Block 0355, lot 009
1276 Market St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 4
- Units
- 55
- Rooms
- 24 bathrooms
- Building
- 22,310 sq ft
- Lot
- 4,996 sq ft
- Zoning
- C3G
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2024 | Completed final sign-off Jun 2024 | 1276 Market St | this is an administrative permit. no new work is proposed. updating the designation from an mcd medical cannabis dispensary article 33 to an article 16 adult use retail sales.Details
this is an administrative permit. no new work is proposed. updating the designation from an mcd medical cannabis dispensary article 33 to an article 16 adult use retail sales. | ||
| Oct 12, 2021 | Expired or cancelled cancelled Jan 2026 | 1276 Market St | Kevin Dorgan Electrical | relocate (e) window wall between (e) lobby & mechandise rm. add egress door to (e) pathway. remove & relocate approx 8'0" non-load bearing wall. relocate wall approx 4'6" into the space. flip (e) door swing @ the merchandise room to meet code req push/ pull clearances. provide additional exit door.Details
relocate (e) window wall between (e) lobby & mechandise rm. add egress door to (e) pathway. remove & relocate approx 8'0" non-load bearing wall. relocate wall approx 4'6" into the space. flip (e) door swing @ the merchandise room to meet code req push/ pull clearances. provide additional exit door. | $2,000 |
| Jun 2, 2021 | Never finaled issued Jan 2022, no final | 1276 Market St | Kevin Dorgan Electrical | revision to bpa# 2015-1218-5457 s/r1, correction of(e) suite to as-built conditons, no new work to be performed for administration purpose onlyDetails
revision to bpa# 2015-1218-5457 s/r1, correction of(e) suite to as-built conditons, no new work to be performed for administration purpose only | $5,000 |
| Nov 22, 2019 | Never finaled filed Nov 2019, never issued | 1276 Market St | change of use from existing medical cannabis dispensary to cannabis retail. no new work to be performed. for administrative purposes only.Details
change of use from existing medical cannabis dispensary to cannabis retail. no new work to be performed. for administrative purposes only. | ||
| Feb 25, 2019 | Completed final sign-off Jun 2020 | 1276 Market St | Bevilacqua & Sons | install (n) scissor gate over (e) windows on market st frontage(dispensary). install (n) colapsable security gate @ (e) vestibule on market stDetails
install (n) scissor gate over (e) windows on market st frontage(dispensary). install (n) colapsable security gate @ (e) vestibule on market st | $15,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 1276 Market St | street spaceDetails
street space | ||
| Mar 23, 2018 | Expired or cancelled withdrawn Nov 2019 | 1276 Market St | reference #201512185457. change of use mcd to cannabis retail per planning code section 190.Details
reference #201512185457. change of use mcd to cannabis retail per planning code section 190. | $100,000 | |
| Oct 16, 2017 | Completed final sign-off Nov 2018 | 1276 Market St | Serrano Fire Protection Systems | install new above ground fire sprinkler piping and sprinklers per 2016 nfpa #13 to accommodate new framing. t.i on 1st floor and basement. pa#201512185457Details
install new above ground fire sprinkler piping and sprinklers per 2016 nfpa #13 to accommodate new framing. t.i on 1st floor and basement. pa#201512185457 | $40,000 |
| Feb 28, 2017 | Never finaled issued Feb 2017, no final | 1276 Market St | street space permitDetails
street space permit | ||
| Dec 30, 2016 | Expired or cancelled withdrawn Jan 2017 | 1276 Market St | Eco Bay Services Inc. | interior renovation of basement/ground for mcd. renovation of (e) stair & addition of (1)(n) stair. (n) mechanical equip incl dumbwaiter & elevator. structural framing & 1-hr rated ceiling assembly btwn occupancies. (n)(e) opening in rear. no site work. ref mep appln #201312306300Details
interior renovation of basement/ground for mcd. renovation of (e) stair & addition of (1)(n) stair. (n) mechanical equip incl dumbwaiter & elevator. structural framing & 1-hr rated ceiling assembly btwn occupancies. (n)(e) opening in rear. no site work. ref mep appln #201312306300 | $400,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2018 | 1276 Market St | Air Perfection Heating & Air Condition | installation of the mep scope of work as shown on applicable drawings ref# 201512185457-s1r1Details
installation of the mep scope of work as shown on applicable drawings ref# 201512185457-s1r1 | $100,000 |
| Dec 6, 2016 | Completed final sign-off Dec 2018 | 1276 Market St | erect electric, wall, single faced, direct new signDetails
erect electric, wall, single faced, direct new sign | $25,000 | |
