Cassini Construction
- Based in
- Monovia
- On San Francisco permits
- Nov 2026 to Nov 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2026 | In progress issued Nov 2026 | 231 Brussels St | install two new skylights, and windows replacements like for like street facing. skylights shall be located a minimum 5'-0" from inside face of property line wall. attic not for sleeping.Details
install two new skylights, and windows replacements like for like street facing. skylights shall be located a minimum 5'-0" from inside face of property line wall. attic not for sleeping. | $30,000 |
| Nov 19, 2026 | In progress issued Nov 2026 | 676 Brunswick St | bathroom remodel convert tub to shower, replace toilet vanity top , no layout change like for like. approximately 30sfDetails
bathroom remodel convert tub to shower, replace toilet vanity top , no layout change like for like. approximately 30sf | $20,000 |