Back to bathroom remodel contractors
Yama Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2004 to May 2026
- Last 24 months
- 3 permits filed
61 permits since 2000: 43 completed, 1 in progress, 6 never finaled, 11 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 2274 Lombard St | existing bathroom make it ada comply. maher n/a.Details
existing bathroom make it ada comply. maher n/a. | $10,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 2851 Taylor St | bathroom dry rot repair and stucco.Details
bathroom dry rot repair and stucco. | $2,500 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 3699 17th St | g/f- change of use (m) to (b) to establish medical services use - non-structural t.i. work to include new windows in existing opening.new partitions, finishes, plumbing fixtures, ada bathroom upgrade. elec, lighting, plbg & mech to be design build under separate permit.Details
g/f- change of use (m) to (b) to establish medical services use - non-structural t.i. work to include new windows in existing opening.new partitions, finishes, plumbing fixtures, ada bathroom upgrade. elec, lighting, plbg & mech to be design build under separate permit. | $80,000 |
| Sep 30, 2014 | Completed final sign-off Sep 2015 | 1 Rosella Ct | add full bathroom, remodel existing bathroom, add counter top extension in kitchen on 2nd floor, construct interior stairs, add two bedrooms, family room and a full bathroom on the first floor. add rear deck.Details
add full bathroom, remodel existing bathroom, add counter top extension in kitchen on 2nd floor, construct interior stairs, add two bedrooms, family room and a full bathroom on the first floor. add rear deck. | $70,000 |
| Jun 9, 2009 | Completed final sign-off Aug 2009 | 2926 Larkin St | replace sheetrock & insulate master bedroom wall. repair wood ceiling in laundry rm. replace walls & ceiling in bath. install dryer vent in porch, change lights to light fan in bathroom.Details
replace sheetrock & insulate master bedroom wall. repair wood ceiling in laundry rm. replace walls & ceiling in bath. install dryer vent in porch, change lights to light fan in bathroom. | $8,500 |
| May 1, 2009 | Completed final sign-off Jul 2009 | 2914 Larkin St | front bldg. - remodel (reconfigure) kitchen, laundry & bathroom; replace water heater.Details
front bldg. - remodel (reconfigure) kitchen, laundry & bathroom; replace water heater. | $15,000 |
| Nov 2, 2006 | Completed final sign-off Jan 2007 | 420 Austin St | correction on 3r-4605. insulation to air duct, installation of hand rails 1st & 2nd floor. installation of smoke detector on bedroom, garage ceiling patching, kitchen & bathroom. check on plumbing, electrical check - repair.Details
correction on 3r-4605. insulation to air duct, installation of hand rails 1st & 2nd floor. installation of smoke detector on bedroom, garage ceiling patching, kitchen & bathroom. check on plumbing, electrical check - repair. | $15,000 |
| Jul 24, 2006 | Expired or cancelled expired Aug 2006 | 300 03rd St | remodeling the kitchen. change all cabinet + appl. on the same place + spot. 2 bathroom. put marble + travel time, vanity all new but the same as side as old one. hardwood floor new on guest room & refinish all hardwood flr, base molding + crown all new closet cabinet. all time & material pay systemDetails
remodeling the kitchen. change all cabinet + appl. on the same place + spot. 2 bathroom. put marble + travel time, vanity all new but the same as side as old one. hardwood floor new on guest room & refinish all hardwood flr, base molding + crown all new closet cabinet. all time & material pay system | $35,000 |
| Sep 15, 2004 | Completed final sign-off Mar 2005 | 1306 Sanchez St | replace kitchen cabinets,sink,fixtures,bathroom shower pan,cabinet,light fixtures,doors,mirrors,Details
replace kitchen cabinets,sink,fixtures,bathroom shower pan,cabinet,light fixtures,doors,mirrors, | $11,000 |
| Jan 6, 2004 | Completed final sign-off Apr 2004 | 1359 20th Av | renovation of bathroom, repair door & windows, vinyl sheet in kitchen (n) countertops & sinkDetails
renovation of bathroom, repair door & windows, vinyl sheet in kitchen (n) countertops & sink | $5,000 |