Back to kitchen remodel contractors
Yu Kwan Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2026
- Last 24 months
- 6 permits filed
151 permits since 2000: 123 completed, 11 never finaled, 17 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
61 kitchen remodel permits: 54 completed, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Jul 2026 | 1800 Pacific Av | unit #805 - kitchen and bathroom remodel, upgrade electrical.Details
unit #805 - kitchen and bathroom remodel, upgrade electrical. | $58,000 |
| Jan 16, 2025 | Completed final sign-off Jun 2025 | 1800 Pacific Av | unit 602: kitchen and 2 bathrooms remodel.Details
unit 602: kitchen and 2 bathrooms remodel. | $35,000 |
| Oct 18, 2024 | Completed final sign-off Feb 2025 | 1324 Pacific Av | units# 1324, 1328, 1328a, 1324a, 1330: repair holes after rough plumbing and electric. install cabinets (kitchen)- replaced like for like.Details
units# 1324, 1328, 1328a, 1324a, 1330: repair holes after rough plumbing and electric. install cabinets (kitchen)- replaced like for like. | $1,000 |
| Sep 11, 2024 | Expired or cancelled cancelled Sep 2025 | 296 Lisbon St | remove & replace kitchen wall plaster, replace w/ drywall throughout unit, no change in layout; r/r kitchen cabinets & bathroom fixtures; update plumbing to comply w/ current code; elect. upgrade & installation to comply with current energy code; no wall demolition or wall construction.Details
remove & replace kitchen wall plaster, replace w/ drywall throughout unit, no change in layout; r/r kitchen cabinets & bathroom fixtures; update plumbing to comply w/ current code; elect. upgrade & installation to comply with current energy code; no wall demolition or wall construction. | $20,000 |
| Jan 31, 2024 | Completed final sign-off Sep 2024 | 810 Hyde St | unit# 406 remodel kitchen and bathroom: no layout changes and no structural workDetails
unit# 406 remodel kitchen and bathroom: no layout changes and no structural work | $28,000 |
| Jan 31, 2024 | Completed final sign-off Oct 2024 | 1800 Pacific Av | unit 605: remodel kitchen and bathroom. no layout changes. no structural work.Details
unit 605: remodel kitchen and bathroom. no layout changes. no structural work. | $35,000 |
| Aug 21, 2023 | Completed final sign-off Oct 2023 | 1600 Webster St | apt #409: replace kitchen cabinets and couner top.Details
apt #409: replace kitchen cabinets and couner top. | $8,500 |
| Jun 7, 2023 | Completed final sign-off Jan 2024 | 1800 Pacific Av | one bathroom and kitchen remodelDetails
one bathroom and kitchen remodel | $15,000 |
| Nov 22, 2022 | Completed final sign-off Nov 2023 | 1800 Pacific Av | apt 902: remodel bathroom kitchen in-kind and paintingDetails
apt 902: remodel bathroom kitchen in-kind and painting | $18,000 |
| May 9, 2022 | Completed final sign-off Dec 2022 | 625 Ulloa St | kitchen remodel no configuration change.Details
kitchen remodel no configuration change. | $8,500 |
| Mar 2, 2022 | Completed final sign-off Sep 2022 | 1450 23rd Av | kitchen remodel. replace in-kind. same layout. no wall removal.Details
kitchen remodel. replace in-kind. same layout. no wall removal. | $12,000 |
| Jan 7, 2021 | Completed final sign-off Nov 2023 | 2514 45th Av | 2nd floor: remodel (e) kitchen. remove non-bearing wall between kitchen & dining room.Details
2nd floor: remodel (e) kitchen. remove non-bearing wall between kitchen & dining room. | $15,000 |
| Feb 25, 2020 | Completed final sign-off Mar 2021 | 1714 Mckinnon Av | remodel extg kitchen. relocate extg bath room and add one bath room. all work at 2nd floor.Details
remodel extg kitchen. relocate extg bath room and add one bath room. all work at 2nd floor. | $36,000 |
| Sep 6, 2018 | Never finaled issued Feb 2019, no final | 239 Monterey Bl | basement: add 1 full bath, family rm, & interior stairs. 1/f: add 1 bedroom & 1 full bath. 2/f: remodel kitchen & add half bath & laundry. 3/f: remodel bath & add 1 full bath.Details
basement: add 1 full bath, family rm, & interior stairs. 1/f: add 1 bedroom & 1 full bath. 2/f: remodel kitchen & add half bath & laundry. 3/f: remodel bath & add 1 full bath. | $120,000 |
