Aleck Wilson
- Listed as
- architect, authorized agent-others, engineer, subcontractor
- Firm
- Aleck Wilson Architects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2003 to Sep 2026
79 permits since 2000 (architect on 76 permits, authorized agent-others on 1 permit, engineer on 1 permit, subcontractor on 1 permit): 50 completed, 4 in progress, 13 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Oct 2026 | 3633 Webster St | O'sullivan & Son Construction Inc | revision to 202604109240. existing rear deck to receive new waterproofing and wood decking. new 42" fire wall at property line edge of (e) deck. new 42" glass guardrail rear yard edge of (e) deck. revision to guardrail and handrail at lowest flight at stair 009. no plumbing.Details
revision to 202604109240. existing rear deck to receive new waterproofing and wood decking. new 42" fire wall at property line edge of (e) deck. new 42" glass guardrail rear yard edge of (e) deck. revision to guardrail and handrail at lowest flight at stair 009. no plumbing. | |
| Jun 18, 2026 | In progress issued Jul 2026 | 3633 Webster St | O'sullivan & Son Construction Inc | revision to pa# 202604109240: includes updates to windows at rear adn northern elevations, bathroom, water closets, stair guardrail, mechanical room location, rate wall adjustments, structural adjustments, condenser located on roof.Details
revision to pa# 202604109240: includes updates to windows at rear adn northern elevations, bathroom, water closets, stair guardrail, mechanical room location, rate wall adjustments, structural adjustments, condenser located on roof. | |
| Apr 10, 2026 | In progress issued Apr 2026 | 3633 Webster St | O'sullivan & Son Construction Inc | 1st fl - int'r remodel w/stair. (n) windows in (n) openings; 2nd fl - interior remodel w/stair (n) windows in (e) openings. note 1st/2nd fl kitchen and baths under pa 202512222385. 3rd fl - remodel to kitchen & (e) 2 bathrooms; no work to front facade. all windows at rear facade to be replacedDetails
1st fl - int'r remodel w/stair. (n) windows in (n) openings; 2nd fl - interior remodel w/stair (n) windows in (e) openings. note 1st/2nd fl kitchen and baths under pa 202512222385. 3rd fl - remodel to kitchen & (e) 2 bathrooms; no work to front facade. all windows at rear facade to be replaced | $195,000 |
| Oct 1, 2025 | In progress issued Feb 2026 | 3217 Baker St | Colindres & Associates | horizontal addition to barhroom on 3/f.replace window in kind at front facade. enclose (e) lightwell. new hallway & renovation of (e) family room on 1/f. renovation of (e) kitchen & bathrooms on 2/f.Details
horizontal addition to barhroom on 3/f.replace window in kind at front facade. enclose (e) lightwell. new hallway & renovation of (e) family room on 1/f. renovation of (e) kitchen & bathrooms on 2/f. | $250,655 |
| Jun 11, 2025 | Completed final sign-off Dec 2025 | 212 Divisadero St | lower level: renovation of (e) kitchen and bath. new kitchen and bath fixtures to replace existing. new lighting, electrical and exhaust fans to be installed in bath and kitchen. new window to replace (e) door in living room. new exterior door to replace (e) door in kitchen.Details
lower level: renovation of (e) kitchen and bath. new kitchen and bath fixtures to replace existing. new lighting, electrical and exhaust fans to be installed in bath and kitchen. new window to replace (e) door in living room. new exterior door to replace (e) door in kitchen. | $35,000 | |
| Jun 5, 2025 | Completed final sign-off Feb 2026 | 600 El Camino Del Mar | revision to 202402216297 to add decorative, interior, zero clearance elevator hoistway doorsDetails
revision to 202402216297 to add decorative, interior, zero clearance elevator hoistway doors | $2,500 | |
| Apr 3, 2025 | Completed final sign-off Feb 2026 | 600 El Camino Del Mar | Design Line Construction | exterior envelope change as follows, 4 windows to be replaced in kind. interior scope under sep permit. (202402216297) previous exterior envelope work under 202403298962. min. u-factor of .3.Details
exterior envelope change as follows, 4 windows to be replaced in kind. interior scope under sep permit. (202402216297) previous exterior envelope work under 202403298962. min. u-factor of .3. | $27,000 |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 2582 Clay St | O'sullivan & Son Construction Inc | revision to pa# 2024-1202-5893 revision to lower exterior deck foot print & deck foundationDetails
