Akuavi Hine
- License
- S6470
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6470 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Murphy Brr Curry Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2022 to Sep 2026
24 permits since 2000 (engineer on 23 permits, architect on 1 permit): 3 completed, 18 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Saarman Construction,Ltd. (11), D A Pope Inc (2), Counterforce Inc., Guild Construction Inc, J Construction Solutions, Marchetti Group, Rudolph Commercial Interiors Inc, Rci, Tom Lewis Restoration And Consulting
- Architects
- Winston Win (10), Ariane Lebrilla (4), Adrian Blanco, Juan Duque Jr., Marc Dimalanta, Stanley H Lew
- Authorized agents
- Chih-Cheng Tsai, Daniel Nishida
Where they worked
- Single-family 5
- Multi-family (2-family, apartments) 12
- Commercial 4
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Oct 2026 | 300 Montgomery St | Marchetti Group | ste 200 2/f: t.i, includes seismic bolting of (e) three phone booths.Details
ste 200 2/f: t.i, includes seismic bolting of (e) three phone booths. | $7,500 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 740 Buchanan St | Saarman Construction,Ltd. | bldg #10: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. site improvements to provide a compliant accessible path to parking and the public right of way.Details
bldg #10: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. site improvements to provide a compliant accessible path to parking and the public right of way. | $658,690 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 655 Fulton St | Saarman Construction,Ltd. | bldg #1: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units.Details
bldg #1: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. | $938,849 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 612 Grove St | Saarman Construction,Ltd. | bldg #5: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement.Details
bldg #5: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. | $642,592 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 656 Grove St | Saarman Construction,Ltd. | renovation (e) community building. reconfiguration interior space to upgrade the existing bathroom and kitchen to accessible spaces. new windows and refresh of exterior, patching and paint. new playground & community spaces. 2 accessible parking spots & add accessible path.Details
renovation (e) community building. reconfiguration interior space to upgrade the existing bathroom and kitchen to accessible spaces. new windows and refresh of exterior, patching and paint. new playground & community spaces. 2 accessible parking spots & add accessible path. | $594,500 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 735 Laguna St | Saarman Construction,Ltd. | bldg #3: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement.Details
bldg #3: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. | $564,274 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 625 Fulton St | Saarman Construction,Ltd. | bldg #2: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement.Details
bldg #2: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. | $253,062 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 666 Grove St | Saarman Construction,Ltd. | bldg #6: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement.Details
bldg #6: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. | $565,414 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 601 Grove St | Saarman Construction,Ltd. | bldg #9: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. site improvements to provide a compliant accessible path to parking and the public right of way.Details
bldg #9: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. site improvements to provide a compliant accessible path to parking and the public right of way. | $1,611,129 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 822 Buchanan St | Saarman Construction,Ltd. | bldg #7: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement.Details
bldg #7: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. | $759,293 |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 715 Laguna St | Saarman Construction,Ltd. | bldg #4: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. site improvements to provide a compliant accessible path to parking and the public right of way.Details
bldg #4: in-kind window replacement. exterior repairs, including partial stucco replacement/repair and paint. roof replacement. addition of two accessible units. site improvements to provide a compliant accessible path to parking and the public right of way. | $460,450 |
| Apr 17, 2026 | In progress issued May 2026 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | ste 1500 / 15/f: seismic bolting of phone booths.Details
ste 1500 / 15/f: seismic bolting of phone booths. | $5,000 |
