Abraham Zavala
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Az Design & Engineering Inc
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2002 to Mar 2026
198 permits since 2000 (engineer on 158 permits, architect on 36 permits, authorized agent-others on 4 permits): 107 completed, 6 in progress, 28 never finaled, 57 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 198.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 6, 2026 | Completed final sign-off Sep 2026 | 6101 Geary Bl | Ze Sheng Liao | tenant improvement and change of use retail to gym. install new gym flooring, gym equipment, construction of new bathroom, kitchenette and bottle filling station. infilling of door/storefront, removal of a portion of a wall resulting and installation of new door.Details
tenant improvement and change of use retail to gym. install new gym flooring, gym equipment, construction of new bathroom, kitchenette and bottle filling station. infilling of door/storefront, removal of a portion of a wall resulting and installation of new door. | $100,000 |
| Feb 4, 2026 | In progress filed Feb 2026, not yet issued | 875 Francisco St | add 2 basement levels under (e) building. add elevator that connects (e) garage to all levels. approved variance: 2024-000780var. fire sprinklers under deferred permit.Details
add 2 basement levels under (e) building. add elevator that connects (e) garage to all levels. approved variance: 2024-000780var. fire sprinklers under deferred permit. | $350,000 | |
| Jan 22, 2026 | Completed final sign-off Jul 2026 | 792 Hayes St | to abate nov 202312184- remove (e) 1 hr guardrail /42 inch tall and 3' wide to comply with (e) easementDetails
to abate nov 202312184- remove (e) 1 hr guardrail /42 inch tall and 3' wide to comply with (e) easement | $200 | |
| Oct 30, 2025 | Completed final sign-off Aug 2026 | 6101 Geary Bl | Ze Sheng Liao | remove wood platforms at front of building (inside) remodel e) bathroom to comply w/ accessible requirrments, replace damaged panels of drop 6Details
remove wood platforms at front of building (inside) remodel e) bathroom to comply w/ accessible requirrments, replace damaged panels of drop 6 | $35,000 |
| Apr 23, 2025 | Completed final sign-off Jul 2026 | 156 Ledyard St | Thomas Le Construction Inc | remove existing stair from 2nd fl to garage and install new laundry room on 2nd floorDetails
remove existing stair from 2nd fl to garage and install new laundry room on 2nd floor | $10,000 |
| Mar 25, 2025 | In progress issued May 2025 | 14 Walter St | Gabriel Mena | rebuild ongrade stairs from rear yard to corridor north side of bldg.connect existing footing at south west corner of building,add insulation at crawl space of 1st floor. rebuild exisitng exterior deck at ground floor level, replace 3 windows at 1st floor front of building.Details
rebuild ongrade stairs from rear yard to corridor north side of bldg.connect existing footing at south west corner of building,add insulation at crawl space of 1st floor. rebuild exisitng exterior deck at ground floor level, replace 3 windows at 1st floor front of building. | $10,000 |
| Jan 27, 2025 | In progress issued Feb 2025 | 206 Juanita Wy | Applied General Construction Inc | preliminary renovation of interior lath & plaster at ceiling & partial floor sheathing due to extensive damage and to explore (e) framing to evaluate conditions. no structural workDetails
preliminary renovation of interior lath & plaster at ceiling & partial floor sheathing due to extensive damage and to explore (e) framing to evaluate conditions. no structural work | $10,000 |
| Nov 5, 2024 | In progress filed Nov 2024, not yet issued | 875 Francisco St | build concrete wall to reinforce (e) bay window. wall will be 5.25' long and 6.5' tall. wall will be located 42' away from front property line.Details
build concrete wall to reinforce (e) bay window. wall will be 5.25' long and 6.5' tall. wall will be located 42' away from front property line. | $15,000 | |
| Jul 24, 2024 | Expired or cancelled expired Mar 2026 | 2609 Pine St | Parkin Construction Inc | addition of (n) bathroom and remove (e) non functional fireplace.Details
addition of (n) bathroom and remove (e) non functional fireplace. | $25,000 |
