Back to bathroom remodel contractors
Yu Kwan Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2026
- Last 24 months
- 6 permits filed
151 permits since 2000: 123 completed, 11 never finaled, 17 expired or cancelled.
Of the 11 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
58 bathroom remodel permits: 52 completed, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Jul 2026 | 1800 Pacific Av | unit #805 - kitchen and bathroom remodel, upgrade electrical.Details
unit #805 - kitchen and bathroom remodel, upgrade electrical. | $58,000 |
| Jan 16, 2025 | Completed final sign-off Jun 2025 | 1800 Pacific Av | unit 602: kitchen and 2 bathrooms remodel.Details
unit 602: kitchen and 2 bathrooms remodel. | $35,000 |
| Sep 11, 2024 | Expired or cancelled cancelled Sep 2025 | 296 Lisbon St | remove & replace kitchen wall plaster, replace w/ drywall throughout unit, no change in layout; r/r kitchen cabinets & bathroom fixtures; update plumbing to comply w/ current code; elect. upgrade & installation to comply with current energy code; no wall demolition or wall construction.Details
remove & replace kitchen wall plaster, replace w/ drywall throughout unit, no change in layout; r/r kitchen cabinets & bathroom fixtures; update plumbing to comply w/ current code; elect. upgrade & installation to comply with current energy code; no wall demolition or wall construction. | $20,000 |
| Jan 31, 2024 | Completed final sign-off Sep 2024 | 810 Hyde St | unit# 406 remodel kitchen and bathroom: no layout changes and no structural workDetails
unit# 406 remodel kitchen and bathroom: no layout changes and no structural work | $28,000 |
| Jan 31, 2024 | Completed final sign-off Oct 2024 | 1800 Pacific Av | unit 605: remodel kitchen and bathroom. no layout changes. no structural work.Details
unit 605: remodel kitchen and bathroom. no layout changes. no structural work. | $35,000 |
| Jun 7, 2023 | Completed final sign-off Jan 2024 | 1800 Pacific Av | one bathroom and kitchen remodelDetails
one bathroom and kitchen remodel | $15,000 |
| Nov 22, 2022 | Completed final sign-off Nov 2023 | 1800 Pacific Av | apt 902: remodel bathroom kitchen in-kind and paintingDetails
apt 902: remodel bathroom kitchen in-kind and painting | $18,000 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 1701 Jackson St | apt 302: remodel 1 bathroom. relace floor tiles only.Details
apt 302: remodel 1 bathroom. relace floor tiles only. | $3,500 |
| Aug 31, 2020 | Completed final sign-off Mar 2021 | 1714 Mckinnon Av | construct 2 bedroom, 2 full bath, media room, & rebuilt interior staircase at ground floor.Details
construct 2 bedroom, 2 full bath, media room, & rebuilt interior staircase at ground floor. | $82,000 |
| Feb 25, 2020 | Completed final sign-off Mar 2021 | 1714 Mckinnon Av | remodel extg kitchen. relocate extg bath room and add one bath room. all work at 2nd floor.Details
remodel extg kitchen. relocate extg bath room and add one bath room. all work at 2nd floor. | $36,000 |
| Sep 6, 2018 | Never finaled issued Feb 2019, no final | 239 Monterey Bl | basement: add 1 full bath, family rm, & interior stairs. 1/f: add 1 bedroom & 1 full bath. 2/f: remodel kitchen & add half bath & laundry. 3/f: remodel bath & add 1 full bath.Details
basement: add 1 full bath, family rm, & interior stairs. 1/f: add 1 bedroom & 1 full bath. 2/f: remodel kitchen & add half bath & laundry. 3/f: remodel bath & add 1 full bath. | $120,000 |
| Nov 30, 2017 | Completed final sign-off Sep 2023 | 126 Hugo St | legalize as built unit (unit 126a) per odrinance 43-14 on 1st flr w/ a bdrm, a full bath, powder rm, kitchen/living rm, office room & media room per plan. to comply with nov #201700151.Details
legalize as built unit (unit 126a) per odrinance 43-14 on 1st flr w/ a bdrm, a full bath, powder rm, kitchen/living rm, office room & media room per plan. to comply with nov #201700151. | $21,000 |
