Block 0275B, lot 001
920 Bush St
- City’s use
- Commercial Retail
- Built
- 1982
- Stories
- 13
- Rooms
- 2 bathrooms
- Building
- 3,248 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2025 | In progress issued Mar 2026 | 900 Bush St | Saarman Construction,Ltd. | revision to previously approved permits 202308023543 and 202310259430 issued 8/19/25 exterior entry canopy and associated canopy light only at e main residential condominium lobby entry, common areaDetails
revision to previously approved permits 202308023543 and 202310259430 issued 8/19/25 exterior entry canopy and associated canopy light only at e main residential condominium lobby entry, common area | |
| Mar 28, 2024 | Completed final sign-off Jul 2025 | 940 Bush St | Atelier 19ad6 | t.i. relocate 4-6 outlets. reset an ext non ada lavatoory sink to ada compliant. cut 2 opening for office desk. no changes to bearing/demissing walls.Details
t.i. relocate 4-6 outlets. reset an ext non ada lavatoory sink to ada compliant. cut 2 opening for office desk. no changes to bearing/demissing walls. | $20,000 |
| Oct 25, 2023 | In progress issued Aug 2025 | 900 Bush St | Saarman Construction,Ltd. | deferred electrical permit for exterior emergency lightings wiring and inverter, at frontage adjacent to bush st. common area improvements. referred to previous permit 202308023543. for main frontage waterproof scope of work. electrical only.Details
deferred electrical permit for exterior emergency lightings wiring and inverter, at frontage adjacent to bush st. common area improvements. referred to previous permit 202308023543. for main frontage waterproof scope of work. electrical only. | |
| Aug 2, 2023 | In progress issued Aug 2025 | 900 Bush St | Saarman Construction,Ltd. | exterior common area improvements for waterproofing and associated landscape along frontage adjacent to bush st only (from face of existing bldg to property line).Details
exterior common area improvements for waterproofing and associated landscape along frontage adjacent to bush st only (from face of existing bldg to property line). | $1,500,000 |
| Aug 2, 2023 | In progress issued Nov 2025 | 900 Bush St | Saarman Construction,Ltd. | exterior common area renovation for waterproofing, associated hardscape, and associated landscape at existing plaza decks only. (not visible from street) (e) footprint of (e) building to remain no change.Details
exterior common area renovation for waterproofing, associated hardscape, and associated landscape at existing plaza decks only. (not visible from street) (e) footprint of (e) building to remain no change. | $3,000,000 |
| Nov 9, 2022 | Never finaled issued Nov 2022, no final | 900 Bush St | Pyro-Comm Systems, Inc. | f/a, (6) monitor modules will be added to monitor the generatorDetails
f/a, (6) monitor modules will be added to monitor the generator | $5,000 |
| Jan 25, 2022 | Completed final sign-off Aug 2023 | 900 Bush St | International Fire Equipment Co Incorpor | installation of ul300 fire system into (e) hood, hood & duct & appliance protection.Details
installation of ul300 fire system into (e) hood, hood & duct & appliance protection. | $10,000 |
| Nov 19, 2021 | Never finaled issued Jun 2022, no final | 900 Bush St | R L H Fire Protection Inc | fire sprinkler: indoor mech room: repair/replace (e) electric pump to operate of emergency power. abandon diesel pump in place, (n) revised concrete pad calc included. supplemental to pa202106293400Details
fire sprinkler: indoor mech room: repair/replace (e) electric pump to operate of emergency power. abandon diesel pump in place, (n) revised concrete pad calc included. supplemental to pa202106293400 | $70,477 |
| Jun 29, 2021 | Never finaled issued Feb 2022, no final | 900 Bush St | North American Power & Controls Inc | working in common area. replace generator and fuel tank at (e) terrace level with (n) diesel generator & (n) 658 gallon belly tank. scope includes new fuel port & pipingDetails
