Block 1355, lot 038
13 Presidio Ter
- City’s use
- Single Family Residential
- Built
- 1922
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 6,460 sq ft
- Lot
- 6,695 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 13 Presidio Tr | Pacific Restoration Inc Dba Servpro | to obtain final inspection for work approved under pa# 202402085566. all work is complete.Details
to obtain final inspection for work approved under pa# 202402085566. all work is complete. | $15,000 |
| Feb 11, 2026 | Completed final sign-off Mar 2026 | 13 Presidio Tr | Norman Charles Construction | to obtain final inspection for work approved under pa#202406063826, all work is complete.Details
to obtain final inspection for work approved under pa#202406063826, all work is complete. | |
| Jun 6, 2024 | Expired or cancelled expired Mar 2026 | 13 Presidio Tr | Norman Charles Construction | flood repair and restoration in kind. mep, sheetrock, casework and paint. all work to restore repaired areas back to original state prior to flood damage. all work located at lowest floor (basement). no structural work.Details
flood repair and restoration in kind. mep, sheetrock, casework and paint. all work to restore repaired areas back to original state prior to flood damage. all work located at lowest floor (basement). no structural work. | $50,000 |
| Feb 8, 2024 | Expired or cancelled expired Mar 2026 | 13 Presidio Tr | Pacific Restoration Inc Dba Servpro | all ground level floor will need to remove 4 ft of drywall of drywall due to water damage. demo: 4ft drywall & r-19 insulation, baseboards, flooring: carpet 120 sqft, hardwood 250 sqft viinly 150 sqft & cabinets 60lf.Details
all ground level floor will need to remove 4 ft of drywall of drywall due to water damage. demo: 4ft drywall & r-19 insulation, baseboards, flooring: carpet 120 sqft, hardwood 250 sqft viinly 150 sqft & cabinets 60lf. | $15,000 |
| Feb 27, 2020 | Completed final sign-off Dec 2022 | 13 Presidio Tr | Norman Charles Construction | (n) wood deck over (e) garage roof. (n) wood connecting bridge and stair between (e) garage and (e) wood deck at south west corner of (e) dwelling. (n) wood stair to rear yard at west property line. all work to (e) dwelling under separate permit. ** maher: n/a **Details
(n) wood deck over (e) garage roof. (n) wood connecting bridge and stair between (e) garage and (e) wood deck at south west corner of (e) dwelling. (n) wood stair to rear yard at west property line. all work to (e) dwelling under separate permit. ** maher: n/a ** | $75,000 |
| Feb 18, 2020 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | revision to pa 2019-0402-6871, 2019-0510-0375 & 2019-0920-2297 bathrooms moved on 2nd fl, bathroom reconfigured in basement. no change to 3 facades at rear facades previously approved windows ganged into 1 opening at basement & 1st flDetails
revision to pa 2019-0402-6871, 2019-0510-0375 & 2019-0920-2297 bathrooms moved on 2nd fl, bathroom reconfigured in basement. no change to 3 facades at rear facades previously approved windows ganged into 1 opening at basement & 1st fl | |
| Sep 20, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | revision to 201905100375 window replacement at rear elevation - demo infill 2 windows (e). new window in its placeDetails
revision to 201905100375 window replacement at rear elevation - demo infill 2 windows (e). new window in its place | $1,000 |
| May 10, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | interior renovation including non-structural partitions, relocation of bathrooms and laundry room; exterior work inlcuding replacement of wood siding, new windows and doors @ side and back facades. no work on the front facade; foundation work approved under pa 2019-0402-6871; 2nd fl - add bedroomDetails
interior renovation including non-structural partitions, relocation of bathrooms and laundry room; exterior work inlcuding replacement of wood siding, new windows and doors @ side and back facades. no work on the front facade; foundation work approved under pa 2019-0402-6871; 2nd fl - add bedroom | $100,000 |
| Apr 12, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | exploratory demoltion to locate structure and services in advance of sfd renovation. maxium 500 sq ft drywall removal. patch and repair as required.Details
exploratory demoltion to locate structure and services in advance of sfd renovation. maxium 500 sq ft drywall removal. patch and repair as required. | $2,000 |
| Apr 2, 2019 | Completed final sign-off May 2021 | 13 Presidio Tr | Clayton Timbrell & Co | interior renovation and structural foundation upgrade with minor exterior work at rear facade. work to include basement expansion, foundation replacement and 2 new windows on rear facadeDetails
interior renovation and structural foundation upgrade with minor exterior work at rear facade. work to include basement expansion, foundation replacement and 2 new windows on rear facade | $227,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2014 | 13 Presidio Tr | Fox Structural & Termite | to obtain final inspection for work approved under pa#201109154772. all work is complete.Details
to obtain final inspection for work approved under pa#201109154772. all work is complete. | |
| Aug 9, 2012 | Completed final sign-off Oct 2013 | 13 Presidio Tr | Siteworks Landscape Inc. | repair existing deck and stair, new retaining wall and gravel terraceDetails
repair existing deck and stair, new retaining wall and gravel terrace | $28,000 |
| Sep 15, 2011 | Never finaled issued Sep 2011, no final | 13 Presidio Tr | Fox Structural & Termite | section 1 items on fox structural termite report # 13412 dated 5/16/11. (less than 50% repair)Details
section 1 items on fox structural termite report # 13412 dated 5/16/11. (less than 50% repair) | $48,000 |
| Jun 21, 2011 | Completed final sign-off Sep 2011 | 13 Presidio Tr | Merchant Construction | removal of existing skylight and replace with new roofingDetails
removal of existing skylight and replace with new roofing | $6,000 |
| Feb 13, 2001 | Completed final sign-off Apr 2001 | 13 Presidio Tr | Kearney & Obanion Inc. | concrete and steel reiforcement to foundationDetails
concrete and steel reiforcement to foundation | $3,500 |
| Dec 6, 2000 | Completed final sign-off Apr 2001 | 13 Presidio Tr | Kearney & Obanion Inc. | install liquid membrane over concrete foundation-waterproof existing foundation 25 by 25Details
install liquid membrane over concrete foundation-waterproof existing foundation 25 by 25 | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.