| Nov 5, 2020 | Completed final sign-off Apr 2021 | 549 28th St | Dcs Plumbing Llc, A To Z Building | renovation of master bathroom at level 2. renovation of kitchen at level 3. electrical & plumbing work as required. no expension of building envelope. add wetbar at 3/f dining area.Details
renovation of master bathroom at level 2. renovation of kitchen at level 3. electrical & plumbing work as required. no expension of building envelope. add wetbar at 3/f dining area. | $52,000 |
| Oct 23, 2020 | Never finaled issued Apr 2021, no final | 75 Buena Vista Tr | Hive Builds Inc. | new facade windows, new horizontal wood siding, new ext. casing, new entry awning and p|l wall to replace (e) (same dimensions), planter and driveway surface.Details
new facade windows, new horizontal wood siding, new ext. casing, new entry awning and p|l wall to replace (e) (same dimensions), planter and driveway surface. | $42,000 |
| Oct 17, 2020 | Never finaled issued Feb 2021, no final | 43 Everson St | Saturn Construction Co | exterior windows & skylights. east & west elevations to be reconfigured and remove 1 wndw. west elev: new window, new skylights on roof. ref pa201601278097/202007210540.Details
exterior windows & skylights. east & west elevations to be reconfigured and remove 1 wndw. west elev: new window, new skylights on roof. ref pa201601278097/202007210540. | $4,000 |
| Sep 24, 2020 | Never finaled issued Jun 2023, no final | 2605 Post St | remodel to consist of vertical addition with flat roof, new third floor (north) balcony, 3 new bedrooms, 2 new baths, new interior stair. remodel to include master bath and closet, second floor rear yard deck. new windows and doors, plumbing and electrical work as needed.Details
remodel to consist of vertical addition with flat roof, new third floor (north) balcony, 3 new bedrooms, 2 new baths, new interior stair. remodel to include master bath and closet, second floor rear yard deck. new windows and doors, plumbing and electrical work as needed. | $264,000 | |
| Sep 23, 2020 | Never finaled filed Sep 2020, never issued | 48 Peralta Av | (n) in-fill living space under (e) deck at basement level, to include: (n) study with new framing, door, windows, insulation and drywall work as required.Details
(n) in-fill living space under (e) deck at basement level, to include: (n) study with new framing, door, windows, insulation and drywall work as required. | $55,000 | |
| Aug 10, 2020 | Completed final sign-off Jul 2023 | 311 Jersey St | Andrew Gallagher Construction | vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd.Details
vertical addition to include a roof deck above and a stair penthouse structure for access. no alteration of front facade.project to include new interior stair, 3 bedrooms + 2 bathrooms @ new 2nd floor, & remodeled laundry area @ 1st floor.new windows, doors, electrical / enwork as req'd. | $288,000 |
| Jul 21, 2020 | Never finaled issued Sep 2020, no final | 43 Everson St | Saturn Construction Co | interior remodel (n) living room, (n) bedroom, and (n) interior stair within (e) building envelope, electrical and plumbing work as required, remodel is related to wokr aproved under permit 201601278097Details
interior remodel (n) living room, (n) bedroom, and (n) interior stair within (e) building envelope, electrical and plumbing work as required, remodel is related to wokr aproved under permit 201601278097 | $160,000 |
| Jun 6, 2020 | Expired or cancelled cancelled Feb 2025 | 2605 Post St | creation of new second residential unit within the existing building envelope on the ground level, (n) windows and doors, electrical and plumbing work as needed.Details
creation of new second residential unit within the existing building envelope on the ground level, (n) windows and doors, electrical and plumbing work as needed. | $92,000 | |
| Mar 4, 2020 | Expired or cancelled cancelled Jan 2026 | 470 Alvarado St | new stair from 3rd fl to roof, at interior, new roof deck over 3 fl at north rear side of building. new operable roof hatch for access to new roof deck. structural work as reqDetails