revision to pa# 2024-1202-5893 revision to lower exterior deck foot print & deck foundation | |
| Dec 2, 2024 | Completed final sign-off Jul 2025 | 2580 Clay St | O'sullivan & Son Construction Inc | rev 202409251547 to include demo of (e) rear deck and construction of (n) deck. replace windows within the same opening facing the side and rear. (n) opening for fire rated door between garage and interior stairway.Details
rev 202409251547 to include demo of (e) rear deck and construction of (n) deck. replace windows within the same opening facing the side and rear. (n) opening for fire rated door between garage and interior stairway. | $25,000 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 2580 Clay St | O'sullivan & Son Construction Inc | renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors toDetails
renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors to | $87,000 |
| Jun 6, 2024 | Expired or cancelled expired Mar 2026 | 13 Presidio Tr | Norman Charles Construction | flood repair and restoration in kind. mep, sheetrock, casework and paint. all work to restore repaired areas back to original state prior to flood damage. all work located at lowest floor (basement). no structural work.Details
flood repair and restoration in kind. mep, sheetrock, casework and paint. all work to restore repaired areas back to original state prior to flood damage. all work located at lowest floor (basement). no structural work. | $50,000 |
| Mar 29, 2024 | Completed final sign-off Feb 2026 | 600 El Camino Del Mar | Design Line Construction | window replacement - 9 total: x7 in-kind windows, x2 glass block windows @ lower level to be replaced w/steel frame and sash to match existing. interior remodel under separate permit 202402216297Details
window replacement - 9 total: x7 in-kind windows, x2 glass block windows @ lower level to be replaced w/steel frame and sash to match existing. interior remodel under separate permit 202402216297 | |
| Feb 21, 2024 | Completed final sign-off Feb 2026 | 600 El Camino Del Mar | Design Line Construction | renovation of (e) single family home, work includes: reno of kitchen, bathrooms (7 total), bedrooms, and living rooms. new mechanical system, electrical devices and subpanels. no exterior work under this permit.Details
renovation of (e) single family home, work includes: reno of kitchen, bathrooms (7 total), bedrooms, and living rooms. new mechanical system, electrical devices and subpanels. no exterior work under this permit. | $185,120 |
| Feb 27, 2020 | Completed final sign-off Dec 2022 | 13 Presidio Tr | Norman Charles Construction | (n) wood deck over (e) garage roof. (n) wood connecting bridge and stair between (e) garage and (e) wood deck at south west corner of (e) dwelling. (n) wood stair to rear yard at west property line. all work to (e) dwelling under separate permit. ** maher: n/a **Details
(n) wood deck over (e) garage roof. (n) wood connecting bridge and stair between (e) garage and (e) wood deck at south west corner of (e) dwelling. (n) wood stair to rear yard at west property line. all work to (e) dwelling under separate permit. ** maher: n/a ** | $75,000 |
| Feb 18, 2020 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | revision to pa 2019-0402-6871, 2019-0510-0375 & 2019-0920-2297 bathrooms moved on 2nd fl, bathroom reconfigured in basement. no change to 3 facades at rear facades previously approved windows ganged into 1 opening at basement & 1st flDetails
revision to pa 2019-0402-6871, 2019-0510-0375 & 2019-0920-2297 bathrooms moved on 2nd fl, bathroom reconfigured in basement. no change to 3 facades at rear facades previously approved windows ganged into 1 opening at basement & 1st fl | |
| Sep 20, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | revision to 201905100375 window replacement at rear elevation - demo infill 2 windows (e). new window in its placeDetails
revision to 201905100375 window replacement at rear elevation - demo infill 2 windows (e). new window in its place | $1,000 |
| May 10, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | interior renovation including non-structural partitions, relocation of bathrooms and laundry room; exterior work inlcuding replacement of wood siding, new windows and doors @ side and back facades. no work on the front facade; foundation work approved under pa 2019-0402-6871; 2nd fl - add bedroomDetails