| Nov 30, 2017 | Completed final sign-off Sep 2023 | 126 Hugo St | legalize as built unit (unit 126a) per odrinance 43-14 on 1st flr w/ a bdrm, a full bath, powder rm, kitchen/living rm, office room & media room per plan. to comply with nov #201700151.Details
legalize as built unit (unit 126a) per odrinance 43-14 on 1st flr w/ a bdrm, a full bath, powder rm, kitchen/living rm, office room & media room per plan. to comply with nov #201700151. | $21,000 |
| Mar 16, 2017 | Completed final sign-off Nov 2017 | 351 Niagara Av | kitchen remodelDetails
kitchen remodel | $9,500 |
| Mar 13, 2017 | Completed final sign-off Jan 2018 | 142 Otsego Av | construct 2 bedrooms, 1 full bath room, media room at ground floor; remodel existing kitchen, bath room & construct new bath room at 2nd floor; construct new deck with staircase at rear o f buildingDetails
construct 2 bedrooms, 1 full bath room, media room at ground floor; remodel existing kitchen, bath room & construct new bath room at 2nd floor; construct new deck with staircase at rear o f building | $72,000 |
| Sep 2, 2016 | Completed final sign-off Mar 2017 | 2530 42nd Av | remodel (e) kitchen, bathroom & re-wire elect lighting. all work at 2nd floor.Details
remodel (e) kitchen, bathroom & re-wire elect lighting. all work at 2nd floor. | $20,000 |
| Aug 29, 2016 | Completed final sign-off Sep 2016 | 1355 Leavenworth St | replace kitchen counter top and tile, install laminate floor in bedroom, living room , house inside, painting no walls added or removed no structuralDetails
replace kitchen counter top and tile, install laminate floor in bedroom, living room , house inside, painting no walls added or removed no structural | $5,500 |
| May 13, 2016 | Completed final sign-off May 2018 | 1955 Stockton St | remodel kitchen four bedrooms, hallway, remove plaster, install sheetrock & paintingDetails
remodel kitchen four bedrooms, hallway, remove plaster, install sheetrock & painting | $35,000 |
| May 13, 2016 | Never finaled issued May 2016, no final | 1250 Jackson St | remodel kitchen , upgrade electrical bedroom rewire, to light & outlets.Details
remodel kitchen , upgrade electrical bedroom rewire, to light & outlets. | $11,800 |
| Feb 26, 2016 | Completed final sign-off Aug 2016 | 1973 48th Av | remodel kitchen, remodel two bathroom; (1) 1/2 bath downstairs. four sliding doors at rear, house painting. max u factor 0.32Details
remodel kitchen, remodel two bathroom; (1) 1/2 bath downstairs. four sliding doors at rear, house painting. max u factor 0.32 | $25,000 |
| Oct 19, 2015 | Completed final sign-off Sep 2018 | 1339 47th Av | add 2 bedrooms and 1 bathroom in (e) basement. remodel upstairs bathroom, relocate kitchen and convert (e) kitchen into bedroomDetails
add 2 bedrooms and 1 bathroom in (e) basement. remodel upstairs bathroom, relocate kitchen and convert (e) kitchen into bedroom | $60,000 |
| Sep 23, 2015 | Completed final sign-off Sep 2016 | 2201 44th Av | 1) interior remodeling of s.f.d. 2) add 2 bedrooms and one bathroom at 1st floor. 3)add one bedroom and one bathroom at 2nd floor. 4) remodeling of extg kitchen at 2nd floor. 5) mech, elec, plbg under separate permitDetails
1) interior remodeling of s.f.d. 2) add 2 bedrooms and one bathroom at 1st floor. 3)add one bedroom and one bathroom at 2nd floor. 4) remodeling of extg kitchen at 2nd floor. 5) mech, elec, plbg under separate permit | $80,000 |
| Sep 10, 2015 | Completed final sign-off Jul 2016 | 1953 Stockton St | remodel bathroom, kitchen at #1953. three bedroom and hallway, remove plaster, install sheetrock and painting. install new wire to light and outlet. repair damaged plaster only.Details
remodel bathroom, kitchen at #1953. three bedroom and hallway, remove plaster, install sheetrock and painting. install new wire to light and outlet. repair damaged plaster only. | $35,000 |
| Mar 31, 2015 | Completed final sign-off Sep 2015 | 1759 18th Av | 1. remodel (e) bathroom - construct 1 (n) full bath. relocate kitchen & convert to home office at 2nd flr. 2. re-wire elect lighting for 2nd flrDetails