new stair from 3rd fl to roof, at interior, new roof deck over 3 fl at north rear side of building. new operable roof hatch for access to new roof deck. structural work as req | $88,000 | |
| Feb 10, 2020 | Completed final sign-off Nov 2023 | 3016 22nd Av | James Garcia Construction | 10'-0" horizontal addition at grd level & 10'-11" horizontal addition at 2nd level. reconfiguration of living spaces - including (n) laundry room @ grd level & (n) dining area & (n) pantry @ 2nd level. plumbing, eletrical & structural as reqd.Details
10'-0" horizontal addition at grd level & 10'-11" horizontal addition at 2nd level. reconfiguration of living spaces - including (n) laundry room @ grd level & (n) dining area & (n) pantry @ 2nd level. plumbing, eletrical & structural as reqd. | $220,000 |
| Dec 3, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | Innovative Construction Implement | ref variance 2020-003283var 10/2/2020: lower level: excavation under (e) deck for (n) bedroom,closet,bathroom & office.2/f:renovate (e) bath and closet,add (n) laundry,replace doors to (e) bedrooms, add 3 skylights in (e) hall. electrical and plumbing work as req. rev to pa201903014213.Details
ref variance 2020-003283var 10/2/2020: lower level: excavation under (e) deck for (n) bedroom,closet,bathroom & office.2/f:renovate (e) bath and closet,add (n) laundry,replace doors to (e) bedrooms, add 3 skylights in (e) hall. electrical and plumbing work as req. rev to pa201903014213. | $47,500 |
| Nov 13, 2019 | Expired or cancelled withdrawn Jan 2023 | 3975 19th St | Devlin/Mcnally Construction | otc application for the creation of a modest shed dormer to upper roof, as related to approved permit #201903256158.Details
otc application for the creation of a modest shed dormer to upper roof, as related to approved permit #201903256158. | $2,800 |
| Oct 28, 2019 | Expired or cancelled cancelled Jan 2026 | 3733 20th St | (n) garage with (n) curb cut & driveway. excercise rm, bathroom & media room behind garage at ground level. (n) deck & guardrail on top of garage. reference to approved variance app #2018-008528var.Details
(n) garage with (n) curb cut & driveway. excercise rm, bathroom & media room behind garage at ground level. (n) deck & guardrail on top of garage. reference to approved variance app #2018-008528var. | $310,000 | |
| Oct 11, 2019 | Completed final sign-off Jan 2021 | 230 24th Av | Hing Wah Construction Inc | new brick facade on ground floor (west elevation) to include framed openings for the garage & front door entry in response to enforcement action 2019-01451enf. related to pa# 2019/04/30/9351. ** maher: n/a **Details
new brick facade on ground floor (west elevation) to include framed openings for the garage & front door entry in response to enforcement action 2019-01451enf. related to pa# 2019/04/30/9351. ** maher: n/a ** | $13,000 |
| Sep 23, 2019 | Expired or cancelled withdrawn Jun 2021 | 230 24th Av | new brick facade on ground floor, to include framed (non structural) garage and entry opening) in response to enforcement # 201901451enf.Details
new brick facade on ground floor, to include framed (non structural) garage and entry opening) in response to enforcement # 201901451enf. | $7,500 | |
| Sep 6, 2019 | Never finaled issued Dec 2021, no final | 36 Mirabel Av | vertical addition. remodel 1st floor kitchen, bathroom, (n) interior stair,(n) 2nd floor level with 3 bedrooms and 2 bathrooms and deck, new roof deckDetails
vertical addition. remodel 1st floor kitchen, bathroom, (n) interior stair,(n) 2nd floor level with 3 bedrooms and 2 bathrooms and deck, new roof deck | $260,000 | |
| Aug 9, 2019 | Expired or cancelled withdrawn Nov 2019 | 75 Buena Vista Tr | new facade for upper 2 floors of 3 story house, to include new windows and new horizontal wood siding. n/a for maherDetails