interior renovation including non-structural partitions, relocation of bathrooms and laundry room; exterior work inlcuding replacement of wood siding, new windows and doors @ side and back facades. no work on the front facade; foundation work approved under pa 2019-0402-6871; 2nd fl - add bedroom | $100,000 |
| Apr 2, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | interior renovation and structural foundation upgrade with minor exterior work at rear facade. work to include basement expansion, foundation replacement and 2 new windows on rear facadeDetails
interior renovation and structural foundation upgrade with minor exterior work at rear facade. work to include basement expansion, foundation replacement and 2 new windows on rear facade | $227,000 |
| Sep 24, 2018 | Completed final sign-off Jun 2019 | 3947 Washington St | Dijeau Poage Construction Inc. | revision to pa 201801037795. interior stair change from wood to steel. maher n/aDetails
revision to pa 201801037795. interior stair change from wood to steel. maher n/a | |
| Jan 3, 2018 | Completed final sign-off Jun 2019 | 3947 Washington St | Dijeau Poage Construction Inc. | revision to approved pa #201608185425 r1. to include rooms on levels 1-3. window replacement in kind. update retraining wall height at rear. mep to correspond w/title 24 calculations. maher naDetails
revision to approved pa #201608185425 r1. to include rooms on levels 1-3. window replacement in kind. update retraining wall height at rear. mep to correspond w/title 24 calculations. maher na | |
| Mar 21, 2017 | Expired or cancelled expired Jul 2024 | 653 Marina Bl | revision to app#201609218439 to include new interior stairs(including handrails and guardrail) from 2nd floor to 4th floor to replace extg stairs, handrails & guardrails in kind. n/a for maherDetails
revision to app#201609218439 to include new interior stairs(including handrails and guardrail) from 2nd floor to 4th floor to replace extg stairs, handrails & guardrails in kind. n/a for maher | $10,000 | |
| Sep 21, 2016 | Expired or cancelled expired Jul 2024 | 653 Marina Bl | Colindres & Associates | revision to pa 2014-0925-7331 - add (n) skylight @ 4th floor west side & (n) 30" tall 1-hr rated parapet @ roof; add (n) steel trellis at south facade; delete property line windows at rear, east side; add (n) steel gate @ entry walkway (not lockable); replace (e) steel railing; repl interior stairs.Details
revision to pa 2014-0925-7331 - add (n) skylight @ 4th floor west side & (n) 30" tall 1-hr rated parapet @ roof; add (n) steel trellis at south facade; delete property line windows at rear, east side; add (n) steel gate @ entry walkway (not lockable); replace (e) steel railing; repl interior stairs. | $20,000 |
| Aug 23, 2016 | Never finaled issued Jun 2017, no final | 33 Spruce St | construct (n) metal, non-combustible walkway to access upper garden @ rear of 2nd fl. (n) wood door to replace (e) wood window @ nw corner to access walkway. no work inside house.Details
construct (n) metal, non-combustible walkway to access upper garden @ rear of 2nd fl. (n) wood door to replace (e) wood window @ nw corner to access walkway. no work inside house. | $27,000 | |
| Aug 18, 2016 | Completed final sign-off Jun 2019 | 3947 Washington St | construct staggered 3 story addition @ rear south of bldg. interior renovation. construct smal, nw corner addition @ 1st& 2nd fl. construct roof deck above 1st fl @ rear (south). widen (e) 3rd fl lightwell @ west. new windows@ rear (south). combination of new replace in kind windows @ north facade.Details
construct staggered 3 story addition @ rear south of bldg. interior renovation. construct smal, nw corner addition @ 1st& 2nd fl. construct roof deck above 1st fl @ rear (south). widen (e) 3rd fl lightwell @ west. new windows@ rear (south). combination of new replace in kind windows @ north facade. | $1,100,000 | |
| May 19, 2016 | Expired or cancelled expired Jul 2024 | 653 Marina Bl | Colindres & Associates | revision to appl #201409257331 - added scope of work includes: new steel doors & windows @ front (north) facade, new entry door & garage door. n/a maher ordinanceDetails
revision to appl #201409257331 - added scope of work includes: new steel doors & windows @ front (north) facade, new entry door & garage door. n/a maher ordinance | $10,000 |