| Mar 24, 2017 | Completed final sign-off Jun 2018 | 1586 25th Av | new full bathroom and family room at 1st floor behind garage areaDetails
new full bathroom and family room at 1st floor behind garage area | $30,000 |
| Mar 13, 2017 | Completed final sign-off Jan 2018 | 142 Otsego Av | construct 2 bedrooms, 1 full bath room, media room at ground floor; remodel existing kitchen, bath room & construct new bath room at 2nd floor; construct new deck with staircase at rear o f buildingDetails
construct 2 bedrooms, 1 full bath room, media room at ground floor; remodel existing kitchen, bath room & construct new bath room at 2nd floor; construct new deck with staircase at rear o f building | $72,000 |
| Sep 2, 2016 | Completed final sign-off Mar 2017 | 2530 42nd Av | remodel (e) kitchen, bathroom & re-wire elect lighting. all work at 2nd floor.Details
remodel (e) kitchen, bathroom & re-wire elect lighting. all work at 2nd floor. | $20,000 |
| Feb 26, 2016 | Completed final sign-off Aug 2016 | 1973 48th Av | remodel kitchen, remodel two bathroom; (1) 1/2 bath downstairs. four sliding doors at rear, house painting. max u factor 0.32Details
remodel kitchen, remodel two bathroom; (1) 1/2 bath downstairs. four sliding doors at rear, house painting. max u factor 0.32 | $25,000 |
| Oct 19, 2015 | Completed final sign-off Sep 2018 | 1339 47th Av | add 2 bedrooms and 1 bathroom in (e) basement. remodel upstairs bathroom, relocate kitchen and convert (e) kitchen into bedroomDetails
add 2 bedrooms and 1 bathroom in (e) basement. remodel upstairs bathroom, relocate kitchen and convert (e) kitchen into bedroom | $60,000 |
| Sep 23, 2015 | Completed final sign-off Sep 2016 | 2201 44th Av | 1) interior remodeling of s.f.d. 2) add 2 bedrooms and one bathroom at 1st floor. 3)add one bedroom and one bathroom at 2nd floor. 4) remodeling of extg kitchen at 2nd floor. 5) mech, elec, plbg under separate permitDetails
1) interior remodeling of s.f.d. 2) add 2 bedrooms and one bathroom at 1st floor. 3)add one bedroom and one bathroom at 2nd floor. 4) remodeling of extg kitchen at 2nd floor. 5) mech, elec, plbg under separate permit | $80,000 |
| Sep 10, 2015 | Completed final sign-off Jul 2016 | 1953 Stockton St | remodel bathroom, kitchen at #1953. three bedroom and hallway, remove plaster, install sheetrock and painting. install new wire to light and outlet. repair damaged plaster only.Details
remodel bathroom, kitchen at #1953. three bedroom and hallway, remove plaster, install sheetrock and painting. install new wire to light and outlet. repair damaged plaster only. | $35,000 |
| Aug 12, 2015 | Completed final sign-off Dec 2015 | 55 Cotter St | add one powder room & (e) bathroom remodel on 2nd floor per plan.Details
add one powder room & (e) bathroom remodel on 2nd floor per plan. | $20,000 |
| Jul 27, 2015 | Completed final sign-off Dec 2016 | 2054 48th Av | interior remodel: add two bedrooms, & one full bath at ground floor. add laundry in garageDetails
interior remodel: add two bedrooms, & one full bath at ground floor. add laundry in garage | $40,000 |
| Mar 31, 2015 | Completed final sign-off Sep 2015 | 1759 18th Av | 1. remodel (e) bathroom - construct 1 (n) full bath. relocate kitchen & convert to home office at 2nd flr. 2. re-wire elect lighting for 2nd flrDetails
1. remodel (e) bathroom - construct 1 (n) full bath. relocate kitchen & convert to home office at 2nd flr. 2. re-wire elect lighting for 2nd flr | $35,000 |
| Dec 24, 2014 | Completed final sign-off Feb 2015 | 2039 32nd Av | remodel bathroom. like for like, no moving of fixtures.Details
remodel bathroom. like for like, no moving of fixtures. | $6,000 |
| Oct 27, 2014 | Completed final sign-off May 2015 | 1136 Leavenworth St | legalize family room, home office, and bath room at ground floor.Details