| Dec 6, 2016 | Completed final sign-off Dec 2018 | 1276 Market St | (n) facade to include (n) sign, transom windows, (n) entry door, (n) exterior casework, refinishing as needed & paint.Details
(n) facade to include (n) sign, transom windows, (n) entry door, (n) exterior casework, refinishing as needed & paint. | $25,000 | |
| Nov 18, 2016 | Completed final sign-off Dec 2016 | 1272 Market St | unit # 415: floor and window repairs as per dbi nov # 201644332, items 2,3,5. repair unit entry door. all work at unit 415.Details
unit # 415: floor and window repairs as per dbi nov # 201644332, items 2,3,5. repair unit entry door. all work at unit 415. | $1,000 | |
| Oct 13, 2016 | Expired or cancelled cancelled Jan 2026 | 1276 Market St | Eco Bay Services Inc. | demolition only removal of steel box signageDetails
demolition only removal of steel box signage | $1,500 |
| Sep 8, 2016 | Completed final sign-off Dec 2018 | 1276 Market St | Eco Bay Services Inc. | ground floor: demo only - removal of interior non structural partition . removal of interior finishes, column covers, fixtures, and plumb fixtures. no structural or exterior workwallsDetails
ground floor: demo only - removal of interior non structural partition . removal of interior finishes, column covers, fixtures, and plumb fixtures. no structural or exterior workwalls | $5,500 |
| Jun 1, 2016 | Completed final sign-off Jun 2016 | 1272 Market St | repair flooring in room 416 as requested in dbi nov 201616371.Details
repair flooring in room 416 as requested in dbi nov 201616371. | $350 | |
| Dec 18, 2015 | Completed final sign-off Dec 2018 | 1276 Market St | O M C Construction, Eco Bay Services Inc., Padraig Devlin Construction | new medical cannabis dispensary (mcd) at 1276 market st. sprinkler deferred.Details
new medical cannabis dispensary (mcd) at 1276 market st. sprinkler deferred. | $50,000 |
| Jul 23, 2014 | Completed final sign-off Jul 2014 | 1272 Market St | repair work comply with dbi notice of violation #201481561 about 24 s.f. subflooring.Details
repair work comply with dbi notice of violation #201481561 about 24 s.f. subflooring. | $500 | |
| Jun 14, 2013 | Completed final sign-off Sep 2013 | 1272 Market St | 8 grab bars on first floor, 8 grab bars on 2nd floor, and 10 grab bars on 3rd floor. all grab bars minimum load rating of 250 lbs.Details
8 grab bars on first floor, 8 grab bars on 2nd floor, and 10 grab bars on 3rd floor. all grab bars minimum load rating of 250 lbs. | $3,500 | |
| Dec 14, 2011 | Never finaled issued Dec 2011, no final | 1272 Market St | California Fire & Electric Inc | fire alarm system upgrade "phase i" plan of action letter implementation.Details
fire alarm system upgrade "phase i" plan of action letter implementation. | $12,500 |
| May 10, 2006 | Completed final sign-off May 2006 | 1272 Market St | Anthony's Roofing Co. | reroofing.Details
reroofing. | $30,000 |
| Feb 23, 2005 | Completed final sign-off Mar 2005 | 1272 Market St | Fire Protection Retrofit Specialist | renew app #200302147535/200312182568/200307119258Details
renew app #200302147535/200312182568/200307119258 | |
| Feb 10, 2005 | Completed final sign-off Jun 2005 | 1272 Market St | Bay Alarm Company | install two dact to monitor exist fire alarm control panel on 2nd flDetails
install two dact to monitor exist fire alarm control panel on 2nd fl | $868 |
| Sep 28, 2004 | Completed final sign-off Mar 2005 | 1272 Market St | Fire Protection Retrofit Specialist | install fire sprinkler system to comply with ord # 170-02. (additional for appl# 2003/07/11/9258Details
install fire sprinkler system to comply with ord # 170-02. (additional for appl# 2003/07/11/9258 | $3,850 |
| Dec 18, 2003 | Expired or cancelled expired Feb 2006 | 1272 Market St | Fire Protection Retrofit Specialist | install fire sprinkler system in basement . comply w/ord#170-02 ref:200307119258Details
install fire sprinkler system in basement . comply w/ord#170-02 ref:200307119258 | $5,000 |
| Jul 11, 2003 | Never finaled issued Sep 2003, no final | 1272 Market St | Fire Protection Retrofit Specialist | install fire sprinkler system (1/f) to comply with ordinance #172-02Details
install fire sprinkler system (1/f) to comply with ordinance #172-02 | $5,000 |
| Feb 14, 2003 | Expired or cancelled expired Feb 2006 | 1272 Market St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply w/ordinance #172-02 & comply w/nov 200233798 dtd 10/15/02Details
to install fire sprinkler system to comply w/ordinance #172-02 & comply w/nov 200233798 dtd 10/15/02 | $27,600 |
| Oct 23, 2002 | Never finaled issued Oct 2003, no final | 1276 Market St | installation of 2 omni type antennas mounted to the facade. no associated equipment proposedDetails
installation of 2 omni type antennas mounted to the facade. no associated equipment proposed | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.