1. remodel (e) bathroom - construct 1 (n) full bath. relocate kitchen & convert to home office at 2nd flr. 2. re-wire elect lighting for 2nd flr | $35,000 |
| Jan 26, 2015 | Never finaled issued Oct 2015, no final | 358 Vallejo St | remodel (e) 2/f kitchen, open walls between sunroom & pantry rooms to kitchen. reframe (e) landing, sunroom floor joists & replace stair run to ground (rotted). upgrade to new codes(slightly larger as needed). add plywood for shear @ 2 walls. general mep upgrades, change windows not visable from st.Details
remodel (e) 2/f kitchen, open walls between sunroom & pantry rooms to kitchen. reframe (e) landing, sunroom floor joists & replace stair run to ground (rotted). upgrade to new codes(slightly larger as needed). add plywood for shear @ 2 walls. general mep upgrades, change windows not visable from st. | $36,239 |
| Oct 30, 2014 | Completed final sign-off Feb 2015 | 1586 25th Av | remodel kitchen: replace cabinets, counter top & floor tile.Details
remodel kitchen: replace cabinets, counter top & floor tile. | $22,000 |
| Aug 4, 2014 | Completed final sign-off Feb 2015 | 2223 47th Av | 2nd flr remodel kitchen and bathroomDetails
2nd flr remodel kitchen and bathroom | $16,500 |
| Mar 3, 2014 | Completed final sign-off Apr 2015 | 1136 Leavenworth St | remodel kitchen & bathroom on middle level unit. no change in walls & opening layout. kitchen lighting min 50% wattage high efficacy. bath room light shall be high efficacy or controlled by manual on sensor.Details
remodel kitchen & bathroom on middle level unit. no change in walls & opening layout. kitchen lighting min 50% wattage high efficacy. bath room light shall be high efficacy or controlled by manual on sensor. | $15,000 |
| Feb 28, 2014 | Completed final sign-off Dec 2014 | 1800 Pacific Av | unit #1003: remodel kitchen & two (2) bathroos and painting. no window or door changes with this permit.Details
unit #1003: remodel kitchen & two (2) bathroos and painting. no window or door changes with this permit. | $22,500 |
| Jul 29, 2013 | Completed final sign-off Oct 2013 | 155 Moffitt St | remodle kitchen - replace cabinets, countertop, appliances, flooringDetails
remodle kitchen - replace cabinets, countertop, appliances, flooring | $12,000 |
| May 17, 2013 | Completed final sign-off Sep 2013 | 1534 Revere Av | remodel kitchen, change cabinets and counter topDetails
remodel kitchen, change cabinets and counter top | $12,000 |
| Apr 16, 2013 | Completed final sign-off Nov 2013 | 1800 Pacific Av | work in unit 1002: kitchen replace cabinet, countertop, appliance. two bathroom: replace tile and fixture.Details
work in unit 1002: kitchen replace cabinet, countertop, appliance. two bathroom: replace tile and fixture. | $20,000 |
| Feb 5, 2013 | Expired or cancelled expired Dec 2014 | 72 Bret Harte Tr | inter. remodel for unit 72 & 74 incl 3 bathrms & 2 kitchens. alterations to facade, removing non-hist retails.install bi-fold doors.replace wd window and repair rooftop deck & replace wd screen.replace wood guardrail at terrace.install acoustic insulation @ floor. #72-change sun porch to new bedrmDetails
inter. remodel for unit 72 & 74 incl 3 bathrms & 2 kitchens. alterations to facade, removing non-hist retails.install bi-fold doors.replace wd window and repair rooftop deck & replace wd screen.replace wood guardrail at terrace.install acoustic insulation @ floor. #72-change sun porch to new bedrm | $65,000 |
| Jul 20, 2012 | Completed final sign-off Jan 2013 | 3245 Clay St | #7- replace kitchen cabinet & counter top, replace bathroom bathtub & tile, no lighting change.Details
#7- replace kitchen cabinet & counter top, replace bathroom bathtub & tile, no lighting change. | $8,000 |
| Jul 9, 2012 | Completed final sign-off Dec 2012 | 631 Madrid St | comply w/complaint #201069234,20107032,201100201,201106961,201117621,200727052, 200871924: remodle (e) kitchen, (2) bathroom, replace (n) sheetrock w/r-13 insulation & re-wire electrical at second floor. remove bathroom & all rooms at ground floor & remove illegal room at rear yard.Details