legalize family room, home office, and bath room at ground floor. | $36,000 |
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 845 Joost Av | legalize 3 bedrooms, 2 baths, family room. all work at gr flDetails
legalize 3 bedrooms, 2 baths, family room. all work at gr fl | $58,000 |
| Aug 18, 2014 | Completed final sign-off Feb 2015 | 2223 47th Av | construct one bedroom one family room & one full bathroom, all work at ground floorDetails
construct one bedroom one family room & one full bathroom, all work at ground floor | $30,000 |
| Aug 4, 2014 | Completed final sign-off Feb 2015 | 2223 47th Av | 2nd flr remodel kitchen and bathroomDetails
2nd flr remodel kitchen and bathroom | $16,500 |
| May 27, 2014 | Completed final sign-off Dec 2014 | 416 Wilde Av | 1)legalize one bath room. one bed room, & construct one full bath room, one bedroom, storage room at ground floor. 2)construct new deck with staircase at rear of bldg. size approx 17'-0" x 7'-0"Details
1)legalize one bath room. one bed room, & construct one full bath room, one bedroom, storage room at ground floor. 2)construct new deck with staircase at rear of bldg. size approx 17'-0" x 7'-0" | $42,000 |
| Mar 3, 2014 | Completed final sign-off Apr 2015 | 1136 Leavenworth St | remodel kitchen & bathroom on middle level unit. no change in walls & opening layout. kitchen lighting min 50% wattage high efficacy. bath room light shall be high efficacy or controlled by manual on sensor.Details
remodel kitchen & bathroom on middle level unit. no change in walls & opening layout. kitchen lighting min 50% wattage high efficacy. bath room light shall be high efficacy or controlled by manual on sensor. | $15,000 |
| Sep 9, 2013 | Completed final sign-off Mar 2014 | 1290 38th Av | construct one bed room, play room, half bath room. all work at ground floor.Details
construct one bed room, play room, half bath room. all work at ground floor. | $34,000 |
| Apr 16, 2013 | Completed final sign-off Nov 2013 | 1800 Pacific Av | work in unit 1002: kitchen replace cabinet, countertop, appliance. two bathroom: replace tile and fixture.Details
work in unit 1002: kitchen replace cabinet, countertop, appliance. two bathroom: replace tile and fixture. | $20,000 |
| Mar 25, 2013 | Completed final sign-off Aug 2013 | 169 Bertita St | comply with complaint# 201392281-legalize 2 bedrooms, 1 bathroom & laundry room. all work at ground floorDetails
comply with complaint# 201392281-legalize 2 bedrooms, 1 bathroom & laundry room. all work at ground floor | $32,000 |
| Dec 10, 2012 | Completed final sign-off Nov 2013 | 2547 31st Av | legalize one bedroom, one full bathroom & family room. all work at ground floor.Details
legalize one bedroom, one full bathroom & family room. all work at ground floor. | $32,000 |
| Jul 20, 2012 | Completed final sign-off Jan 2013 | 3245 Clay St | #7- replace kitchen cabinet & counter top, replace bathroom bathtub & tile, no lighting change.Details
#7- replace kitchen cabinet & counter top, replace bathroom bathtub & tile, no lighting change. | $8,000 |
| Jul 9, 2012 | Completed final sign-off Dec 2012 | 631 Madrid St | comply w/complaint #201069234,20107032,201100201,201106961,201117621,200727052, 200871924: remodle (e) kitchen, (2) bathroom, replace (n) sheetrock w/r-13 insulation & re-wire electrical at second floor. remove bathroom & all rooms at ground floor & remove illegal room at rear yard.Details
comply w/complaint #201069234,20107032,201100201,201106961,201117621,200727052, 200871924: remodle (e) kitchen, (2) bathroom, replace (n) sheetrock w/r-13 insulation & re-wire electrical at second floor. remove bathroom & all rooms at ground floor & remove illegal room at rear yard. | $28,000 |
| Jun 29, 2012 | Never finaled issued Jul 2012, no final | 149 Lawrence Av | revisoin to appl #2011.09.06.3886 - re-arrange bedrooms, bathrooms for ground floor, 2nd floor & 3rd floor.Details