| Jul 24, 2024 | In progress issued Jul 2024 | 875 Francisco St | Parkin Construction Inc | replace all existing windows at all the floors. (same location and size) windows to be wood with aluminum clad for the exterior of the window. windows to be marvin ultimate collection. (14 windows and 1 french door at the front) and (45 windows and 1 french door for the rest of the house) for all.Details
replace all existing windows at all the floors. (same location and size) windows to be wood with aluminum clad for the exterior of the window. windows to be marvin ultimate collection. (14 windows and 1 french door at the front) and (45 windows and 1 french door for the rest of the house) for all. | $80,000 |
| May 31, 2024 | In progress filed May 2024, not yet issued | 1702 Fell St | replace existing emergency interior stairs inkind located at the rear of building.Details
replace existing emergency interior stairs inkind located at the rear of building. | $50,000 | |
| Mar 8, 2024 | Expired or cancelled expired Jun 2026 | 792 Hayes St | replace a section of (e) stairs at the back of the building.Details
replace a section of (e) stairs at the back of the building. | $3,000 | |
| Feb 16, 2024 | Completed final sign-off Feb 2024 | 117 Stonecrest Dr | Applied General Construction Inc | revision to pa 202306220608 construction changes. window @ nw corner of the 1st fl was removed; closet @ bedroom #4 of 1st fl was not built; door to access bedroom #4 was installed on opposite wall; new window @ bedroom #4 (south wall); bath #3 2nd fl door was installed on opposite wallDetails
revision to pa 202306220608 construction changes. window @ nw corner of the 1st fl was removed; closet @ bedroom #4 of 1st fl was not built; door to access bedroom #4 was installed on opposite wall; new window @ bedroom #4 (south wall); bath #3 2nd fl door was installed on opposite wall | $100 |
| Dec 28, 2023 | Completed final sign-off Mar 2026 | 1671 45th Av | A To Z Building | 1)add new bedrooms at 1st floor. 2)eliminate bedroom on 2nd and 3rd floor to extpand extg kitchen. 3)reconfigure bathrooms on 2nd and third floor.Details
1)add new bedrooms at 1st floor. 2)eliminate bedroom on 2nd and 3rd floor to extpand extg kitchen. 3)reconfigure bathrooms on 2nd and third floor. | $20,000 |
| Sep 25, 2023 | Completed final sign-off Mar 2026 | 1671 45th Av | A To Z Building | remodel (4) bathrooms and (2) kitchen in kind. new electrical and plumbing. front facade remodel. new windowsDetails
remodel (4) bathrooms and (2) kitchen in kind. new electrical and plumbing. front facade remodel. new windows | $140,000 |
| Sep 22, 2023 | Completed final sign-off Jun 2024 | 1409 Polk St | A To Z Building | replace all appliance and remove (e) hood and relocate a new one as noted. replace existing interior window. no exterior work.Details
replace all appliance and remove (e) hood and relocate a new one as noted. replace existing interior window. no exterior work. | $20,000 |
| Jul 28, 2023 | Completed final sign-off Oct 2023 | 370 Monterey Bl | Michael & Sons Construction Inc | revision to pa# 202211176780, existing footings for stairs columns & stringers are re-used.Details
revision to pa# 202211176780, existing footings for stairs columns & stringers are re-used. | |
| Jun 28, 2023 | Completed final sign-off Sep 2023 | 262 Waller St | Parkin Construction Inc | revision to 202208050014 to reflect the replacement of 2 existing skylights and the addition of 2 new onesDetails
revision to 202208050014 to reflect the replacement of 2 existing skylights and the addition of 2 new ones | $2,000 |
| Jun 22, 2023 | Completed final sign-off Feb 2024 | 117 Stonecrest Dr | Applied General Construction Inc | rev to bpa#202304135659, reduce window sizes @new kitchen, add bar to kitchen area w/no fixtures, add window @new bathrm, relocate window @bathrm#2-2/f, reduce window bathrm#3, add window @bathrm#1. change shower location bathrm#1, new windows u-factor 0.30. keep door see bpa#200304135659.Details
rev to bpa#202304135659, reduce window sizes @new kitchen, add bar to kitchen area w/no fixtures, add window @new bathrm, relocate window @bathrm#2-2/f, reduce window bathrm#3, add window @bathrm#1. change shower location bathrm#1, new windows u-factor 0.30. keep door see bpa#200304135659. | $2,000 |