comply w/complaint #201069234,20107032,201100201,201106961,201117621,200727052, 200871924: remodle (e) kitchen, (2) bathroom, replace (n) sheetrock w/r-13 insulation & re-wire electrical at second floor. remove bathroom & all rooms at ground floor & remove illegal room at rear yard. | $28,000 |
| Jun 22, 2012 | Completed final sign-off Mar 2013 | 808 Capitol Av | comply with 201223541 and 201231641. remove metal fence. remodel e kitchen, bath rm. replace fixtures, counter cabinet and flooring 1st fl. divider e bath room into 2 bathrooms. remodel 1 bath, add 1 new bath at 2nd flDetails
comply with 201223541 and 201231641. remove metal fence. remodel e kitchen, bath rm. replace fixtures, counter cabinet and flooring 1st fl. divider e bath room into 2 bathrooms. remodel 1 bath, add 1 new bath at 2nd fl | $36,000 |
| Oct 28, 2011 | Completed final sign-off Feb 2012 | 810 Hyde St | remodel bathrooms in apt. #201, 401, 501, 601: bathroom and kitchen open wall for plumbing replace water piping and repair the wall.Details
remodel bathrooms in apt. #201, 401, 501, 601: bathroom and kitchen open wall for plumbing replace water piping and repair the wall. | $15,000 |
| Sep 6, 2011 | Completed final sign-off Dec 2013 | 149 Lawrence Av | 1)legalize one bed room, one bath room and construct one new bed room at ground floor.2)remodel kitchen and bath rooms at 2nd floor. 3)remodel bath rooms at third floor.Details
1)legalize one bed room, one bath room and construct one new bed room at ground floor.2)remodel kitchen and bath rooms at 2nd floor. 3)remodel bath rooms at third floor. | $70,000 |
| Jan 10, 2011 | Completed final sign-off Jul 2011 | 125 San Rafael Wy | 1)remodel extg kitchen, two bath and rewire electrical lighting at first floor.2)remodel extg bathroom at 2nd floor.Details
1)remodel extg kitchen, two bath and rewire electrical lighting at first floor.2)remodel extg bathroom at 2nd floor. | $45,000 |
| Jun 14, 2010 | Completed final sign-off Jan 2011 | 135 Ralston St | to respond complaint #201032702: remove illegal kitchen & bathroom & add one (n) full bathroom. legalize two bedroom on (e) ground floor per plan.Details
to respond complaint #201032702: remove illegal kitchen & bathroom & add one (n) full bathroom. legalize two bedroom on (e) ground floor per plan. | $25,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 765 09th Av | remodel kitchen, bathroom & laundry room. at kitchen: replace cabinet & counter, new lighting must comply iwth cec 150 (k); at bathroom replace plumbing fixtures retile walls & foor; at laundry room: repalce washer & dryer; no structural work. work @ #765.Details
remodel kitchen, bathroom & laundry room. at kitchen: replace cabinet & counter, new lighting must comply iwth cec 150 (k); at bathroom replace plumbing fixtures retile walls & foor; at laundry room: repalce washer & dryer; no structural work. work @ #765. | $30,000 |
| Apr 12, 2010 | Completed final sign-off Sep 2010 | 1551 Leavenworth St | remodel kitchen, bathroom; paintingDetails
remodel kitchen, bathroom; painting | $18,000 |
| Mar 29, 2010 | Completed final sign-off Jun 2010 | 3315 Steiner St | replace kitchen cabinets and countertopDetails
replace kitchen cabinets and countertop | $3,500 |
| Feb 24, 2010 | Completed final sign-off Sep 2010 | 763 09th Av | remodel kitchen, bathroom, painting laundry room. change new washer and dryer. lighting pefr cec 150 ck. dryer connect to ext exhaust.Details
remodel kitchen, bathroom, painting laundry room. change new washer and dryer. lighting pefr cec 150 ck. dryer connect to ext exhaust. | $30,000 |
| Sep 24, 2008 | Completed final sign-off Dec 2008 | 1968 Great Hy | remodel kitchen and painting, change cabinet and ocunter top (new lighting), no new wall- no removal of existing walls, same size and locationDetails
remodel kitchen and painting, change cabinet and ocunter top (new lighting), no new wall- no removal of existing walls, same size and location | $15,000 |