| Feb 25, 2016 | Expired or cancelled suspend Aug 2025 | 207 Avila St | foundation replacement - n/a maher ordinanceDetails
foundation replacement - n/a maher ordinance | $100,000 | |
| Feb 12, 2016 | Completed final sign-off Dec 2016 | 37 Jordan Av | Kevin Sullivan Construction Inc. | revision to pa #201512245894 & 201512165214 - install 2 new windows & interior headers at walls. n/a maher ordinanceDetails
revision to pa #201512245894 & 201512165214 - install 2 new windows & interior headers at walls. n/a maher ordinance | $10,000 |
| Aug 6, 2015 | Expired or cancelled withdrawn Sep 2015 | 33 Spruce St | reroof (e) porch w/standoffs for 9n) garden structure. maher naDetails
reroof (e) porch w/standoffs for 9n) garden structure. maher na | $1,200 | |
| Sep 25, 2014 | Completed final sign-off Jul 2024 | 653 Marina Bl | Colindres & Associates | horizontal add to 1st, 2nd, 4th fl. (n)stairs bet 1st/2nd fl. build into east lightwell. (n)fire sprinklers throughout. interior work incl (n) finishes, elec & plumb fixtures. hardscape & landscape work in rear yard. (n) doors & windows @ south & west facade. replace doors inkind @ 4th fl north elevDetails
horizontal add to 1st, 2nd, 4th fl. (n)stairs bet 1st/2nd fl. build into east lightwell. (n)fire sprinklers throughout. interior work incl (n) finishes, elec & plumb fixtures. hardscape & landscape work in rear yard. (n) doors & windows @ south & west facade. replace doors inkind @ 4th fl north elev | $400,000 |
| Jun 13, 2014 | Never finaled issued Apr 2015, no final | 1055 Green St | O'neill Construction Inc | remove lower story of (e) bay window & add new balcony @ 1st floor with new doors. no change to front facade on west & east elevation. all work @ rear elevation.Details
remove lower story of (e) bay window & add new balcony @ 1st floor with new doors. no change to front facade on west & east elevation. all work @ rear elevation. | $25,000 |
| May 23, 2014 | Never finaled issued Feb 2015, no final | 93 Parker Av | Hildebrand Renovation | construct a 2 story addition on south side yard of 3' wide x 19'7" long. the overall height of bldg will not increase, proposed addition is setback 12' from front of house the project also includes alterations to doors and windows on east, south & west. new deck in rear yard & extensive interiorDetails
construct a 2 story addition on south side yard of 3' wide x 19'7" long. the overall height of bldg will not increase, proposed addition is setback 12' from front of house the project also includes alterations to doors and windows on east, south & west. new deck in rear yard & extensive interior | $350,000 |
| Mar 20, 2014 | Completed final sign-off Apr 2016 | 3659 Washington St | Moroso Construction Inc | new rear addition at 3rd floor no change to building footprint, not visible from street interior remodel.Details
new rear addition at 3rd floor no change to building footprint, not visible from street interior remodel. | $80,000 |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 3022 Washington St | Jeff King And Company Inc | revision to pa# 2012-0830-8685-changes to (e) balcony to remain, new lower stair to replace (e) in kind, window revisions, interior plan revisionsDetails
revision to pa# 2012-0830-8685-changes to (e) balcony to remain, new lower stair to replace (e) in kind, window revisions, interior plan revisions | |
| Feb 1, 2013 | Completed final sign-off Oct 2013 | 2647 Pierce St | Jeff King And Company Inc | replace extg front windows, east, north and south elevations with new aluminum clad windows. replace extg painted shingles. repair extg entry stair and insulate exterior walls. u factor <.4.Details
replace extg front windows, east, north and south elevations with new aluminum clad windows. replace extg painted shingles. repair extg entry stair and insulate exterior walls. u factor <.4. | $55,000 |
| Dec 19, 2012 | Completed final sign-off Oct 2013 | 610 El Camino Del Mar | Moroso Construction Inc | revision to app#201009201192 for minor window revision.side and back (rear)Details
revision to app#201009201192 for minor window revision.side and back (rear) | |
| Jun 21, 2012 | Never finaled issued Jan 2013, no final | 3660 Clay St | Fred Pavlow Co. Inc Dba Add-A-Garage, Gleason & Tankard | excavation of e garage for new garage space and stair access to residence. garage door to be widened and replaced. new railing at garage deck to match e entry rail. e kitchen to be demo and repalced in kind. replace e entry stair in kind. replace chain link fence with wood latticeDetails