| Apr 27, 2023 | Never finaled issued Jun 2023, no final | 1322 Baker St | Thomas Le Construction Inc | revision to permit 202009013139. the proposed 2nd unit will be reduced in size to allow for one car garage.Details
revision to permit 202009013139. the proposed 2nd unit will be reduced in size to allow for one car garage. | |
| Apr 20, 2023 | Never finaled issued Jul 2023, no final | 557 Duboce Av | Gabriel Mena, Mg And Jc Concrete Inc. | temporary excavation to facilitate the construction of a retaining wall at 14 walter street (adjacent property). after the retaining wall is completed the soil will be restored to original condition. revision to 202208311640. to comply with nov 202293109Details
temporary excavation to facilitate the construction of a retaining wall at 14 walter street (adjacent property). after the retaining wall is completed the soil will be restored to original condition. revision to 202208311640. to comply with nov 202293109 | $1,500 |
| Apr 13, 2023 | Completed final sign-off Feb 2024 | 117 Stonecrest Dr | Applied General Construction Inc | remove one parking spot to create 2 bedrooms and bathroom, and add a 1/2 bathroom, relocate (e) kitchenDetails
remove one parking spot to create 2 bedrooms and bathroom, and add a 1/2 bathroom, relocate (e) kitchen | $100,000 |
| Mar 31, 2023 | Completed final sign-off Dec 2023 | 3342 Steiner St | Thomas Le Construction Inc | revision to pa: 201905302053 and 202110180636. layout was revised to keep more of the removed walls.Details
revision to pa: 201905302053 and 202110180636. layout was revised to keep more of the removed walls. | $2,000 |
| Feb 7, 2023 | Expired or cancelled cancelled Jan 2026 | 117 Stonecrest Dr | remodel bathrooms (2) @ 2nd fl; reduce size of master bathroom to create a 3rd bathroom. no structural work is proposedDetails
remodel bathrooms (2) @ 2nd fl; reduce size of master bathroom to create a 3rd bathroom. no structural work is proposed | $40,000 | |
| Jan 11, 2023 | Completed final sign-off Jul 2026 | 156 Ledyard St | Thomas Le Construction Inc | add one adu at ground floor (~575 sqft). building envelope remains the same.Details
add one adu at ground floor (~575 sqft). building envelope remains the same. | $150,000 |
| Dec 2, 2022 | Completed final sign-off Oct 2026 | 20 Wayne Pl | Golden State Marble And Construction Inc | g/f: remove (e) one of the 2 off-street parking space and create a rear yard addition for a new dwelling unit at the (e) 1/f, approx 675sf.Details
g/f: remove (e) one of the 2 off-street parking space and create a rear yard addition for a new dwelling unit at the (e) 1/f, approx 675sf. | $100,000 |
| Nov 22, 2022 | Expired or cancelled cancelled Jan 2026 | 2554 Bryant St | replace (e) rear stairs in-kindDetails
replace (e) rear stairs in-kind | $30,000 | |
| Nov 1, 2022 | Completed final sign-off Dec 2022 | 1900 Irving St | Applied General Construction Inc | revision 202108307437 to reduce existing occupancy load of 128 down to 99, the rest of the scope will remain the same.Details
revision 202108307437 to reduce existing occupancy load of 128 down to 99, the rest of the scope will remain the same. | |
| Aug 18, 2022 | Expired or cancelled expired Oct 2025 | 14 Walter St | Gabriel Mena, Mg And Jc Concrete Inc. | replace about 28' of (e) founation on the north side of the building. the new footing will be the same location as the old one. correct nov 202292996. temp shoring.Details
replace about 28' of (e) founation on the north side of the building. the new footing will be the same location as the old one. correct nov 202292996. temp shoring. | $30,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2023 | 262 Waller St | Parkin Construction Inc | (n) int structural framing create a (n) shared entry in the (e) bldg envelope. (n) electrical and lighting. demo two side wall windows, not visible from the street. add a rear landing in the required yard, less than 3' above grade. no other exterior changes. no changes to the front facade.Details
(n) int structural framing create a (n) shared entry in the (e) bldg envelope. (n) electrical and lighting. demo two side wall windows, not visible from the street. add a rear landing in the required yard, less than 3' above grade. no other exterior changes. no changes to the front facade. | $179,000 |
