How long do building permits take in San Francisco's Visitacion Valley neighborhood?

In the Visitacion Valley neighborhood of San Francisco, of the 168 building permits filed from October 2025 through September 2026 that have been issued, half were issued within 0 days, the same as a year earlier. Of the 146 permits filed from October 2023 through September 2024 that have reached final sign-off, half did so within 70 days of being issued, down from 96 days the year before.

From the city’s permit records, by the quarter each permit was filed. Data as of 23 November 2026. How to cite this · How this is calculated

How long until a permit is issued, and until final sign-off?

How long building permits take in San Francisco's VisitacionValley neighborhoodMedian days from filing to permit issuedMedian days from issue to final sign-offToo recent to judge0501001502002503002017201820192020202120222023202420252026DaysSource: San Francisco Department of Building Inspection permit data via DataSF, analysis by Permit Graph(permitgraph.org), CC BY 4.0.www.permitgraph.org/neighborhoods/visitacion-valley · Data as of 23 November 2026By the quarter the permit was filed. A median counts only permits that finished the stage, so recent quarterslook faster than they will end up. Gaps: fewer than 5 permits.

This chart as an image (SVG), with its title, source and date, free to embed under CC BY 4.0.

At a glance

StagePermits filedPermits countedMedian daysCounted a year earlierMedian a year earlier
Filed to permit issuedOctober 2025 through September 2026168 issued0218 issued0
Permit issued to final sign-offOctober 2023 through September 2024146 finished70120 finished96

“Counted” is the permits the median was taken over: those filed in the window that have been issued, or that have reached final sign-off. The first stage covers the last four complete quarters, since most permits are issued within the year. The second covers the last four quarters that ended two or more years ago, so that most of their permits have had time to finish. Citywide, the median was 0 days to issue and 99 days from issue to final over the same quarters. See every quarter since 2000.

Every quarter since 2000 (108 quarters)

One row for each quarter in which permits were filed, newest first. To see whether permits are getting faster or slower, read the two median columns down the page; “too recent” quarters have not had time to finish, so their medians run low.

Quarter filedFiledIssuedMedian days to issueSlowest 10%Reached finalMedian days issue to finalSlowest 10%Never finaledSettled
2026-Q4201021020too recent
2026-Q32922014741870too recent
2026-Q272622262534810too recent
2026-Q1463705618531840too recent
2025-Q4504709734513080too recent
2025-Q3504907736492920too recent
2025-Q2535303237473060too recent
2025-Q1585706341272220too recent
2024-Q4625902245442710too recent
2024-Q3585405042521750yes
2024-Q2514807737762900yes
2024-Q14138074331393600yes
2023-Q44946020534664095yes
2023-Q34543045308064211yes
2023-Q24343013324241411yes
2023-Q14742023197221424yes
2022-Q4565071733923342110yes
2022-Q34744085381086037yes
2022-Q2383502652412755912yes
2022-Q1343101223383207yes
2021-Q44036016227834628yes
2021-Q34842044335939611yes
2021-Q231270379181608988yes
2021-Q13429079237043311yes
2020-Q4615503494113470515yes
2020-Q34946072307628715yes
2020-Q28526243yes
2020-Q158550507314347819yes
2019-Q4575402473511757816yes
2019-Q3626101264212875518yes
2019-Q2444301143210157112yes
2019-Q155530124272971,03422yes
2018-Q475700504714743423yes
2018-Q36765010455834416yes
2018-Q2747011285519931115yes
2018-Q1494701192915742716yes
2017-Q449460106236837823yes
2017-Q3545100356730015yes
2017-Q25044016630911,21010yes
2017-Q134320592010159414yes
2016-Q44945023237980019yes
2016-Q343410122111036815yes
2016-Q23935040171121,09118yes
2016-Q142360232313435911yes
2015-Q433320201416663416yes
2015-Q35450027299756319yes
2015-Q252450335226532722yes
2015-Q129280121811040410yes
2014-Q437360672510786710yes
2014-Q34038092410839913yes
2014-Q2413601,7072013846813yes
2014-Q1454306307025213yes
2013-Q4363604247437812yes
2013-Q34947024269424218yes
2013-Q23734012237846412yes
2013-Q1373501227927711yes
2012-Q4414105236138116yes
2012-Q3464402315514914yes
2012-Q23938084271093568yes
2012-Q124240318623825yes
2011-Q43029028145013513yes
2011-Q334340023814107yes
2011-Q23939028266318211yes
2011-Q1342809017914529yes
2010-Q4484506246026118yes
2010-Q3444409334119010yes
2010-Q245410528903119yes
2010-Q13634010186625615yes
2009-Q44339028227223918yes
2009-Q3403705234618815yes
2009-Q2444205237533217yes
2009-Q1504905334818313yes
2008-Q455500124306420818yes
2008-Q3565506294322320yes
2008-Q2504901263615620yes
2008-Q1686203359021123yes
2007-Q436360625844159yes
2007-Q36663050339234126yes
2007-Q2494602311002469yes
2007-Q1494600235827417yes
2006-Q447460738209652015yes
2006-Q3575400295718412yes
2006-Q26059073359732815yes
2006-Q1444400254125814yes
2005-Q4737200406521116yes
2005-Q37974004612226717yes
2005-Q255520362351803337yes
2005-Q157560723110931118yes
2004-Q4696702693511939821yes
2004-Q36462026308429217yes
2004-Q24642076241022579yes
2004-Q17070016437232618yes
2003-Q4535104072515344715yes
2003-Q348450232812335111yes
2003-Q249480144301262878yes
2003-Q16160097356229713yes
2002-Q459590106319143213yes
2002-Q3545100294744017yes
2002-Q27372044642834184yes
2002-Q1666309637544842yes
2001-Q468640244361444112yes
2001-Q3595901634823201yes
2001-Q25250033321103701yes
2001-Q138370021472970yes
2000-Q469660035621891yes
2000-Q34343023191133652yes
2000-Q27976034439856131yes
2000-Q189870233394407593yes