| Sep 9, 2008 | Completed final sign-off Nov 2008 | 339 Niagara Av | 2/f replace existing bathroom toilet sink bathtub convert shower to closet remodel existing kitchen replace counter top with sink, remove existing pantry and non bearing wall between kitchen and breakfast area remove wall between 2 closets in the east side bedroom ground floor: new partition to newDetails
2/f replace existing bathroom toilet sink bathtub convert shower to closet remodel existing kitchen replace counter top with sink, remove existing pantry and non bearing wall between kitchen and breakfast area remove wall between 2 closets in the east side bedroom ground floor: new partition to new | $21,000 |
| May 22, 2007 | Completed final sign-off Aug 2007 | 1951 Stockton St | remodel one kitchen non structural . replace 4 bedroom windows. sme size & location, u factor = 0.67 max. take out plaster, replace new sheetrock in one unit (lower unit) 5/8" type x both side @ prop line & btwn units & btwn unit & common area. r13 for wall kis for ceiling.Details
remodel one kitchen non structural . replace 4 bedroom windows. sme size & location, u factor = 0.67 max. take out plaster, replace new sheetrock in one unit (lower unit) 5/8" type x both side @ prop line & btwn units & btwn unit & common area. r13 for wall kis for ceiling. | $28,000 |
| Dec 13, 2006 | Completed final sign-off Jan 2007 | 1015 Masonic Av | to comply with n.o.v#200684925. remodel apart#11, new sheetrock on walls & ceilings in bedroom, dining room, kitchen and bathroom. new cabinets in kitchen & remodel bathroom.Details
to comply with n.o.v#200684925. remodel apart#11, new sheetrock on walls & ceilings in bedroom, dining room, kitchen and bathroom. new cabinets in kitchen & remodel bathroom. | $20,000 |
| Aug 2, 2006 | Completed final sign-off Jan 2007 | 1547 Leavenworth St | replace from plaster to sheerrock for all rooms. kitchen cabinets, bathroom tiles, (9) windows non facing the street.work to be done on 1549a leavenworthDetails
replace from plaster to sheerrock for all rooms. kitchen cabinets, bathroom tiles, (9) windows non facing the street.work to be done on 1549a leavenworth | $15,000 |
| Aug 4, 2005 | Completed final sign-off Dec 2005 | 1015 Masonic Av | repair fire damage on apt#4 & apt#8 included bathroom and kitchen.Details
repair fire damage on apt#4 & apt#8 included bathroom and kitchen. | $28,000 |
| Jun 24, 2004 | Completed final sign-off Aug 2004 | 490 33rd Av | bathroom&kitchen remodel-chg bathroom, bathtub, tile.chg kitchen cabinet, counter top&tile.painting.Details
bathroom&kitchen remodel-chg bathroom, bathtub, tile.chg kitchen cabinet, counter top&tile.painting. | $11,000 |
| Jun 25, 2003 | Expired or cancelled expired Mar 2004 | 2369 Bryant St | remodel kitchen.Details
remodel kitchen. | $8,500 |
| Apr 2, 2003 | Completed final sign-off Jul 2003 | 184 Palm Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $12,000 |
| Jan 17, 2003 | Completed final sign-off May 2003 | 2374 Bryant St | remodel kitchen. repair ceiling & wall crack & paint.Details
remodel kitchen. repair ceiling & wall crack & paint. | $15,000 |
| Aug 28, 2002 | Completed final sign-off Nov 2002 | 1284 08th Av | remodel kitchen, change cabinet/stove, change 1 window at kitchen lightwellDetails
remodel kitchen, change cabinet/stove, change 1 window at kitchen lightwell | $10,000 |
| Jun 26, 2002 | Completed final sign-off Jan 2003 | 4075 California St | remodel 4/f unit #3 kitchen bathroomDetails
remodel 4/f unit #3 kitchen bathroom | $25,000 |
| Dec 12, 2000 | Completed final sign-off Apr 2001 | 626 41st Av | change 11 window (in kind window replacement only) change kitchen counter top & floor tile. paint inDetails
change 11 window (in kind window replacement only) change kitchen counter top & floor tile. paint in | $5,500 |
| Aug 14, 2000 | Completed final sign-off Nov 2000 | 1871 24th Av | change cabinets, remodel kitchenDetails
change cabinets, remodel kitchen | $8,000 |
| Jun 1, 2000 | Expired or cancelled expired Feb 2001 | 3321 17th St | replace sheetrock, replace floor in kitchen and bathroom work in unit 21Details
replace sheetrock, replace floor in kitchen and bathroom work in unit 21 | $12,500 |