| Aug 2, 2022 | Completed final sign-off Sep 2022 | 591 Diamond St | Thomas Le Construction Inc | revision to permit 202008222397. bathroom at 1/f was not constructed. the space for a bathtub on the 2/f bathroom was split for a shower and a sink.Details
revision to permit 202008222397. bathroom at 1/f was not constructed. the space for a bathtub on the 2/f bathroom was split for a shower and a sink. | |
| Jul 6, 2022 | Never finaled issued Nov 2022, no final | 5017 Diamond Heights Bl | Gabriel Mena | replace (e) driveway in-kind due to dry rot damage on supporing framing. driveway is 46.25' x 11.75'Details
replace (e) driveway in-kind due to dry rot damage on supporing framing. driveway is 46.25' x 11.75' | $30,000 |
| Apr 19, 2022 | Completed final sign-off Jan 2024 | 254 28th St | Parkin Construction Inc | front bldg -to comply with nov#202010302. legalize wet bar and bathroom at 2/f. remove illegal bathroom & bedroom at 1/fDetails
front bldg -to comply with nov#202010302. legalize wet bar and bathroom at 2/f. remove illegal bathroom & bedroom at 1/f | $50,000 |
| Nov 3, 2021 | Never finaled filed Nov 2021, never issued | 2770 Harrison St | rear yard addition @ 2/f & 3/f of the middle half of the north building. interior remodel @ a/f & 3/f of units 2 & 4 located in the sane half of north building.Details
rear yard addition @ 2/f & 3/f of the middle half of the north building. interior remodel @ a/f & 3/f of units 2 & 4 located in the sane half of north building. | $150,000 | |
| Oct 20, 2021 | Never finaled issued Nov 2021, no final | 1708 Broderick St | Imd Home Design Inc | enlarge (e) garage door nu 9" to the north and increase height by 4"Details
enlarge (e) garage door nu 9" to the north and increase height by 4" | $12,000 |
| Sep 20, 2021 | Completed final sign-off Nov 2021 | 1339 04th Av | revision to pa 2017-1107-3330 - add 30" of wall at north property line under balconies as requested by building inspectorDetails
revision to pa 2017-1107-3330 - add 30" of wall at north property line under balconies as requested by building inspector | $2,000 | |
| Sep 16, 2021 | Completed final sign-off Oct 2021 | 572 Castro St | Gabriel Mena | dph review only because dph was bypassed under pa 2021-0614-2357Details
dph review only because dph was bypassed under pa 2021-0614-2357 | |
| Sep 8, 2021 | Expired or cancelled revoked Dec 2021 | 792 Hayes St | replace in kind bottom set of stairs due to dry rot.Details
replace in kind bottom set of stairs due to dry rot. | $7,500 | |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 572 Castro St | reduce (e) office space to increase area of (e) washing room. (e) dish washing room to be relocated using same equipment. addition of ada push button at front facade, no other exterior changes.Details
reduce (e) office space to increase area of (e) washing room. (e) dish washing room to be relocated using same equipment. addition of ada push button at front facade, no other exterior changes. | $15,000 | |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 1930 33rd Av | Thomas Le Construction Inc | remove existing bearing wall between kitchen & living room. kitchen remodel.Details
remove existing bearing wall between kitchen & living room. kitchen remodel. | $20,000 |
| Apr 5, 2021 | Completed final sign-off Jun 2021 | 2250 Jackson St | to obtain final inspection for work approved under permit application 2011-0113-8339Details
to obtain final inspection for work approved under permit application 2011-0113-8339 | ||
| Dec 1, 2020 | Never finaled filed Dec 2020, never issued | 1433 09th Av | replace existing rear stairs in-kind up to code. replacement is due to dryrot throughout the stairs.Details
replace existing rear stairs in-kind up to code. replacement is due to dryrot throughout the stairs. | $25,000 | |
| Sep 28, 2020 | Never finaled filed Sep 2020, never issued | 3354 Cesar Chavez St | build new roof deck about 750 sq ft. build new interior stairs to connect top floor with roof deck. rebuild existing rear emergency stairs to proposed new roof deck.Details
build new roof deck about 750 sq ft. build new interior stairs to connect top floor with roof deck. rebuild existing rear emergency stairs to proposed new roof deck. | $45,000 | |