A blank median means fewer than 5 permits behind it: issued permits for the first stage, and for the second, finished permits whose final is dated after their issue (a permit never issued has no span). “Slowest 10%” is the 90th percentile: one permit in ten took at least this long. Download the table as CSV or JSON; both carry the source, license and data date.

What the numbers leave out

1,222 of the 5,358 building permits filed since 2000 (23%) have no final sign-off 3 years after they were issued or, if never issued, filed. A median over finished permits understates the real wait: the permits that never finish are not in it. Citywide, 803 of 803,269 permits since 2000 (0%) name no neighborhood and count in the city's figures only. Inspection records are not yet included: “final sign-off” is the city’s own completion date on the permit.

Project types in San Francisco's Visitacion Valley neighborhood

Shown apart, with their own page here: bathroom remodel (862 filed, 629 finished; contractors); kitchen remodel (575 filed, 395 finished; contractors); stairs (240 filed, 148 finished; contractors); deck (216 filed, 141 finished; contractors). Other types: 3,994 permits.

What was filed here, by building use

Of 969 permits filed in the Visitacion Valley neighborhood of San Francisco from October 2021 through September 2026, the largest building uses were single-family homes (58.9%), two-family buildings (21.8%) and apartment buildings (10.6%); 0.9% had no use on record.

What was filed in San Francisco's Visitacion Valleyneighborhood, by building useSingle-family homes: 571 permits (58.9%)Two-family buildings: 211 permits (21.8%)Apartment buildings: 103 permits (10.6%)Health, schools and assembly: 21 permits (2.2%)Retail and services: 16 permits (1.7%)Food and drink: 14 permits (1.4%)Everything else: 33 permits (3.4%)Single-family homes571 · 58.9%Two-family buildings211 · 21.8%Apartment buildings103 · 10.6%Health, schools and assembly21 · 2.2%Retail and services16 · 1.7%Food and drink14 · 1.4%Everything else33 · 3.4%Source: San Francisco Department of Building Inspection permit data via DataSF, analysis by Permit Graph(permitgraph.org), CC BY 4.0.www.permitgraph.org/neighborhoods/visitacion-valley · Data as of 23 November 2026969 permits filed October 2021 through September 2026, by the building use the city wrote on the permit. Withnone, the assessor's class for the parcel where it names a home; otherwise "No use on record".