new facade for upper 2 floors of 3 story house, to include new windows and new horizontal wood siding. n/a for maher | $48,000 | |
| Aug 9, 2019 | Expired or cancelled withdrawn Jun 2022 | 48 Peralta Av | site permit app for a new roof deck to include a new spiral stair from existing deck and firewall adjacent to the stairs.Details
site permit app for a new roof deck to include a new spiral stair from existing deck and firewall adjacent to the stairs. | $77,500 | |
| Jul 19, 2019 | Completed final sign-off Jul 2019 | 2 Everson St | Saturn Construction Co | rev to pa# 201802211886; delete motorized skylight scope from permitDetails
rev to pa# 201802211886; delete motorized skylight scope from permit | |
| Jun 21, 2019 | Expired or cancelled suspend Nov 2019 | 2828 Octavia St | Hive Builds Inc. | new full bathroom in 3rd fl bedroom. ref pa #201707252933. no change to bldg envelope.Details
new full bathroom in 3rd fl bedroom. ref pa #201707252933. no change to bldg envelope. | $18,500 |
| May 1, 2019 | Completed final sign-off Sep 2020 | 4307 20th St | Narrowback Construction Co., Ace Drilling & Excavation | new rear yard retaining wall, concrete stairs @ grade and guardrailDetails
new rear yard retaining wall, concrete stairs @ grade and guardrail | $22,600 |
| Apr 30, 2019 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | enclose an approved flat roofed exterior 4th level deck to include 1 new door & 1 new window. ** maher: n/a **Details
enclose an approved flat roofed exterior 4th level deck to include 1 new door & 1 new window. ** maher: n/a ** | $16,500 |
| Apr 26, 2019 | Completed final sign-off May 2021 | 1326 Dolores St | Narrowback Construction Co. | renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as neededDetails
renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as needed | $129,000 |
| Apr 12, 2019 | Never finaled issued Jul 2020, no final | 1718 Hyde St | A J O Group Build Inc | two adu @ grd flr per ord# 162-16 - convert (e) storage & mechnical rm into habitable space. remove interior stair and add (n) exterior stair. adu.1- 3 bed, 2 bath, kitchen & living rm. adu.2- 1 bed, 1 bath, kitchen, dining rm & living rm. (n) elect.Details
two adu @ grd flr per ord# 162-16 - convert (e) storage & mechnical rm into habitable space. remove interior stair and add (n) exterior stair. adu.1- 3 bed, 2 bath, kitchen & living rm. adu.2- 1 bed, 1 bath, kitchen, dining rm & living rm. (n) elect. | $280,000 |
| Mar 25, 2019 | Completed final sign-off Feb 2023 | 3975 19th St | Devlin/Mcnally Construction | (n) roof deck, (n) interior stair & sliding roof hatch for access, (n) larger sliding glass doors at north elevation, (n) larger p.l. windows at east elevation. no change to bldg envelope.Details
(n) roof deck, (n) interior stair & sliding roof hatch for access, (n) larger sliding glass doors at north elevation, (n) larger p.l. windows at east elevation. no change to bldg envelope. | $126,000 |
| Oct 23, 2018 | Completed final sign-off Oct 2020 | 873 Union St | Armour Construction | ground level excavation & foundation work to create a garage & (n) living space for 1st flr unit. mep work per plan. (n) garage door & curb cut at ground leve. (n) roof deck with stairs.Details
ground level excavation & foundation work to create a garage & (n) living space for 1st flr unit. mep work per plan. (n) garage door & curb cut at ground leve. (n) roof deck with stairs. | $150,000 |
| Oct 23, 2018 | Completed final sign-off Sep 2022 | 2666 Mcallister St | unit legalization per ord 43-14. & remodel of (e) illegal ground flr apartment in 2-family residence. to include: remodeled kitchen, bathrm, (n) laundry rm/half bath, windows & doors, electrical & plumbing. add nfpa 13 automatic sprinkler system entire ground floorDetails
unit legalization per ord 43-14. & remodel of (e) illegal ground flr apartment in 2-family residence. to include: remodeled kitchen, bathrm, (n) laundry rm/half bath, windows & doors, electrical & plumbing. add nfpa 13 automatic sprinkler system entire ground floor | $52,500 | |