| Sep 19, 2020 | Completed final sign-off Mar 2021 | 3326 Vicente St | add new rear yard deck about 9.5' x 11.75'. deck to be away from property lines. height above ground is 8.7'. deck w/ stairs to rear yard.Details
add new rear yard deck about 9.5' x 11.75'. deck to be away from property lines. height above ground is 8.7'. deck w/ stairs to rear yard. | $12,000 | |
| Sep 19, 2020 | Completed final sign-off Mar 2022 | 1264 Treat Av | Parkin Construction Inc | replace brick foundation around garage application is a revision to pa 201712227320.Details
replace brick foundation around garage application is a revision to pa 201712227320. | $30,000 |
| Sep 1, 2020 | Never finaled issued Aug 2022, no final | 1322 Baker St | Thomas Le Construction Inc | add new second dwelling unit @ first floor(852 sqf).unit will be within the footprint of building. existing garage & existing driveway to be removed.Details
add new second dwelling unit @ first floor(852 sqf).unit will be within the footprint of building. existing garage & existing driveway to be removed. | $200,000 |
| Aug 22, 2020 | Completed final sign-off Sep 2022 | 591 Diamond St | Thomas Le Construction Inc | interior remodel at first, second and third floors. no expansion of existing envelope.Details
interior remodel at first, second and third floors. no expansion of existing envelope. | $300,000 |
| Mar 12, 2020 | Expired or cancelled cancelled Jan 2026 | 4239 Geary Bl | to comply with the mandatory accessible business entrance program per ordinance 51-16. rebuild access landing, install automatic door openers & 10" kick plate or replace door.Details
to comply with the mandatory accessible business entrance program per ordinance 51-16. rebuild access landing, install automatic door openers & 10" kick plate or replace door. | $10,000 | |
| Mar 12, 2020 | Expired or cancelled cancelled Jan 2026 | 4237 Geary Bl | to comply with the mandatory accessible business entrance program per ordinance 51-16. rebuild access landing, install automatic door openers & 10" kick plate or replace door.Details
to comply with the mandatory accessible business entrance program per ordinance 51-16. rebuild access landing, install automatic door openers & 10" kick plate or replace door. | $10,000 | |
| Mar 6, 2020 | Completed final sign-off May 2022 | 3621 Broderick St | Kai Construction Inc | remove existing stairs at rear deck. maher not req.Details
remove existing stairs at rear deck. maher not req. | $15,000 |
| Mar 6, 2020 | Never finaled issued Mar 2020, no final | 1717 Alabama St | Gabriel Mena | replace (e) footings at north-east west side of the houseDetails
replace (e) footings at north-east west side of the house | $50,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2021 | 3291 Cesar Chavez St | rebuild front wall at 1st fl due to car crash. remove front wall at 1st floor. remove 8'-7'h garage door. rebuild front wall at 1st floor. install (n) 8'-7'h garage door. nov #202017761 to be addressed under separate permit.Details
rebuild front wall at 1st fl due to car crash. remove front wall at 1st floor. remove 8'-7'h garage door. rebuild front wall at 1st floor. install (n) 8'-7'h garage door. nov #202017761 to be addressed under separate permit. | $50,000 | |
| Feb 11, 2020 | Expired or cancelled cancelled Jan 2026 | 5 Masonic Av | comply with abe - mandatory disability access improvement program. rebuild front landing to eliminate cracks, remove stopper and self closure deviceDetails
comply with abe - mandatory disability access improvement program. rebuild front landing to eliminate cracks, remove stopper and self closure device | $5,000 | |
| Feb 11, 2020 | Expired or cancelled cancelled Jan 2026 | 15 Masonic Av | comply with mandatory disability access improvement program. replace front door and hardware.Details
comply with mandatory disability access improvement program. replace front door and hardware. | $5,000 | |
| Feb 11, 2020 | Expired or cancelled cancelled Jan 2026 | 21 Masonic Av | scope of work to comply with the mandatory disability access improvement program. replace front door and hardware. new doors to be 6'8Details
scope of work to comply with the mandatory disability access improvement program. replace front door and hardware. new doors to be 6'8 | $5,000 | |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 2448 Great Hy | to renew pa #201609198134 for recommencement of remaining work.Details