working in common area. replace generator and fuel tank at (e) terrace level with (n) diesel generator & (n) 658 gallon belly tank. scope includes new fuel port & piping | $300,000 |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 900 Bush St | Everest Waterproofing & Restoration Inc. | common areas: extending of ends of rails @ balconies @ approximately 50 locations to reduce openings to max 4" (inches)Details
common areas: extending of ends of rails @ balconies @ approximately 50 locations to reduce openings to max 4" (inches) | $38,500 |
| Jan 18, 2018 | Completed final sign-off Mar 2018 | 900 Bush St | R L H Fire Protection Inc | fire sprinkler ti 1 added sidewall sprinkler; 1 replaced sidewall sprinklerDetails
fire sprinkler ti 1 added sidewall sprinkler; 1 replaced sidewall sprinkler | $800 |
| Jul 25, 2014 | Completed final sign-off Aug 2014 | 900 Bush St | R L H Fire Protection Inc | elevator mechanical rooms- remove 2 sprinklers. n/a ordinance #155-13Details
elevator mechanical rooms- remove 2 sprinklers. n/a ordinance #155-13 | $1,000 |
| Jul 9, 2014 | Completed final sign-off Mar 2020 | 900 Bush St | Tri-Signal Integration Inc. | add 2 control modules for helmet lights in elevator cabins for elevator upgrade. maher not requiredDetails
add 2 control modules for helmet lights in elevator cabins for elevator upgrade. maher not required | $1,500 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 900 Bush St | R L H Fire Protection Inc | basement level-fire sprinkler permit-replace 6" back flow preventer in fire pump room with 6' bfp- meter being maintained in underground-Details
basement level-fire sprinkler permit-replace 6" back flow preventer in fire pump room with 6' bfp- meter being maintained in underground- | $5,000 |
| May 10, 2012 | Never finaled issued May 2012, no final | 954 Bush St | Tri-Signal Integration Inc. | 1st floor-add 3 strobe lights & 4 speaker/strobes to (e) fire alarm system in b occupancy.Details
1st floor-add 3 strobe lights & 4 speaker/strobes to (e) fire alarm system in b occupancy. | $3,800 |
| Jan 17, 2012 | Completed final sign-off Sep 2012 | 954 Bush St | remodel 1st floor vacant retail space #954 bush st-convert 1 retail space into 2 retail spaces-1 break room, 1 office & 1 conference room. alter front entrance doorsDetails
remodel 1st floor vacant retail space #954 bush st-convert 1 retail space into 2 retail spaces-1 break room, 1 office & 1 conference room. alter front entrance doors | $20,000 | |
| Nov 1, 2011 | Completed final sign-off Nov 2011 | 940 Bush St | J K M Fire Protection | add 9 new fire sprinklers to massage/spa roomsDetails
add 9 new fire sprinklers to massage/spa rooms | $3,000 |
| Oct 18, 2011 | Expired or cancelled cancelled Sep 2023 | 940 Bush St | Astorga Const Company | install 8 sprinkler heads.Details
install 8 sprinkler heads. | $2,000 |
| Mar 16, 2011 | Completed final sign-off Mar 2011 | 900 Bush St | Britannia Construction, Inc. | for unit #313: address correction from 960 bush st. to 900 bush st. for previous approved permit application #201101218755.Details
for unit #313: address correction from 960 bush st. to 900 bush st. for previous approved permit application #201101218755. | |
| Feb 18, 2011 | Expired or cancelled withdrawn Oct 2011 | 954 Bush St | remodel 1st floor. convert office into 2 retail, 1 break room, 1 office, 1 conference roomDetails
remodel 1st floor. convert office into 2 retail, 1 break room, 1 office, 1 conference room | $20,000 | |
| Jan 28, 2011 | Completed final sign-off Apr 2011 | 940 Bush St | Tri-Signal Integration Inc. | add one(1) speaker, four (4) speaker/strobes & five (5) strobes to existing fire alarm system in beauty salon.Details