| Oct 12, 2018 | Completed final sign-off Jul 2024 | 403 28th St | Hive Builds Inc. | remodel of single family home to consist of horizontal extension on all 3 levels & horizontal extension on 1st floor. (n) south deck, garage, garage door & entry. remodeled kitchen, (n) windows & doors. plumbing & electrical as needed. inclusion of a second unit on ground floor per 2021-000342cuaDetails
remodel of single family home to consist of horizontal extension on all 3 levels & horizontal extension on 1st floor. (n) south deck, garage, garage door & entry. remodeled kitchen, (n) windows & doors. plumbing & electrical as needed. inclusion of a second unit on ground floor per 2021-000342cua | $440,000 |
| Oct 9, 2018 | Completed final sign-off Sep 2020 | 873 Union St | Armour Construction | interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as neededDetails
interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as needed | $288,000 |
| Jun 29, 2018 | Expired or cancelled expired Nov 2024 | 3922 Kirkham St | Advanced Design General Contractor | horizontal addition at rear of building at 1st & 2nd floor. (n) deck to the north at 2/fl. (n) kitchen, bathroom, & laundry. plumbing, electrical & structural work as req.Details
horizontal addition at rear of building at 1st & 2nd floor. (n) deck to the north at 2/fl. (n) kitchen, bathroom, & laundry. plumbing, electrical & structural work as req. | $125,000 |
| May 22, 2018 | Completed final sign-off Jun 2020 | 700 Central Av | Sanchez Home Improvement | ref# 201605117147: geo-grouting permit for north side foundation of remodel projectDetails
ref# 201605117147: geo-grouting permit for north side foundation of remodel project | $5,500 |
| May 16, 2018 | Expired or cancelled withdrawn May 2019 | 873 Union St | Armour Construction | new garage, garage door & curb cut at ground level. removal of (e) facade window.Details
new garage, garage door & curb cut at ground level. removal of (e) facade window. | $55,000 |
| Apr 5, 2018 | Completed final sign-off Sep 2020 | 4307 20th St | Narrowback Construction Co. | interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspaceDetails
interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspace | $305,000 |
| Mar 23, 2018 | Expired or cancelled withdrawn Nov 2019 | 1276 Market St | reference #201512185457. change of use mcd to cannabis retail per planning code section 190.Details
reference #201512185457. change of use mcd to cannabis retail per planning code section 190. | $100,000 | |
| Mar 2, 2018 | Completed final sign-off Apr 2022 | 50 Fanning Wy | horizontal addition. (n) 1-story rear addition for (n) bathroom & partial remodel (e) bathrooms. variance app #2017-008798var.Details
horizontal addition. (n) 1-story rear addition for (n) bathroom & partial remodel (e) bathrooms. variance app #2017-008798var. | $250,000 | |
| Feb 21, 2018 | Completed final sign-off Jul 2019 | 2 Everson St | Saturn Construction Co, Hymac Construction Inc | 1/f: (n) entertainment rm below (e) living space to include (n) ext doors, (n) elec, mech & insul work. 2/f: (n) office & storage w/(n) access catwalk, below (e) living space to include (n) ext. doors & windows, (n) found, elec, mech & insul work. roof: (n) retractable skylight over e oculus.Details
1/f: (n) entertainment rm below (e) living space to include (n) ext doors, (n) elec, mech & insul work. 2/f: (n) office & storage w/(n) access catwalk, below (e) living space to include (n) ext. doors & windows, (n) found, elec, mech & insul work. roof: (n) retractable skylight over e oculus. | $165,000 |
| Feb 21, 2018 | Never finaled issued Mar 2022, no final | 780 Kansas St | Proper Home Inc. | horizontal addition. utilize allowable 12' extension @ 1st level. new deck @ 2nd level. partial change of pitched roof to flat for new roof deck & viewing platform. no chang in front facade. garage expand. remodel bathrm & living space. expand family rm. relocate & expand bath & kitchen on 2nd fl.Details