to renew pa #201609198134 for recommencement of remaining work. | $10,000 | |
| Dec 3, 2019 | Expired or cancelled cancelled Jan 2026 | 1339 04th Av | voluntary crawl space strengthening, add plywood & anchor bolts to crawl space wallsDetails
voluntary crawl space strengthening, add plywood & anchor bolts to crawl space walls | $5,000 | |
| Oct 8, 2019 | Expired or cancelled withdrawn Nov 2019 | 262 22nd Av | revision to 201508043325 replace column at moment frame b1 from w 12x40 to new w 10x54Details
revision to 201508043325 replace column at moment frame b1 from w 12x40 to new w 10x54 | ||
| Sep 5, 2019 | Never finaled issued Jun 2022, no final | 100 Clement St | Parkin Construction Inc | change of use of (e) 3rd fl (vacant) from commercial (office) to residential (one unit)Details
change of use of (e) 3rd fl (vacant) from commercial (office) to residential (one unit) | $150,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2020 | 375 Vallejo St | revision to pa 2019-0703-5088 page s-1 was modified due to dry rot @ (e)8x8 post, replace the top portion & splice w/ 'c' channelsDetails
revision to pa 2019-0703-5088 page s-1 was modified due to dry rot @ (e)8x8 post, replace the top portion & splice w/ 'c' channels | $1,000 | |
| May 29, 2019 | Never finaled filed May 2019, never issued | 1365 York St | 2 story rear addition @ the rear of the building. the lower floor is 544 sf & upper floor 244 sf of 241 of deck area. add 1 extra bedroom @ each floor.Details
2 story rear addition @ the rear of the building. the lower floor is 544 sf & upper floor 244 sf of 241 of deck area. add 1 extra bedroom @ each floor. | $200,000 | |
| Apr 26, 2019 | Expired or cancelled cancelled Jan 2026 | 1122 Sutter St | to comply with the mandatory accessibility program for commercial building (main entry)Details
to comply with the mandatory accessibility program for commercial building (main entry) | $7,500 | |
| Apr 26, 2019 | Expired or cancelled cancelled Jan 2026 | 1128 Sutter St | to comply with the mandatory accessibility program for commercial building (main entry)Details
to comply with the mandatory accessibility program for commercial building (main entry) | $7,500 | |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 25 West Portal Av | to comply with mandatory disability accessible entrance program per ord 51-16Details
to comply with mandatory disability accessible entrance program per ord 51-16 | $15,000 | |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 183 Golden Gate Av | to comply with accessible business entrance program per ord 51-16Details
to comply with accessible business entrance program per ord 51-16 | $5,000 | |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 191 Golden Gate Av | to comply with accessible business entrance program per ord 51-16Details
to comply with accessible business entrance program per ord 51-16 | $5,000 | |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 29 West Portal Av | to comply with mandatory disability accessible entrance program per ord 51-16Details
to comply with mandatory disability accessible entrance program per ord 51-16 | $5,000 | |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 187 Golden Gate Av | to comply with accessible business entrance program per ord 51-16Details
to comply with accessible business entrance program per ord 51-16 | $5,000 | |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 177 Golden Gate Av | to comply with accessible business entrance program per ord 51-16 & replace (e) security gate that opens into public way w/ code compliant gate as per plans.Details
to comply with accessible business entrance program per ord 51-16 & replace (e) security gate that opens into public way w/ code compliant gate as per plans. | $12,000 | |
| Dec 13, 2018 | Completed final sign-off Aug 2019 | 4229 Cabrillo St | Parkin Construction Inc | to comply with nov 201879341 - remove bathroom, sink & partitions wall at 1st floorDetails
to comply with nov 201879341 - remove bathroom, sink & partitions wall at 1st floor | $3,000 |
| Dec 6, 2018 | Completed final sign-off Dec 2019 | 328 Castro St | Seismic Retrofitters Inc. | mandatory soft story retrofit per sfebc chapter 4d. engineering criteria 2016 cebc appendix a-4Details