excavation of e garage for new garage space and stair access to residence. garage door to be widened and replaced. new railing at garage deck to match e entry rail. e kitchen to be demo and repalced in kind. replace e entry stair in kind. replace chain link fence with wood lattice | $85,000 |
| Jun 1, 2012 | Never finaled issued Oct 2012, no final | 3660 Clay St | kitchen & bathroom remodel (56 sq. ft. kitchen addition). new deck outside kitchen addition & new deck above kitchen addition. replace & remodel bathroom & fixtures. new basement access stair from grade relocated from (e) location.Details
kitchen & bathroom remodel (56 sq. ft. kitchen addition). new deck outside kitchen addition & new deck above kitchen addition. replace & remodel bathroom & fixtures. new basement access stair from grade relocated from (e) location. | $100,000 | |
| May 17, 2012 | Completed final sign-off Apr 2013 | 2647 Pierce St | Jeff King And Company Inc | minor interior removtion to include: enw mudroom, renovation of kitchen, family & dining room w/new doors & window to rear yard, renovate master bathroom & suite terrace (roof deck)Details
minor interior removtion to include: enw mudroom, renovation of kitchen, family & dining room w/new doors & window to rear yard, renovate master bathroom & suite terrace (roof deck) | $160,000 |
| Apr 12, 2012 | Never finaled issued Oct 2012, no final | 63 20th Av | construct a 4'-0" horizontal addition to rear of residence @ main & upper levels only. addition will include expansions toward both side property lines. alterations to doors & windows & new skylines at roof. design intent for no new construction to be visible fr public right of way on 20th aveDetails
construct a 4'-0" horizontal addition to rear of residence @ main & upper levels only. addition will include expansions toward both side property lines. alterations to doors & windows & new skylines at roof. design intent for no new construction to be visible fr public right of way on 20th ave | $160,000 | |
| Jan 26, 2012 | Completed final sign-off Jan 2013 | 3365 Clay St | Richard Knight Iv Construction | revision to permit #201008199183 - the alteration of an approved stair & deck at the rear yard that is currently under construction.Details
revision to permit #201008199183 - the alteration of an approved stair & deck at the rear yard that is currently under construction. | |
| Oct 15, 2010 | Completed final sign-off Nov 2011 | 1538 07th Av | Talcon Builders | refurbishment of (e) 69 sf one-story wing @ rear of (e) residence, with (n) adjacent 29 sf addition. no exterior work for the front of (e) residence. interior renovations include reconfigured kitchen, remodeled (e) bath, reconfigured master closet & (n) master bath. addition is infill underneath anDetails
refurbishment of (e) 69 sf one-story wing @ rear of (e) residence, with (n) adjacent 29 sf addition. no exterior work for the front of (e) residence. interior renovations include reconfigured kitchen, remodeled (e) bath, reconfigured master closet & (n) master bath. addition is infill underneath an | $90,000 |
| Sep 23, 2010 | Never finaled issued Oct 2010, no final | 3022 Washington St | Plath & Company Inc | reversal of existing exterior door from inswing to outswing. interior renovations including removeal and replacement of existing storage room, new closet, new bench seating.Details
reversal of existing exterior door from inswing to outswing. interior renovations including removeal and replacement of existing storage room, new closet, new bench seating. | $4,900 |
| Sep 20, 2010 | Completed final sign-off Oct 2013 | 610 El Camino Del Mar | Peninsula Custom Homes Inc | alterations to front; replace (2) windows with (2) doors, raise floor of courtyard, replace driveway & garage door. work @ sides of house: minor alterations to windows & doors. work to rear of house: remove a portion of (e) solarium roof & replace with outdoor terrace & railing, remove (2) bay wiDetails
alterations to front; replace (2) windows with (2) doors, raise floor of courtyard, replace driveway & garage door. work @ sides of house: minor alterations to windows & doors. work to rear of house: remove a portion of (e) solarium roof & replace with outdoor terrace & railing, remove (2) bay wi | $600,000 |