horizontal addition. utilize allowable 12' extension @ 1st level. new deck @ 2nd level. partial change of pitched roof to flat for new roof deck & viewing platform. no chang in front facade. garage expand. remodel bathrm & living space. expand family rm. relocate & expand bath & kitchen on 2nd fl. | $440,000 |
| Feb 6, 2018 | Completed final sign-off Jul 2019 | 77 Buena Vista Tr | Hive Builds Inc. | interior remodl work & (n) exterior doors @ rear (east side) of bldg. remodel ktichen & bathroom, (n) gas fire place to replace wood burning. (n) ceiling framingDetails
interior remodl work & (n) exterior doors @ rear (east side) of bldg. remodel ktichen & bathroom, (n) gas fire place to replace wood burning. (n) ceiling framing | $156,000 |
| Feb 1, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floorDetails
in-fill north light well & ktichens (2) and bathrooms, add 3 new bathrooms, replace windows in facade, (n) stucco @ ground floor. (n) mep work as needed. 2 (n) bedroom & 1.5 baths @ ground floor | $440,000 |
| Jan 29, 2018 | Completed final sign-off Jul 2022 | 230 24th Av | Hing Wah Construction Inc | horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors.Details
horizontal ext @rear (east) occupying (2) sides yards max allowable distance of 12ft beyond 45% rear yard setback for (1) story. 2nd flr deck & stair to backyard. revisions to 4th flr including remodeled bathroom, (n) kitchen, additional living space, (n) roofdeck, (n) windows & (n) doors. | $190,000 |
| Jan 16, 2018 | Completed final sign-off Aug 2020 | 651 04th Av | Hing Wah Construction Inc | site permit to remove 3-story west building wing, add 142 sq ft of ground flr living space + (n) 2nd flr deck @ west end (horizontal addition).Details
site permit to remove 3-story west building wing, add 142 sq ft of ground flr living space + (n) 2nd flr deck @ west end (horizontal addition). | $65,000 |
| Jan 5, 2018 | Completed final sign-off Jun 2020 | 700 Central Av | Sanchez Home Improvement | over the counter permit for shoring/geo grouting at 2 property line walls as part of approved permit #201605117147Details
over the counter permit for shoring/geo grouting at 2 property line walls as part of approved permit #201605117147 | $3,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 651 04th Av | Hing Wah Construction Inc | cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors.Details
cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors. | $325,000 |
| Oct 31, 2017 | Expired or cancelled cancelled Jan 2026 | 1346 Hampshire St | new sunken patio, sliding glass door and window at ground floor.Details
new sunken patio, sliding glass door and window at ground floor. | $39,600 | |
| Sep 5, 2017 | Completed final sign-off Dec 2021 | 3130 Broderick St | G. A. Delly Deigner Contractor Ltd. | add unit per ordinance no. 162-16. adu at 1st floor, convert of (e) storage & mech rm to habitable space, (n) kitchen, bath, living & 2 bedrm. at rear facade, (n) doors, windows, remove masonry chimney, elect & plumb as req'd. no change to bldg footprint.Details
add unit per ordinance no. 162-16. adu at 1st floor, convert of (e) storage & mech rm to habitable space, (n) kitchen, bath, living & 2 bedrm. at rear facade, (n) doors, windows, remove masonry chimney, elect & plumb as req'd. no change to bldg footprint. | $80,000 |
| Aug 23, 2017 | Completed final sign-off Jul 2018 | 2979 Jackson St | Linebarger Const & Plbg | new garage, garage door, curb cut, foundation work, new interior stair, remodel extg kitchen and bathroom, new plumbing and electrical as needed. ref app#207004913 env. n/a for maher. no building enlargement.Details
new garage, garage door, curb cut, foundation work, new interior stair, remodel extg kitchen and bathroom, new plumbing and electrical as needed. ref app#207004913 env. n/a for maher. no building enlargement. | $61,000 |