Back to kitchen remodel contractors
Yama Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2004 to May 2026
- Last 24 months
- 3 permits filed
61 permits since 2000: 43 completed, 1 in progress, 6 never finaled, 11 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 10 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2014 | Completed final sign-off Sep 2015 | 1 Rosella Ct | add full bathroom, remodel existing bathroom, add counter top extension in kitchen on 2nd floor, construct interior stairs, add two bedrooms, family room and a full bathroom on the first floor. add rear deck.Details
add full bathroom, remodel existing bathroom, add counter top extension in kitchen on 2nd floor, construct interior stairs, add two bedrooms, family room and a full bathroom on the first floor. add rear deck. | $70,000 |
| Jul 18, 2014 | Completed final sign-off Oct 2014 | 521 03rd St | replace kitchen hood at existing location per plan. n/a maher ordinanceDetails
replace kitchen hood at existing location per plan. n/a maher ordinance | $4,000 |
| Feb 28, 2013 | Completed final sign-off Jul 2013 | 1760 Cesar Chavez St | change of use. suite g & h. interior ti to accomodate a commercial kitchen incl new interior wall, doors, ceiling, finishes, plumbing fixture & the associated plumbing, mechanical & electrical work. a type 1 hood will be installed.Details
change of use. suite g & h. interior ti to accomodate a commercial kitchen incl new interior wall, doors, ceiling, finishes, plumbing fixture & the associated plumbing, mechanical & electrical work. a type 1 hood will be installed. | $120,000 |
| Jun 29, 2010 | Completed final sign-off Sep 2010 | 847 North Point St | kitchen aremodel in rear residential building. new lighting comply w/ cec 150.Details
kitchen aremodel in rear residential building. new lighting comply w/ cec 150. | $10,000 |
| May 27, 2010 | Completed final sign-off Aug 2010 | 426 Larkin St | tenant improvemnet. install new kitchen hood and exhaust system cooking equipment to (e) restaurantDetails
tenant improvemnet. install new kitchen hood and exhaust system cooking equipment to (e) restaurant | $32,688 |
| May 1, 2009 | Completed final sign-off Jul 2009 | 2914 Larkin St | front bldg. - remodel (reconfigure) kitchen, laundry & bathroom; replace water heater.Details
front bldg. - remodel (reconfigure) kitchen, laundry & bathroom; replace water heater. | $15,000 |
| Aug 28, 2008 | Never finaled issued Aug 2008, no final | 298 Gough St | upgrade restrooms to ada compliance. remove (e) partition wall, new opening between kitchen and waitress station.Details
upgrade restrooms to ada compliance. remove (e) partition wall, new opening between kitchen and waitress station. | $15,000 |
| Jan 11, 2008 | Completed final sign-off Mar 2008 | 1261 Folsom St | fix & repair dry rot on back dishwasher room & kitchen floor, approx. 8' x 10' subfloor repair.Details
fix & repair dry rot on back dishwasher room & kitchen floor, approx. 8' x 10' subfloor repair. | $2,500 |
| Feb 27, 2007 | Expired or cancelled expired Jan 2008 | 88 Division St | installation kitchen hood, extinguishing system under separate permit. 2006/03/13/6499 change in use to a-3Details
installation kitchen hood, extinguishing system under separate permit. 2006/03/13/6499 change in use to a-3 | $23,000 |
| Nov 2, 2006 | Completed final sign-off Jan 2007 | 420 Austin St | correction on 3r-4605. insulation to air duct, installation of hand rails 1st & 2nd floor. installation of smoke detector on bedroom, garage ceiling patching, kitchen & bathroom. check on plumbing, electrical check - repair.Details
correction on 3r-4605. insulation to air duct, installation of hand rails 1st & 2nd floor. installation of smoke detector on bedroom, garage ceiling patching, kitchen & bathroom. check on plumbing, electrical check - repair. | $15,000 |
| Jul 24, 2006 | Expired or cancelled expired Aug 2006 | 300 03rd St | remodeling the kitchen. change all cabinet + appl. on the same place + spot. 2 bathroom. put marble + travel time, vanity all new but the same as side as old one. hardwood floor new on guest room & refinish all hardwood flr, base molding + crown all new closet cabinet. all time & material pay systemDetails
remodeling the kitchen. change all cabinet + appl. on the same place + spot. 2 bathroom. put marble + travel time, vanity all new but the same as side as old one. hardwood floor new on guest room & refinish all hardwood flr, base molding + crown all new closet cabinet. all time & material pay system | $35,000 |
| Sep 15, 2004 | Completed final sign-off Mar 2005 | 1306 Sanchez St | replace kitchen cabinets,sink,fixtures,bathroom shower pan,cabinet,light fixtures,doors,mirrors,Details
replace kitchen cabinets,sink,fixtures,bathroom shower pan,cabinet,light fixtures,doors,mirrors, | $11,000 |
| Jan 6, 2004 | Completed final sign-off Apr 2004 | 1359 20th Av | renovation of bathroom, repair door & windows, vinyl sheet in kitchen (n) countertops & sinkDetails
renovation of bathroom, repair door & windows, vinyl sheet in kitchen (n) countertops & sink | $5,000 |