revisoin to appl #2011.09.06.3886 - re-arrange bedrooms, bathrooms for ground floor, 2nd floor & 3rd floor. | $10,000 |
| Jun 22, 2012 | Completed final sign-off Mar 2013 | 808 Capitol Av | comply with 201223541 and 201231641. remove metal fence. remodel e kitchen, bath rm. replace fixtures, counter cabinet and flooring 1st fl. divider e bath room into 2 bathrooms. remodel 1 bath, add 1 new bath at 2nd flDetails
comply with 201223541 and 201231641. remove metal fence. remodel e kitchen, bath rm. replace fixtures, counter cabinet and flooring 1st fl. divider e bath room into 2 bathrooms. remodel 1 bath, add 1 new bath at 2nd fl | $36,000 |
| Oct 28, 2011 | Completed final sign-off Feb 2012 | 810 Hyde St | remodel bathrooms in apt. #201, 401, 501, 601: bathroom and kitchen open wall for plumbing replace water piping and repair the wall.Details
remodel bathrooms in apt. #201, 401, 501, 601: bathroom and kitchen open wall for plumbing replace water piping and repair the wall. | $15,000 |
| Sep 6, 2011 | Completed final sign-off Dec 2013 | 149 Lawrence Av | 1)legalize one bed room, one bath room and construct one new bed room at ground floor.2)remodel kitchen and bath rooms at 2nd floor. 3)remodel bath rooms at third floor.Details
1)legalize one bed room, one bath room and construct one new bed room at ground floor.2)remodel kitchen and bath rooms at 2nd floor. 3)remodel bath rooms at third floor. | $70,000 |
| Jan 10, 2011 | Completed final sign-off Jul 2011 | 125 San Rafael Wy | 1)remodel extg kitchen, two bath and rewire electrical lighting at first floor.2)remodel extg bathroom at 2nd floor.Details
1)remodel extg kitchen, two bath and rewire electrical lighting at first floor.2)remodel extg bathroom at 2nd floor. | $45,000 |
| Jul 26, 2010 | Completed final sign-off Jan 2011 | 135 Ralston St | revision to pa# 2010.06.14.4398 per plan to add one full bath room at ground floorDetails
revision to pa# 2010.06.14.4398 per plan to add one full bath room at ground floor | $10,000 |
| Jul 26, 2010 | Completed final sign-off Dec 2011 | 141 Seville St | add two bedrooms, one full bathroom and one storgae room at existing ground floor.Details
add two bedrooms, one full bathroom and one storgae room at existing ground floor. | $35,000 |
| Jun 14, 2010 | Completed final sign-off Jan 2011 | 135 Ralston St | to respond complaint #201032702: remove illegal kitchen & bathroom & add one (n) full bathroom. legalize two bedroom on (e) ground floor per plan.Details
to respond complaint #201032702: remove illegal kitchen & bathroom & add one (n) full bathroom. legalize two bedroom on (e) ground floor per plan. | $25,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 765 09th Av | remodel kitchen, bathroom & laundry room. at kitchen: replace cabinet & counter, new lighting must comply iwth cec 150 (k); at bathroom replace plumbing fixtures retile walls & foor; at laundry room: repalce washer & dryer; no structural work. work @ #765.Details
remodel kitchen, bathroom & laundry room. at kitchen: replace cabinet & counter, new lighting must comply iwth cec 150 (k); at bathroom replace plumbing fixtures retile walls & foor; at laundry room: repalce washer & dryer; no structural work. work @ #765. | $30,000 |
| Apr 12, 2010 | Completed final sign-off Sep 2010 | 1551 Leavenworth St | remodel kitchen, bathroom; paintingDetails
remodel kitchen, bathroom; painting | $18,000 |
| Mar 9, 2010 | Completed final sign-off Apr 2011 | 831 Grant Av | add 1 new office at 1st floor, remove (e) mezzanine at mezzanine floor, remove (e) bathroom & add new bathroom. add new storage room at 2nd floor. relocate stairs from basement to 2nd floor. work is for 834 grant avenueDetails