mandatory soft story retrofit per sfebc chapter 4d. engineering criteria 2016 cebc appendix a-4 | $20,000 |
| Oct 30, 2018 | Completed final sign-off Nov 2020 | 1429 14th Av | Andino Construction | build (2) (n) decks @ rear yard, deck on 2nd fl to be 10.75'x14.5' stairs to rear yard. deck @ 3rd fl to be 10.75'x9', decks to be build within the allowable building areaDetails
build (2) (n) decks @ rear yard, deck on 2nd fl to be 10.75'x14.5' stairs to rear yard. deck @ 3rd fl to be 10.75'x9', decks to be build within the allowable building area | $35,000 |
| Oct 24, 2018 | Expired or cancelled cancelled Jan 2026 | 75 Magellan Av | install french drain in front of the house and new elevator connecting 1st floor and lower floor. redo frontplanters. reinforce existing interior 3 feet retaining wallDetails
install french drain in front of the house and new elevator connecting 1st floor and lower floor. redo frontplanters. reinforce existing interior 3 feet retaining wall | $50,000 | |
| Sep 24, 2018 | Never finaled filed Sep 2018, never issued | 1353 Grant Av | b/f -existing storage will become an extension of lounge/bar to the existing bar located on the 1st floor. mep under separate permitDetails
b/f -existing storage will become an extension of lounge/bar to the existing bar located on the 1st floor. mep under separate permit | $100,000 | |
| Jul 25, 2018 | Completed final sign-off Oct 2018 | 2120 Larkin St | Baires Construction Inc | revision to pa 2014-1229-4642 of the shear walls were adjusted in size and steel frame connection modifiedDetails
revision to pa 2014-1229-4642 of the shear walls were adjusted in size and steel frame connection modified | $1,000 |
| Jul 25, 2018 | Never finaled issued Aug 2018, no final | 395 Frederick St | C N A Construction | apartment 2 on ground floor - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent)Details
apartment 2 on ground floor - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent) | $30,000 |
| Jul 25, 2018 | Never finaled issued Aug 2018, no final | 395 Frederick St | C N A Construction | apartment 6 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent)Details
apartment 6 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent) | $30,000 |
| Jul 25, 2018 | Never finaled issued Sep 2018, no final | 395 Frederick St | C N A Construction | on 2nd floor - apartment 4 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent)Details
on 2nd floor - apartment 4 - relocate (e) kitchen, remodel existing bathroom, convert existing kitchen into a new bedroom and install 3 new fireplaces (direct vent) | $30,000 |
| Jul 3, 2018 | Completed final sign-off Nov 2018 | 410 Bay Shore Bl | Sincere Construction Company Inc | renew pa# 201512296067 for final inspection. all work is completeDetails
renew pa# 201512296067 for final inspection. all work is complete | |
| Nov 7, 2017 | Completed final sign-off Nov 2021 | 1339 04th Av | replace (e) decks/stairs at the rear of the bldg. decks to keep same size. (n) fire walls (1-hr) at north & south property lines. enclose space under lower deck.Details
replace (e) decks/stairs at the rear of the bldg. decks to keep same size. (n) fire walls (1-hr) at north & south property lines. enclose space under lower deck. | $50,000 | |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 2262 Market St | commercial- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
commercial- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $20,000 | |
| Sep 15, 2017 | Expired or cancelled withdrawn May 2025 | 2256 Market St | residential- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
residential- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $40,000 | |
| Sep 15, 2017 | Expired or cancelled withdrawn May 2025 | 2258 Market St | commercial- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
commercial- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $40,000 | |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 2260 Market St | residential #a,b,c,d,e,f- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
residential #a,b,c,d,e,f- soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $60,000 | |