| Aug 19, 2010 | Completed final sign-off Jan 2013 | 3365 Clay St | Richard Knight Iv Construction | 7'-8" add'n to rear of resd @ 1st&2nd/fls.no ext'r wk scheduled for front half of(e)res.interior renov@laundry,stairs, bath&kitchen.construct 3/fl mstr suite addition 1000 sq ft@rear of resd,set back approx17'-2"fr(e)frt elev. remove(e)decks@rear of 1st&2nd/fl,constr new decks@expanded 1st&/2nd/fls.Details
7'-8" add'n to rear of resd @ 1st&2nd/fls.no ext'r wk scheduled for front half of(e)res.interior renov@laundry,stairs, bath&kitchen.construct 3/fl mstr suite addition 1000 sq ft@rear of resd,set back approx17'-2"fr(e)frt elev. remove(e)decks@rear of 1st&2nd/fl,constr new decks@expanded 1st&/2nd/fls. | $390,000 |
| Aug 11, 2010 | Completed final sign-off Oct 2010 | 2740 Broderick St | Lewis M Merlo Inc | widen sidewalk driveway curb cut 2'-0"Details
widen sidewalk driveway curb cut 2'-0" | $750 |
| Jul 9, 2010 | Completed final sign-off Oct 2011 | 3580 Jackson St | Jeff King And Company Inc | kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deckDetails
kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deck | $700,000 |
| May 4, 2010 | Completed final sign-off Sep 2010 | 33 Spruce St | Hadley General Contractors Inc | revision to pa# 2010.03.02.7436. structural change to walls and roof, sistering to (e) framing.Details
revision to pa# 2010.03.02.7436. structural change to walls and roof, sistering to (e) framing. | |
| Mar 2, 2010 | Completed final sign-off Sep 2010 | 33 Spruce St | Hadley General Contractors Inc | repair and renovation of (e) garage (unconditioned space) with new roof line at front facade.Details
repair and renovation of (e) garage (unconditioned space) with new roof line at front facade. | $20,000 |
| Aug 12, 2009 | Completed final sign-off Feb 2010 | 79 Divisadero St | Plath & Company Inc | revision (subsequent work) to current appl # 200907233273 - move renovated bathroom, open railing for stair, add two new beams.Details
revision (subsequent work) to current appl # 200907233273 - move renovated bathroom, open railing for stair, add two new beams. | $17,000 |
| Jul 6, 2009 | Completed final sign-off Apr 2010 | 3388 Clay St | Hadley General Contractors Inc | remodel of 3rd and 4th floor bedrooms, bathrooms. reconfiguration. no additonal square footage. no exterior changes.Details
remodel of 3rd and 4th floor bedrooms, bathrooms. reconfiguration. no additonal square footage. no exterior changes. | $150,000 |
| Dec 23, 2008 | Never finaled issued Dec 2008, no final | 69 Carmelita St | Baywolf Construction Inc | to obtain final inspection for work approved under pa#2006-0815-9466.Details
to obtain final inspection for work approved under pa#2006-0815-9466. | |
| Dec 23, 2008 | Never finaled issued Dec 2008, no final | 69 Carmelita St | Baywolf Construction Inc | to obtain final inspecton for work approved under pa#2008-0403-8758.Details
to obtain final inspecton for work approved under pa#2008-0403-8758. | |
| Jun 19, 2008 | Completed final sign-off Jun 2009 | 3778 Clay St | Jb Builders | this a revision to pa# 2006-1024-5937-scope of change include: new gas fireplace to replace (e), plan layout at kitchen re-arranged, reduction in size & number of windows at 1st floor, structural revisionDetails
this a revision to pa# 2006-1024-5937-scope of change include: new gas fireplace to replace (e), plan layout at kitchen re-arranged, reduction in size & number of windows at 1st floor, structural revision | $2,000 |
| Oct 30, 2007 | Expired or cancelled expired Aug 2009 | 2214 Clay St | change to appication #200710024234 widow replacement on third floorDetails
change to appication #200710024234 widow replacement on third floor | $1,000 | |
| Oct 9, 2007 | Expired or cancelled expired Aug 2009 | 2214 Clay St | Barcewski Inc Dba Sunshine Construction, Plath & Company Inc | horiz. addition to 2/f rear. infill porch @ 1/f rear. new wood deck @ rear. excavate & widen (e) side driveway, add 2 car garage to basement @ side rear of bldg. no change to front facade. remodel/enlarge kitchen, add master bedroom on (e) 2/f deck.Details
horiz. addition to 2/f rear. infill porch @ 1/f rear. new wood deck @ rear. excavate & widen (e) side driveway, add 2 car garage to basement @ side rear of bldg. no change to front facade. remodel/enlarge kitchen, add master bedroom on (e) 2/f deck. | $250,000 |