add 1 new office at 1st floor, remove (e) mezzanine at mezzanine floor, remove (e) bathroom & add new bathroom. add new storage room at 2nd floor. relocate stairs from basement to 2nd floor. work is for 834 grant avenue | $100,000 |
| Feb 24, 2010 | Completed final sign-off Sep 2010 | 763 09th Av | remodel kitchen, bathroom, painting laundry room. change new washer and dryer. lighting pefr cec 150 ck. dryer connect to ext exhaust.Details
remodel kitchen, bathroom, painting laundry room. change new washer and dryer. lighting pefr cec 150 ck. dryer connect to ext exhaust. | $30,000 |
| Sep 9, 2008 | Completed final sign-off Nov 2008 | 339 Niagara Av | 2/f replace existing bathroom toilet sink bathtub convert shower to closet remodel existing kitchen replace counter top with sink, remove existing pantry and non bearing wall between kitchen and breakfast area remove wall between 2 closets in the east side bedroom ground floor: new partition to newDetails
2/f replace existing bathroom toilet sink bathtub convert shower to closet remodel existing kitchen replace counter top with sink, remove existing pantry and non bearing wall between kitchen and breakfast area remove wall between 2 closets in the east side bedroom ground floor: new partition to new | $21,000 |
| Apr 14, 2008 | Completed final sign-off Aug 2008 | 1575 24th Av | add 2 bedrooms, two full baths, 1 storage/laundry room on existing floor per planDetails
add 2 bedrooms, two full baths, 1 storage/laundry room on existing floor per plan | $48,000 |
| Mar 9, 2007 | Completed final sign-off Sep 2007 | 2115 33rd Av | to convert extg storage and study room into bedrooms and resize bath room and add new laundry room on ground floorDetails
to convert extg storage and study room into bedrooms and resize bath room and add new laundry room on ground floor | $20,000 |
| Dec 13, 2006 | Completed final sign-off Jan 2007 | 1015 Masonic Av | to comply with n.o.v#200684925. remodel apart#11, new sheetrock on walls & ceilings in bedroom, dining room, kitchen and bathroom. new cabinets in kitchen & remodel bathroom.Details
to comply with n.o.v#200684925. remodel apart#11, new sheetrock on walls & ceilings in bedroom, dining room, kitchen and bathroom. new cabinets in kitchen & remodel bathroom. | $20,000 |
| Aug 2, 2006 | Completed final sign-off Jan 2007 | 1547 Leavenworth St | replace from plaster to sheerrock for all rooms. kitchen cabinets, bathroom tiles, (9) windows non facing the street.work to be done on 1549a leavenworthDetails
replace from plaster to sheerrock for all rooms. kitchen cabinets, bathroom tiles, (9) windows non facing the street.work to be done on 1549a leavenworth | $15,000 |
| Aug 4, 2005 | Completed final sign-off Dec 2005 | 1015 Masonic Av | repair fire damage on apt#4 & apt#8 included bathroom and kitchen.Details
repair fire damage on apt#4 & apt#8 included bathroom and kitchen. | $28,000 |
| Jun 24, 2004 | Completed final sign-off Aug 2004 | 490 33rd Av | bathroom&kitchen remodel-chg bathroom, bathtub, tile.chg kitchen cabinet, counter top&tile.painting.Details
bathroom&kitchen remodel-chg bathroom, bathtub, tile.chg kitchen cabinet, counter top&tile.painting. | $11,000 |
| Apr 2, 2003 | Completed final sign-off Jul 2003 | 184 Palm Av | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $12,000 |
| Jun 26, 2002 | Completed final sign-off Jan 2003 | 4075 California St | remodel 4/f unit #3 kitchen bathroomDetails
remodel 4/f unit #3 kitchen bathroom | $25,000 |
| Apr 16, 2001 | Completed final sign-off Jun 2001 | 1554 19th Av | remodel bathroom. no structural work.Details
remodel bathroom. no structural work. | $4,200 |
| Jun 1, 2000 | Expired or cancelled expired Feb 2001 | 3321 17th St | replace sheetrock, replace floor in kitchen and bathroom work in unit 21Details
replace sheetrock, replace floor in kitchen and bathroom work in unit 21 | $12,500 |