Block 1270, lot 033
848 Ashbury St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 6,050 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2022 | Never finaled issued Jun 2022, no final | 848 Ashbury St | Central Bay Roofing & Restoration Inc | reroofing.Details
reroofing. | $7,498 |
| Sep 24, 2021 | Completed final sign-off Oct 2023 | 848 Ashbury St | J&R Construction And Painting Inc | comply with nov 202180154 items 3,5,10 and 17. install tradesman door rear to replace existing same size. electrical outlet new. new vent for dryer to (e) lightwell open to sky. remove and replace sheetrock with fire rated sheetrock. install dryer per cmc 504.4 & 502.2.1Details
comply with nov 202180154 items 3,5,10 and 17. install tradesman door rear to replace existing same size. electrical outlet new. new vent for dryer to (e) lightwell open to sky. remove and replace sheetrock with fire rated sheetrock. install dryer per cmc 504.4 & 502.2.1 | $4,200 |
| Jul 23, 2018 | Completed final sign-off May 2020 | 848 Ashbury St | C N A Construction | soft story retrofit-madatory. chapter 4d-2016 cebc appendix a-4Details
soft story retrofit-madatory. chapter 4d-2016 cebc appendix a-4 | $50,000 |
| Sep 14, 2017 | Expired or cancelled withdrawn Jun 2018 | 848 Ashbury St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $50,000 | |
| Oct 22, 2014 | Completed final sign-off Nov 2014 | 848 Ashbury St | C N A Construction | #5- installation of new direct vent gas fireplace at 3rd floor.Details
#5- installation of new direct vent gas fireplace at 3rd floor. | $5,000 |
| Sep 3, 2014 | Completed final sign-off Oct 2014 | 848 Ashbury St | Lingruen Associates | perform repairs as per lingruen assoc. termite report #64307 item#1a, 3a, 3b. for dry rot repair of basement wall, roof decks.Details
perform repairs as per lingruen assoc. termite report #64307 item#1a, 3a, 3b. for dry rot repair of basement wall, roof decks. | $28,550 |
| Jul 14, 2004 | Completed final sign-off Sep 2004 | 848 Ashbury St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $4,980 |
| Aug 30, 2000 | Completed final sign-off Sep 2000 | 848 Ashbury St | Richard Sheridan | repair landing on rear staircase, replace joistand t& g flooringDetails
repair landing on rear staircase, replace joistand t& g flooring | $800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C N A Construction (2), Central Bay Roofing & Restoration Inc, J&R Construction And Painting Inc, Lingruen Associates, Richard Sheridan, Tom Lee Roofing Inc.
- Engineers
- Abraham Zavala, Gregory Paul Wallace
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.