Bathroom remodel contractors in San Francisco
8,735 contractors have filed bathroom remodel permits in San Francisco since 2000. By permit record, the leaders are among those with at least 10 permits: Brady Construction (86 of 86 completed), Camp Roofing Ltd Dba Camp Construction (354 of 415 completed) and Chl Construction Company (49 of 52 completed).
Ranked across every bathroom remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the bathroom remodel contractors, the 2,000 that lead on this sort were read; the rest are not in this list. Show only contractors active in the last 5 years
- 1Brady ConstructionLicense 539362 86 permits: 86 completed. Last filed May 2026. Typically 78 days from permit to final inspection.
- 2Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 415 permits: 354 completed, 55 in progress, 4 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 70 days from permit to final inspection. Never finaled: 4 are 3 to 5 years old.
- 3Chl Construction CompanyLicense 960561 52 permits: 49 completed, 3 in progress. Last filed Jun 2026. Typically 249 days from permit to final inspection.
- 4William Gregory ClauseLicense 831583 109 permits: 107 completed, 2 expired or cancelled. Last filed Jul 2024. Typically 181 days from permit to final inspection.
- 5Jason Liu Construction CompanyLicense 662067 41 permits: 40 completed, 1 in progress. Last filed Aug 2026. Typically 243 days from permit to final inspection.
- 6Dunros ConstructionLicense 977841 42 permits: 39 completed, 3 in progress. Last filed May 2026. Typically 158 days from permit to final inspection.
- 7Chongson Construction Co.License 642065 39 permits: 39 completed. Last filed Mar 2025. Typically 125 days from permit to final inspection.
- 8Mr UngerLicense 982722 41 permits: 38 completed, 3 in progress. Last filed Aug 2026. Typically 58 days from permit to final inspection.
- 9Valex ConstructionLicense 809059 65 permits: 62 completed, 2 in progress, 1 never finaled. Last filed Jul 2026. Typically 82 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 10Be Home Remodeling IncLicense 1115373 49 permits: 36 completed, 13 in progress. Last filed Aug 2026. Typically 63 days from permit to final inspection.
- 11Paramount Construction Services IncLicense 837358 61 permits: 60 completed, 1 expired or cancelled. Last filed Oct 2015. Typically 15 days from permit to final inspection.
- 12Steven Liao Construction CompanyLicense 690964 38 permits: 35 completed, 3 in progress. Last filed Sep 2026. Typically 189 days from permit to final inspection.
- 13Hang C Construction IncLicense 760153 37 permits: 35 completed, 2 in progress. Last filed Oct 2025. Typically 180 days from permit to final inspection.
- 14Sean M O'reillyLicense 812877 34 permits: 34 completed. Last filed May 2026. Typically 84 days from permit to final inspection.
- 15We Do Construction Inc.License 1096552 95 permits: 75 completed, 18 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 99 days from permit to final inspection.
- 16Sure, Inc.License 561658 727 permits: 673 completed, 11 in progress, 25 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection. Never finaled: 10 are 5 to 10 years old, 15 are over 10 years old.
- 17Hong Shink ConstructionLicense 758888 57 permits: 54 completed, 2 in progress, 1 never finaled. Last filed Jun 2026. Typically 142 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 18B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Dec 2025. Typically 102 days from permit to final inspection.
- 19Bay Metro CorporationLicense 850352 54 permits: 52 completed, 1 in progress, 1 never finaled. Last filed Apr 2026. Typically 119 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 20S H C ILicense 887172 30 permits: 30 completed. Last filed Sep 2023. Typically 129 days from permit to final inspection.
- 21Yiu's Construction CoLicense 802681 85 permits: 82 completed, 2 never finaled, 1 expired or cancelled. Last filed Jul 2026. Typically 100 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old.
- 22Yefa Construction IncLicense 1047719 31 permits: 29 completed, 2 in progress. Last filed Nov 2025. Typically 310 days from permit to final inspection.
- 23Jin Qing Construction Corp.License 1030182 30 permits: 29 completed, 1 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 24Toni's Construction IncLicense 551504 67 permits: 65 completed, 2 expired or cancelled. Last filed Apr 2025. Typically 141 days from permit to final inspection.