| Jun 8, 2007 | Completed final sign-off Jan 2008 | 2740 Broderick St | Paul Ryan Associates, Demex Engineering, Inc | rout to raymond lui: for shoring temporary fo excavaytion for residence new which is under approved buldding permit 200603076103 also related to two other perviously approved and permit for shoring and underpinning: 20061107420 and 200702023284Details
rout to raymond lui: for shoring temporary fo excavaytion for residence new which is under approved buldding permit 200603076103 also related to two other perviously approved and permit for shoring and underpinning: 20061107420 and 200702023284 | $95,000 |
| Feb 9, 2007 | Never finaled issued Feb 2007, no final | 60 Ventura Av | revision to appl#200603066067 revise insulated glass to be laminated glass with energy calculations.Details
revision to appl#200603066067 revise insulated glass to be laminated glass with energy calculations. | ||
| Feb 2, 2007 | Completed final sign-off Jan 2008 | 2740 Broderick St | Paul Ryan Associates | temporary shoring and grading for future residence under appl# 200603076103 - it is a sister permit to underpinning at 2736 broderick which is approved appl# 200611107420.Details
temporary shoring and grading for future residence under appl# 200603076103 - it is a sister permit to underpinning at 2736 broderick which is approved appl# 200611107420. | |
| Nov 10, 2006 | Completed final sign-off Jan 2008 | 2736 Broderick St | Demex Engineering, Inc | shoring and underpinning (temporary) on north side, for protecting building during excavation at 2740 broderick project, which is permit no#200603076103-sa, raymond lui is reviewing.Details
shoring and underpinning (temporary) on north side, for protecting building during excavation at 2740 broderick project, which is permit no#200603076103-sa, raymond lui is reviewing. | $55,000 |
| Sep 15, 2006 | Expired or cancelled expired Sep 2008 | 127 02nd Av | Plath & Company Inc | merge 2nd unit at basement into main dwelling. addition at rear includes 1 car garage, kitchen and expanded master bed, no work to front of building.Details
merge 2nd unit at basement into main dwelling. addition at rear includes 1 car garage, kitchen and expanded master bed, no work to front of building. | $209,000 |
| Aug 23, 2006 | Expired or cancelled expired Aug 2009 | 2666 Vallejo St | Gericke Construction | new garage (with some excavation) in existing basement. new driveway and curb cut. demo existing (1 story) bathroom in rear, replace with 2 story stack (breakfast room over mudroom). also remodeling at interior: bathrooms and third floor. no horizontalDetails
new garage (with some excavation) in existing basement. new driveway and curb cut. demo existing (1 story) bathroom in rear, replace with 2 story stack (breakfast room over mudroom). also remodeling at interior: bathrooms and third floor. no horizontal | $190,000 |
| Aug 15, 2006 | Completed final sign-off Jan 2009 | 69 Carmelita St | new 2-story rear addition to replace 1 story rear addition. kitchen to be remodeled at existing basement- front room to be converted to be garage. new drive and curb cut. rear of basement to have new bedroom and mudroom.Details
new 2-story rear addition to replace 1 story rear addition. kitchen to be remodeled at existing basement- front room to be converted to be garage. new drive and curb cut. rear of basement to have new bedroom and mudroom. | $103,500 | |
| Aug 3, 2006 | Completed final sign-off Jan 2007 | 33 Spruce St | non-structural remodel of existing art room, storage and bathroom on 3rd floor/attic level per plan shown.Details
non-structural remodel of existing art room, storage and bathroom on 3rd floor/attic level per plan shown. | $16,000 | |
| Mar 21, 2006 | Completed final sign-off Nov 2007 | 2740 Broderick St | to demolish 1 story private garage.Details
to demolish 1 story private garage. | ||
| Mar 7, 2006 | Completed final sign-off Nov 2007 | 2740 Broderick St | to demolish 1 story single family dwelling unit.Details
to demolish 1 story single family dwelling unit. | ||
| Mar 7, 2006 | Completed final sign-off Dec 2009 | 2740 Broderick St | Paul Ryan Associates | to erect 3 stories, single family dwelling building.Details
to erect 3 stories, single family dwelling building. | $828,350 |