This chart as an image (SVG) and the numbers as CSV, with the source and date, free to reuse under CC BY 4.0. The sentence names the largest groups that have a name; the table also lists the catch-all groups. The building use is the one the city wrote on the permit; with none, the assessor’s class for the parcel where it names a home. Residential hotels are counted with hotels.

Building usePermits filedShare
Single-family homes57158.9%
Two-family buildings21121.8%
Apartment buildings10310.6%
Health, schools and assembly212.2%
Retail and services161.7%
Food and drink141.4%
Other uses111.1%
No use on record90.9%
Parking and vacant lots60.6%
Industrial and storage40.4%
Offices30.3%

What was filed here, by project type

Of 969 permits filed in the Visitacion Valley neighborhood of San Francisco from October 2021 through September 2026, 74.7% matched none of the project types this site names. The most common types were bathroom remodel (7.4% of all permits), kitchen remodel (3.8%) and deck (2.3%); 9.6% matched more than one type.

What was filed in San Francisco's Visitacion Valleyneighborhood, by project typeMore than one typeMore than one type: 93 permits (9.6%)93 · 9.6%Bathroom remodelBathroom remodel: 72 permits (7.4%)72 · 7.4%Kitchen remodelKitchen remodel: 37 permits (3.8%)37 · 3.8%DeckDeck: 22 permits (2.3%)22 · 2.3%StairsStairs: 20 permits (2.1%)20 · 2.1%Other typesOther types: 1 permits (0.1%)1 · 0.1%724 of 969 permits (74.7%) matched none of the project types this site names; they are not drawn as a bar.Source: San Francisco Department of Building Inspection permit data via DataSF, analysis by Permit Graph(permitgraph.org), CC BY 4.0.www.permitgraph.org/neighborhoods/visitacion-valley · Data as of 23 November 2026969 permits filed October 2021 through September 2026, by the project type the site's keyword rules read in thepermit's description. A permit with several types is one bar, "More than one type".

This chart as an image (SVG) and the numbers as CSV, with the source and date, free to reuse under CC BY 4.0. The sentence names the largest groups that have a name; the table also lists the catch-all groups. The project type is what this site’s keyword rules read in the permit’s description, so most permits match none of the types named here; a permit that matches several is counted once, as “more than one type”.

Project typePermits filedShare
No type matched72474.7%
More than one type939.6%
Bathroom remodel727.4%
Kitchen remodel373.8%
Deck222.3%
Stairs202.1%
Other types10.1%

Nearby neighborhoods

McLaren Park, Portola, Excelsior; all of San Francisco; every neighborhood compared.

How this is calculated

Approved means the city issued the permit: the permit’s issue date. The first stage counts days from the filing date to the issue date, over permits issued on or after they were filed.

Final sign-off means the city’s own status for the permit is “complete”, with its completion date; this site does not yet read inspection records, so the inspection date is not a separate stage. The second stage counts days from the issue date to the completion date, over permits that have reached it.

Permits are grouped by the quarter they were filed. A quarter’s median counts only its permits that have finished the stage, so recent quarters look faster than they will end up: their slow permits have not finished yet. Quarters that ended two or more years ago are marked settled; the rest are shaded in the chart. The headline’s first stage uses the last four complete quarters; its second uses the last four settled quarters.

The median is the middle permit: half took less, half more. It shows how long a typical permit took: half of the permits that finished did so faster, and a few that took years do not pull it up the way they would an average. It leaves out permits that never finished, so treat it as a floor, not a promise. The slowest 10% is the 90th percentile. A median needs at least 5 permits behind it, or it is left out. A project type is shown apart within a neighborhood only when it has 30 or more finished permits there; the rest are “other types”.

Never finaled means no final sign-off three years after the permit was issued (or filed, if never issued), and not expired, cancelled, withdrawn, revoked, disapproved, denied or suspended (the site’s “expired or cancelled” outcome). About a quarter of permits citywide end this way; often the work was done and nobody called for the final inspection. These permits are in the counts and not in the medians.

A permit’s neighborhood is the Analysis Neighborhood the city writes on the permit record (the official set of 41). Permits with none are counted citywide only; the page says how many. “Nearby” neighborhoods are the three nearest by the center of their permits. The site reloads the city’s data every night; permits filed since 1 January 2000 are included. The placement of a permit, its dates and its status are the city’s; the grouping and the words are this site’s. How to read these records.