| Sep 14, 2017 | Completed final sign-off Nov 2020 | 350 Laguna Honda Bl | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $55,000 | |
| Sep 14, 2017 | Expired or cancelled cancelled Jan 2026 | 1040 Ashbury St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $60,000 | |
| Sep 14, 2017 | Expired or cancelled withdrawn Jun 2018 | 848 Ashbury St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $50,000 | |
| Sep 14, 2017 | Completed final sign-off Apr 2020 | 201 Waller St | Sft Construction Corp | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $50,000 |
| Sep 14, 2017 | Completed final sign-off Jul 2020 | 3909 17th St | Sft Construction Corp | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 | $75,000 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 2839 Mission St | install evacuation signs on the 2nd flDetails
install evacuation signs on the 2nd fl | $500 | |
| Feb 2, 2017 | Completed final sign-off Mar 2017 | 3835 19th St | C N A Construction | install evacuation plan signs at each floor of the buildingDetails
install evacuation plan signs at each floor of the building | $3,000 |
| Dec 23, 2016 | Completed final sign-off Aug 2017 | 83 Walter St | C N A Construction | apt #r: kitchen and bathroom remodel & the installation of 3 fire places.Details
apt #r: kitchen and bathroom remodel & the installation of 3 fire places. | $30,000 |
| Oct 20, 2016 | Never finaled issued Mar 2018, no final | 327 Ordway St | third floor addition to an (e) single dwelling unit with 2 floors of occupancy. 1 bedroom with full bath.Details
third floor addition to an (e) single dwelling unit with 2 floors of occupancy. 1 bedroom with full bath. | $70,000 | |
| Sep 19, 2016 | Expired or cancelled expired Nov 2023 | 2448 Great Hy | seismic retrofit of 1st fl to comply with soft story program. procedure used 2012 iebc a403.3Details
seismic retrofit of 1st fl to comply with soft story program. procedure used 2012 iebc a403.3 | $100,000 | |
| Aug 26, 2016 | Completed final sign-off Aug 2017 | 39 Molimo Dr | Sf Town Builders Inc | interior remodel to baths and kitchen. replae e furnace water heater and all exterior windows. replace/add new lights. remove some interior walls. new full bath, bedroom and computer room at gr flDetails
interior remodel to baths and kitchen. replae e furnace water heater and all exterior windows. replace/add new lights. remove some interior walls. new full bath, bedroom and computer room at gr fl | $60,000 |
| Jul 29, 2016 | Never finaled issued Aug 2016, no final | 3438 Balboa St | remodel one of the bathrooms at the same location - relocate (e) 2nd bathroom, new relocated bathroom to be handicap. new lighting and entry door (ti)Details
remodel one of the bathrooms at the same location - relocate (e) 2nd bathroom, new relocated bathroom to be handicap. new lighting and entry door (ti) | $30,000 | |
| Jul 21, 2016 | Completed final sign-off Sep 2020 | 3438 Balboa St | change of use - from dry cleaning to a new restaurant - t/i for new restaurant, occupancy less than 49. previous use of space was dry cleaners (pick up and delivery) onlyDetails
change of use - from dry cleaning to a new restaurant - t/i for new restaurant, occupancy less than 49. previous use of space was dry cleaners (pick up and delivery) only | $75,000 | |
| Jul 20, 2016 | Never finaled issued Aug 2016, no final | 3464 19th St | Sf Town Builders Inc | adding equipment to bar basement, ice maker, freezer, sink. cover part of basement walls with frp panels for easy cleaning and cover joists with gypsum boardDetails
adding equipment to bar basement, ice maker, freezer, sink. cover part of basement walls with frp panels for easy cleaning and cover joists with gypsum board | $15,000 |
| Jun 22, 2016 | Expired or cancelled withdrawn Sep 2018 | 1166 Jackson St | rebuild in kind existing rear stairs. new stairs to comply with current codesDetails
rebuild in kind existing rear stairs. new stairs to comply with current codes | $30,000 | |
| Apr 12, 2016 | Completed final sign-off May 2016 | 71 Williams Av | reduce scope of work noted on 201510079147. steel column and footing would not be installed therefore 4 spec ial inspections not requiredDetails
reduce scope of work noted on 201510079147. steel column and footing would not be installed therefore 4 spec ial inspections not required |