Block 5596, lot 017D
410 Bay Shore Blvd
- City’s use
- Industrial
- Built
- 1950
- Stories
- 2
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 13,600 sq ft
- Lot
- 6,525 sq ft
- Zoning
- PDR2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2018 | Completed final sign-off Nov 2018 | 410 Bay Shore Bl | Sincere Construction Company Inc | renew pa# 201512296067 for final inspection. all work is completeDetails
renew pa# 201512296067 for final inspection. all work is complete | |
| May 25, 2018 | Completed final sign-off Dec 2018 | 410 Bay Shore Bl | revision to 201712267390 interior revision to 2nd fl bath, exit corridor at 1st fl south side; maher not reqDetails
revision to 201712267390 interior revision to 2nd fl bath, exit corridor at 1st fl south side; maher not req | $10,000 | |
| May 18, 2018 | Completed final sign-off Jun 2018 | 410 Bay Shore Bl | Metropolitan Fire Systems | ref: 201712267390: add sprinkler heads & augment existing, wet type fire sprinkler system in existing 2-story, 6,526 sq ft building to accommodate the new wall partitions of new tenant space. 27 new sprinklers.Details
ref: 201712267390: add sprinkler heads & augment existing, wet type fire sprinkler system in existing 2-story, 6,526 sq ft building to accommodate the new wall partitions of new tenant space. 27 new sprinklers. | $16,000 |
| Jan 12, 2018 | Never finaled issued Mar 2018, no final | 410 Bay Shore Bl | install electric "city church" wall signDetails
install electric "city church" wall sign | $10,000 | |
| Dec 26, 2017 | Completed final sign-off Dec 2018 | 410 Bay Shore Bl | Forrest Bodily | change of use from former m use occupancy to a-3 occupancy new church moving into (e) space maher naDetails
change of use from former m use occupancy to a-3 occupancy new church moving into (e) space maher na | $10,000 |
| Apr 12, 2016 | Expired or cancelled expired Apr 2018 | 410 Bay Shore Bl | Sincere Construction Company Inc | revision to 2015-1229-6067 to reflect construction changes due to unforseen condition and modification to collector. new beam added to reinforce floorDetails
revision to 2015-1229-6067 to reflect construction changes due to unforseen condition and modification to collector. new beam added to reinforce floor | $10,000 |
| Dec 29, 2015 | Expired or cancelled expired Apr 2018 | 410 Bay Shore Bl | Sincere Construction Company Inc | remove existing front wall at main entry and create new glass frontage and build new handicap bathroom & 75% open metal roll-up door. relocate kitchen to (e) office space.Details
remove existing front wall at main entry and create new glass frontage and build new handicap bathroom & 75% open metal roll-up door. relocate kitchen to (e) office space. | $30,000 |
| Sep 17, 2014 | Expired or cancelled expired Apr 2018 | 410 Bay Shore Bl | C G Adams Construction | commencement of work not started under previously approved permit application, pa#201305237792Details
commencement of work not started under previously approved permit application, pa#201305237792 | $50,000 |
| May 23, 2013 | Expired or cancelled expired Mar 2016 | 410 Bay Shore Bl | remove (e) garage door & install storefront certain windows & doors. add restroom & 1-hr wall in (e) ground floor (warehouse area).Details
remove (e) garage door & install storefront certain windows & doors. add restroom & 1-hr wall in (e) ground floor (warehouse area). | $20,000 | |
| Dec 2, 2010 | Expired or cancelled expired Mar 2016 | 410 Bay Shore Bl | Aaron Enterprise Inc. | installing a new lightbox sign & led sign on the front of the building wall.Details
installing a new lightbox sign & led sign on the front of the building wall. | $1,500 |
| May 15, 2008 | Completed final sign-off Aug 2008 | 410 Bay Shore Bl | San Francisco Fire Protection | 1 fire panel for water flow monitoring with 1 manual pull, 1 horn strobes, and 1 smoke detector.Details
1 fire panel for water flow monitoring with 1 manual pull, 1 horn strobes, and 1 smoke detector. | $2,500 |
| Sep 6, 2007 | Completed final sign-off Aug 2008 | 410 Bay Shore Bl | install three a/c units on roof (ref pa# 200305084055)Details
install three a/c units on roof (ref pa# 200305084055) | $40,000 | |
| Mar 13, 2007 | Completed final sign-off Aug 2008 | 410 Bay Shore Bl | Ruby Plumbing & Electrical | installation of new fire sprinkler to convorm with nfpa 13 1999 and city of sf building and fire dept. requirement 142 (n) sprinklers.Details
installation of new fire sprinkler to convorm with nfpa 13 1999 and city of sf building and fire dept. requirement 142 (n) sprinklers. | $28,000 |
| May 8, 2003 | Completed final sign-off Apr 2016 | 410 Bay Shore Bl | Avalon Construction Co | horizontal addition on 2 floors, non-conditioned space. sprinkler under separate permit.Details
horizontal addition on 2 floors, non-conditioned space. sprinkler under separate permit. | $380,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sincere Construction Company Inc (3), Aaron Enterprise Inc., Avalon Construction Co, C G Adams Construction, Forrest Bodily, Metropolitan Fire Systems, Ruby Plumbing & Electrical, San Francisco Fire Protection
- Authorized agents
- Abraham Zavala
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.