- 25Great Ocean Construction Inc.License 1103304 32 permits: 28 completed, 4 in progress. Last filed Jul 2026. Typically 138 days from permit to final inspection.
- 26Landmark Construction & Development IncLicense 848253 27 permits: 27 completed. Last filed Sep 2021. Typically 135 days from permit to final inspection.
- 27Darc Ventures Inc Dba Spl Construction SLicense 938513 80 permits: 74 completed, 3 in progress, 3 expired or cancelled. Last filed Aug 2026. Typically 178 days from permit to final inspection.
- 28Landmark Construction Inc.License 907832 45 permits: 44 completed, 1 never finaled. Last filed Apr 2023. Typically 148 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old.
- 29Nelson T Lewis Const Co Inc.License 195866 94 permits: 87 completed, 3 in progress, 4 expired or cancelled. Last filed Sep 2026. Typically 88 days from permit to final inspection.
- 30At6 Design BuildLicense 283485 45 permits: 43 completed, 1 in progress, 1 never finaled. Last filed Apr 2026. Typically 288 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 31Wah Wong Construction Co.License 705046 44 permits: 43 completed, 1 never finaled. Last filed Apr 2017. Typically 141 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 32Kenneth ChiuLicense 817869 26 permits: 25 completed, 1 in progress. Last filed Jul 2026. Typically 93 days from permit to final inspection.
- 33T T General ConstructionLicense 927524 26 permits: 25 completed, 1 in progress. Last filed Feb 2026. Typically 184 days from permit to final inspection.
- 34Hough ConstructionLicense 491827 25 permits: 25 completed. Last filed Oct 2019. Typically 225 days from permit to final inspection.
- 35J. Ho Construction IncLicense 680425 142 permits: 133 completed, 1 in progress, 4 never finaled, 4 expired or cancelled. Last filed Apr 2026. Typically 89 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
- 36Bai Yuan LiLicense 923824 42 permits: 41 completed, 1 never finaled. Last filed Dec 2025. Typically 147 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old.
- 37Lee And Son Construction Inc.License 961053 64 permits: 55 completed, 7 in progress, 1 never finaled, 1 expired or cancelled. Last filed Jun 2026. Typically 200 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 38Winder Construction Inc.License 1033654 28 permits: 24 completed, 4 in progress. Last filed Jun 2026. Typically 350 days from permit to final inspection.
- 39Pacific Green ConstructionLicense 891177 24 permits: 24 completed. Last filed Jul 2017. Typically 90 days from permit to final inspection.
- 40Elisha MayostLicense 881789 41 permits: 39 completed, 1 in progress, 1 expired or cancelled. Last filed Apr 2025. Typically 128 days from permit to final inspection.
How long bathroom remodel permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent bathroom remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 128 Pierce St | demo interior walls in garage, open up for paving, new non-conditioned storage at back of garage. new type"x" gyp on ceiling and walls. unit 128 interior remodel for new kitchen,bathroom,mud room & powder room. replace front windows in kind w/ wood windows. unit 130,add 16sf watercloset.Details
demo interior walls in garage, open up for paving, new non-conditioned storage at back of garage. new type"x" gyp on ceiling and walls. unit 128 interior remodel for new kitchen,bathroom,mud room & powder room. replace front windows in kind w/ wood windows. unit 130,add 16sf watercloset. | $390,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1553 35th Av | convert 870 sf of (e) un-conditioned floor area to living area. add family room, media room, powder, laundry, bedroom and bath to 1st floor on 2nd floor. remodel kitchen and bath (n) powder. no change to street facing elevationDetails
convert 870 sf of (e) un-conditioned floor area to living area. add family room, media room, powder, laundry, bedroom and bath to 1st floor on 2nd floor. remodel kitchen and bath (n) powder. no change to street facing elevation | $200,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1413 Golden Gate Av | 3/fl- unit 1413- convert (e) closet to bathroom. (no exterior changes or structrual)Details
3/fl- unit 1413- convert (e) closet to bathroom. (no exterior changes or structrual) | $16,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 557 26th Av | interior renovation of unit 557-a @ 1st fl of a 3 story building. scope of work includes: new master suite with 1 new bathroom; kitchen renovation; replace existing non-efficacy lights with led retrofit recessed lights. existing bath to be modified with a walk in shower. new interior finishes.Details
interior renovation of unit 557-a @ 1st fl of a 3 story building. scope of work includes: new master suite with 1 new bathroom; kitchen renovation; replace existing non-efficacy lights with led retrofit recessed lights. existing bath to be modified with a walk in shower. new interior finishes. | $80,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1328 Waller St | unit 1330- interior renovation of (e) bedroom and adjoining sitting room, removing (e) bedroom fireplace, adding new built ins, and creating new walkin closet and bathroomDetails