| Apr 1, 2026 | In progress issued May 2026 | 1101 Masonic Av | Guild Construction Inc | revision to 202507221358: to provide structural support for new openings proposed in permit application 202507221358.Details
revision to 202507221358: to provide structural support for new openings proposed in permit application 202507221358. | |
| Mar 17, 2026 | In progress issued Mar 2026 | 1301 16th St | J Construction Solutions | 1st floor - interior tenant improvement: new partitions, finishes, and fixtures. structural drawings included for concrete slab.Details
1st floor - interior tenant improvement: new partitions, finishes, and fixtures. structural drawings included for concrete slab. | $225,000 |
| Sep 3, 2025 | In progress issued Sep 2025 | 4521 20th St | Tom Lewis Restoration And Consulting | to strengthen and straighten the out of floor walls at the top level of the homeDetails
to strengthen and straighten the out of floor walls at the top level of the home | $80,000 |
| Apr 15, 2025 | In progress issued Jan 2026 | 167 20th Av | front yrd garage add'n: demo (e) planting beds,lighting fixtures,retaining walls,concrete steps and excvation as reqd for new sub-terrianian garage with pour in place concrete walls, stairs and deck. new led lighting, planters and permeable surfaces.Details
front yrd garage add'n: demo (e) planting beds,lighting fixtures,retaining walls,concrete steps and excvation as reqd for new sub-terrianian garage with pour in place concrete walls, stairs and deck. new led lighting, planters and permeable surfaces. | $110,000 | |
| Jul 19, 2024 | Expired or cancelled expired Jul 2026 | 472 Hazelwood Av | revision to pa# 2023-1019-9055 revised details for s4.0 & s4.1Details
revision to pa# 2023-1019-9055 revised details for s4.0 & s4.1 | ||
| Jun 4, 2024 | Expired or cancelled expired Jul 2026 | 472 Hazelwood Av | gravity shoring for excavation work under pa#202310199055.Details
gravity shoring for excavation work under pa#202310199055. | $2,000 | |
| Oct 19, 2023 | In progress issued Jun 2024 | 472 Hazelwood Av | reconstruction of existing foundations, addition of plywood to floor diaphragm and g/f walls, addition of 2 full bathrooms and 2 bedrooms. rebuild side steps. added drainage on property. horizontal excavation in basement.Details
reconstruction of existing foundations, addition of plywood to floor diaphragm and g/f walls, addition of 2 full bathrooms and 2 bedrooms. rebuild side steps. added drainage on property. horizontal excavation in basement. | $150,000 | |
| Aug 2, 2023 | In progress issued Nov 2025 | 900 Bush St | Saarman Construction,Ltd. | exterior common area renovation for waterproofing, associated hardscape, and associated landscape at existing plaza decks only. (not visible from street) (e) footprint of (e) building to remain no change.Details
exterior common area renovation for waterproofing, associated hardscape, and associated landscape at existing plaza decks only. (not visible from street) (e) footprint of (e) building to remain no change. | $3,000,000 |
| Jan 10, 2023 | Never finaled filed Jan 2023, never issued | 2691 18th Av | Counterforce Inc. | retaining wall replacement: a new retaining wall made of concrete 10" thick and 10'0" tall will replace the rear (e) timber-wooden wall which is deteriorating.Details
retaining wall replacement: a new retaining wall made of concrete 10" thick and 10'0" tall will replace the rear (e) timber-wooden wall which is deteriorating. | $69,000 |
| Nov 29, 2022 | Completed final sign-off Jun 2023 | 472 Hazelwood Av | replacement of stair treads, walls, foundation & risers up to entry landing; visible from street. repair in-kind.Details
replacement of stair treads, walls, foundation & risers up to entry landing; visible from street. repair in-kind. | $15,000 | |
| Aug 19, 2022 | Completed final sign-off Nov 2022 | 1550 Bryant St | D A Pope Inc | 8/f: rev to pa202205103842. modifty the dining area, office area and opening office ara. configuring them differently. increasing the overall occupancy count from 345 to 350. structural included.Details
8/f: rev to pa202205103842. modifty the dining area, office area and opening office ara. configuring them differently. increasing the overall occupancy count from 345 to 350. structural included. | |
| May 10, 2022 | Completed final sign-off Nov 2022 | 1550 Bryant St | D A Pope Inc | 8th fl: t.i. includes demo of non-structural partitions + building new non-structural partitions. all newer revised mep's + life safety + sprinkler work will be design-build & submitted separately. bldg is fully sprinklered.Details
8th fl: t.i. includes demo of non-structural partitions + building new non-structural partitions. all newer revised mep's + life safety + sprinkler work will be design-build & submitted separately. bldg is fully sprinklered. | $165,000 |