add one(1) speaker, four (4) speaker/strobes & five (5) strobes to existing fire alarm system in beauty salon. | $4,500 |
| Nov 12, 2010 | Completed final sign-off Mar 2011 | 940 Bush St | K C Engineering Construction | remodel skin care rooms, remodel restrooms, add body sciub/room.Details
remodel skin care rooms, remodel restrooms, add body sciub/room. | $10,000 |
| Oct 21, 2010 | Expired or cancelled withdrawn Nov 2011 | 954 Bush St | build 50'-0". new wall.Details
build 50'-0". new wall. | $6,000 | |
| Sep 14, 2010 | Expired or cancelled expired May 2020 | 930 Bush St | Tri-Signal Integration Inc. | add one power supply, one speaker/strobe, two strobes to (e) fire alarm systemDetails
add one power supply, one speaker/strobe, two strobes to (e) fire alarm system | $3,200 |
| May 28, 2010 | Never finaled issued May 2010, no final | 930 Bush St | street space permitDetails
street space permit | ||
| Apr 30, 2010 | Completed final sign-off Sep 2010 | 930 Bush St | upgrading finishes for kit., stor. & service area on walls, clg. & flrs. placing flr. drains on these 3-areas: kit., stor. & service area. removing kit. partitions for installing (n) door + relocating (e) door to be used in stor. removing a small portion of wall btw. kit. & stor. to transfer dishes.Details
upgrading finishes for kit., stor. & service area on walls, clg. & flrs. placing flr. drains on these 3-areas: kit., stor. & service area. removing kit. partitions for installing (n) door + relocating (e) door to be used in stor. removing a small portion of wall btw. kit. & stor. to transfer dishes. | $26,473 | |
| May 21, 2009 | Completed final sign-off Jun 2009 | 930 Bush St | to obtain final inspection for work approved under pa#200605252508. all works has been completed.Details
to obtain final inspection for work approved under pa#200605252508. all works has been completed. | ||
| May 5, 2009 | Completed final sign-off Jun 2009 | 930 Bush St | renew pa# 2006/12/22/0471 to obtain final inspection. all work has been completed.Details
renew pa# 2006/12/22/0471 to obtain final inspection. all work has been completed. | ||
| Dec 22, 2006 | Expired or cancelled expired Apr 2009 | 930 Bush St | remove suspended ceiling system, comply with nov# 200670523. install new ada complaint door closer at entry door, install grab bars at toilet, install ada signage. relocattion of sprinkler heads under seperate permit #200605252508.Details
remove suspended ceiling system, comply with nov# 200670523. install new ada complaint door closer at entry door, install grab bars at toilet, install ada signage. relocattion of sprinkler heads under seperate permit #200605252508. | $2,800 | |
| May 25, 2006 | Never finaled issued May 2006, no final | 900 Bush St | streetspaceDetails
streetspace | ||
| May 25, 2006 | Expired or cancelled expired May 2020 | 930 Bush St | Mazzys Fire Protection | change (e) drop spk to upright (ceiling was removed, however space still needs coverage)Details
change (e) drop spk to upright (ceiling was removed, however space still needs coverage) | $3,000 |
| Apr 19, 2004 | Completed final sign-off Apr 2004 | 900 Bush St | Shaughnessy Roofing Inc | renew 9703536 for reroofingDetails
renew 9703536 for reroofing |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- R L H Fire Protection Inc (4), Saarman Construction,Ltd. (4), Tri-Signal Integration Inc. (4), Astorga Const Company, Atelier 19ad6, Britannia Construction, Inc., Everest Waterproofing & Restoration Inc., International Fire Equipment Co Incorpor, J K M Fire Protection, K C Engineering Construction, Mazzys Fire Protection, North American Power & Controls Inc, Pyro-Comm Systems, Inc., Shaughnessy Roofing Inc
- Architects
- Marc Dimalanta (3), Adrian Blanco, Wenda Wang, William Egan
- Engineers
- Akuavi Hine, Bill Lau
- Authorized agent-otherss
- Chih-Cheng Tsai, Lok Chan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.