unit 1330- interior renovation of (e) bedroom and adjoining sitting room, removing (e) bedroom fireplace, adding new built ins, and creating new walkin closet and bathroom | $50,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 437 Day St | conversion of approximately 406 sf of existing garage space into a family recreational area accessory to the existing residence. the remodeled space will include a new bathroom and a small service/wet bar area with a sink.no kitchen, cooking or sleeping facilities are proposed.Details
conversion of approximately 406 sf of existing garage space into a family recreational area accessory to the existing residence. the remodeled space will include a new bathroom and a small service/wet bar area with a sink.no kitchen, cooking or sleeping facilities are proposed. | $20,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1742 41st Av | interior remodel and garage conversion. remodel existing kitchen and demo non load bearing wall. convert 262 of existing garage space to add a bedroom and 1 bath. remove existing non compliant interior stairs and rebuild to meet 2025 cbc sec 1011Details
interior remodel and garage conversion. remodel existing kitchen and demo non load bearing wall. convert 262 of existing garage space to add a bedroom and 1 bath. remove existing non compliant interior stairs and rebuild to meet 2025 cbc sec 1011 | $42,000 | |
| Oct 6, 2026 | In progress issued Oct 2026 | 1994 42nd Av | replace sheet rock with 5/8" type x in kitchen, living room, bedroom and bathroomsDetails
replace sheet rock with 5/8" type x in kitchen, living room, bedroom and bathrooms | $20,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1733 20th St | Golden Heights Remodeling Inc | non-structural, interior remodel to existing bathroom, demo existing bathtub,complete walk in shower area, vanity, toilet & removal existing skylight. relocate toilet drain, upgrade all rough plumbing & electrical to meet codes requirements, install exhsaust fan, new skylight same size as previousDetails
non-structural, interior remodel to existing bathroom, demo existing bathtub,complete walk in shower area, vanity, toilet & removal existing skylight. relocate toilet drain, upgrade all rough plumbing & electrical to meet codes requirements, install exhsaust fan, new skylight same size as previous | $18,500 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 511 Buchanan St | #511b: like to like kitchen & bathroom remodel at g/f. convert (e) bedroom into 2 new bedroom. add laundry at bathroom area.Details
#511b: like to like kitchen & bathroom remodel at g/f. convert (e) bedroom into 2 new bedroom. add laundry at bathroom area. | $20,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 1477 23rd Av | light-well infill on 2/f to replace (e) interior connect for code compliance. kitchen remodel on 2/f. g/f development by converting (e) laundry area into entertainment room, family room, guest room, & add 1 new bath.Details
light-well infill on 2/f to replace (e) interior connect for code compliance. kitchen remodel on 2/f. g/f development by converting (e) laundry area into entertainment room, family room, guest room, & add 1 new bath. | $80,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 183 24th Av | to comply with nov 202662646. bathroom relocation of tub. rebuild existing roof deck and make the railing up to code with glass. replace in kind 5 windows on the side of the house. replace in kind knee walls. new full height walls.Details
to comply with nov 202662646. bathroom relocation of tub. rebuild existing roof deck and make the railing up to code with glass. replace in kind 5 windows on the side of the house. replace in kind knee walls. new full height walls. | $15,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 4300 17th St | Actually Design Build Inc | new construction of 1 detached 2-story, type v-b (adus) at western lot. each adu contains 2 beds and 1.5 baths. work includes new slab-on-grade foundations, wood-frame construction, two independent flat roof systems, exterior victorian italianate facade elements, new mechanical, electrical, plumbingDetails
new construction of 1 detached 2-story, type v-b (adus) at western lot. each adu contains 2 beds and 1.5 baths. work includes new slab-on-grade foundations, wood-frame construction, two independent flat roof systems, exterior victorian italianate facade elements, new mechanical, electrical, plumbing | $780,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 1714 Anza St | Vij Construction Inc. | cabinets and counterop replacement, laundry addition, finish fixtures replacement for bathroom. work at new laundry and existing bathroom only.Details