| Mar 6, 2006 | Completed final sign-off Sep 2007 | 60 Ventura Av | minor aesthetic alterations to the front door surround and stairs extension of eisting dormer at second floor, heightened ceiling at stair well. most wood window sashes to be replaced in kind. new roof.Details
minor aesthetic alterations to the front door surround and stairs extension of eisting dormer at second floor, heightened ceiling at stair well. most wood window sashes to be replaced in kind. new roof. | $120,000 | |
| Oct 18, 2005 | Completed final sign-off Nov 2006 | 3662 Clay St | Gericke Construction | all work to be within the (e) buld envelope. no change to bldg footprint. master bath to be completely remodeled and kitchen to be partially remodeled. remove masonry fireplace @ second fl & masonry chimney @ 3rd/fl. replace w/new double walled flue. move non bearing partition in mudroom. no structDetails
all work to be within the (e) buld envelope. no change to bldg footprint. master bath to be completely remodeled and kitchen to be partially remodeled. remove masonry fireplace @ second fl & masonry chimney @ 3rd/fl. replace w/new double walled flue. move non bearing partition in mudroom. no struct | $65,000 |
| Aug 24, 2005 | Completed final sign-off Jan 2006 | 2165 California St | Robert B Lewis Const. | re-design of (e) recessed can lighting layout. new gas insert fireplace, (n) cabinet & countertop.Details
re-design of (e) recessed can lighting layout. new gas insert fireplace, (n) cabinet & countertop. | $25,000 |
| Jul 15, 2005 | Never finaled issued Nov 2005, no final | 45 West Portal Av | structural beam to replace dilapidated framing for residental sotries above. rev to pa#200410146793s. structural retaining wall in rear.Details
structural beam to replace dilapidated framing for residental sotries above. rev to pa#200410146793s. structural retaining wall in rear. | $7,000 | |
| Jun 15, 2005 | Completed final sign-off Dec 2005 | 3249 Pacific Av | Redhorse Constructors Inc. | rev pa# 2004/08/19/2059 change heating system from forced air to radiant in floor tubes,Details
rev pa# 2004/08/19/2059 change heating system from forced air to radiant in floor tubes, | $45,000 |
| Apr 22, 2005 | Completed final sign-off Apr 2006 | 367 Panorama Dr | (e) rooms (storage) behind and beside garage ot be remodeled. into kitchen, bath and living room.Details
(e) rooms (storage) behind and beside garage ot be remodeled. into kitchen, bath and living room. | $90,000 | |
| Apr 12, 2005 | Never finaled issued Aug 2005, no final | 73 Carmelita St | conversion of (e) attic to bedroom/sitting room and bathroom. new stairs to access attic & new dormeDetails
conversion of (e) attic to bedroom/sitting room and bathroom. new stairs to access attic & new dorme | $65,000 | |
| Apr 8, 2005 | Completed final sign-off Jul 2005 | 1 Locust St | Redhorse Constructors Inc. | revision to (e0 app#200503177817. scope of work no longer includes entry trellis. corner of fence toDetails
revision to (e0 app#200503177817. scope of work no longer includes entry trellis. corner of fence to | |
| Mar 17, 2005 | Completed final sign-off Jul 2005 | 1 Locust St | Redhorse Constructors Inc. | replace (e)streetfront wood & lattice fence in kind.structure is dry rooted,replace 34"max.woodDetails
replace (e)streetfront wood & lattice fence in kind.structure is dry rooted,replace 34"max.wood | $6,000 |
| Dec 27, 2004 | Completed final sign-off Sep 2005 | 3249 Pacific Av | Redhorse Constructors Inc. | facade renovation. remove (e) stucco, replace with new shingles at front & front sides of bldg.Details
facade renovation. remove (e) stucco, replace with new shingles at front & front sides of bldg. | $25,000 |
| Nov 15, 2004 | Completed final sign-off Nov 2005 | 2 Laurel St | Plath & Company Inc | extend (e)rear yard deck.revise kitchen,master bathrm &window(match wood window).new siding.......Details
extend (e)rear yard deck.revise kitchen,master bathrm &window(match wood window).new siding....... | $120,000 |
| Oct 28, 2004 | Expired or cancelled expired May 2006 | 3282 Jackson St | Michael C Hargrove Construction | install 1 skylight each in each bathroom. 2 skylights total.Details
install 1 skylight each in each bathroom. 2 skylights total. | $2,000 |
| Feb 19, 2003 | Expired or cancelled expired Nov 2003 | 2857 Filbert St | replace doors & windows @ g/fl of bldg., all work below deck level, not visible from neighbors,Details
replace doors & windows @ g/fl of bldg., all work below deck level, not visible from neighbors, | $18,000 |