cabinets and counterop replacement, laundry addition, finish fixtures replacement for bathroom. work at new laundry and existing bathroom only. | $5,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 655 Jackson St | Astorga Construction Inc | replace bathroom fixtures and replace tile per complaint 202663455.Details
replace bathroom fixtures and replace tile per complaint 202663455. | $5,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 4300 17th St | Actually Design Build Inc | new construction of 1 detached 2-story, type v-b (adus) at western lot. each adu contains 2 beds and 1.5 baths. work includes new slab-on-grade foundations, wood-frame construction, two independent flat roof systems, exterior victorian italianate facade elements, new mechanical, electrical, plumbingDetails
new construction of 1 detached 2-story, type v-b (adus) at western lot. each adu contains 2 beds and 1.5 baths. work includes new slab-on-grade foundations, wood-frame construction, two independent flat roof systems, exterior victorian italianate facade elements, new mechanical, electrical, plumbing | $780,000 |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 432 Lawton St | Centoni Restoration & Development | new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry.Details
new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry. | $50,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 400 Beale St | D & K Construction &Painting Company Inc | bathroom remodel from tub into a shower. permits for plumbing and electrical to be pull by subs.Details
bathroom remodel from tub into a shower. permits for plumbing and electrical to be pull by subs. | $24,500 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 3126 Santiago St | horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom.Details
horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom. | $180,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 522 Edinburgh St | interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansionDetails
interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansion | $50,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 762 Treat Av | 2/f: renovation of (e) bathroom, replace tub w/ shower.Details
2/f: renovation of (e) bathroom, replace tub w/ shower. | $5,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1515 Underwood Av | interior remodeling in lower level: relocate (e) bathroom, repair damaged foundation footing and slab and new interior footing and shearwall (in lower level).Details
interior remodeling in lower level: relocate (e) bathroom, repair damaged foundation footing and slab and new interior footing and shearwall (in lower level). | $13,500 | |
| Oct 2, 2026 | In progress issued Oct 2026 | 2127 26th Av | bathroom remodel. no structural modificationsDetails
bathroom remodel. no structural modifications | $6,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 63 Escondido Av | interior remodeling & partial garage conversion to add one bedroom & 1 bathroom. scope includes bathroom & laundry reconfiguration, replacement of all existing windows with new aluminum double pane windows. windows & doors modification, hydorgen heated flooring, tankless water heater installationDetails
interior remodeling & partial garage conversion to add one bedroom & 1 bathroom. scope includes bathroom & laundry reconfiguration, replacement of all existing windows with new aluminum double pane windows. windows & doors modification, hydorgen heated flooring, tankless water heater installation | $300,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 519 Arkansas St | convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use.Details
convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use. | $125,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2298 Pacific Av | provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent.Details
provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent. | $98,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 75 Santa Ana Av | Del Rio Stone Dba: Del Rio Stone Constr. | kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room.Details
kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room. | $180,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 259 17th Av | Sunset Remodeling And Design Inc | 2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into aDetails
2nd floor: convert existing single hung windows at dining room into a french door(same opening), convert existing single hung window at sunroom into a swing tempered glass door, new 315 sq. ft. roof deck, new wood staircase from roof to rear yard. 3rd fllo: convert (e) bathroom sliding window into a | $20,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1307 04th Av | Remodeling Heroes Inc. | work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sfDetails
work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sf | $28,000 |