Xin Xin Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Oct 2026
- Last 24 months
- 21 permits filed
42 permits since 2000: 20 completed, 15 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 6 completed, 9 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 127 Northridge Rd | drywall repair in kitchen approx 2 square feet.Details
drywall repair in kitchen approx 2 square feet. | $3,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 580 Capp St | install new kitchen cabinets, countertop, bathroom cabinet, sink & faucets. new light fixtures in kitchen, plumbing fixture in kitchen countertop. replace electrical outlet as needed & complete all necessary electrical connectionsDetails
install new kitchen cabinets, countertop, bathroom cabinet, sink & faucets. new light fixtures in kitchen, plumbing fixture in kitchen countertop. replace electrical outlet as needed & complete all necessary electrical connections | $9,000 |
| Jan 22, 2026 | Completed final sign-off Feb 2026 | 1201 Golden Gate Av | apt#420: new kitchen countertopDetails
apt#420: new kitchen countertop | $3,000 |
| Jan 22, 2026 | Completed final sign-off Feb 2026 | 1201 Golden Gate Av | apt#408: new kitchen countertopDetails
apt#408: new kitchen countertop | $3,000 |
| Dec 8, 2025 | In progress issued Dec 2025 | 1201 Golden Gate Av | unit 523: new kitchen countertops, adding electrical outlets and updated plumbing in kitchen.Details
unit 523: new kitchen countertops, adding electrical outlets and updated plumbing in kitchen. | $3,000 |
| Sep 29, 2025 | In progress issued Sep 2025 | 1066 Mission St | unit 209: remove & replace sheetrock, patch up work, kitchen in-kind. existing accessible features to be maintainedDetails
unit 209: remove & replace sheetrock, patch up work, kitchen in-kind. existing accessible features to be maintained | $5,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 2770 Lombard St | unit #216: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodelDetails
unit #216: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodel | $5,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 2770 Lombard St | unit #209: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitch & bath remodel.Details
unit #209: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitch & bath remodel. | $5,000 |
| Jul 10, 2025 | Expired or cancelled suspend Aug 2025 | 2770 Lombard St | unit 407: replace countertop in kitchen and bathroom.Details
unit 407: replace countertop in kitchen and bathroom. | $2,000 |
| Jun 16, 2025 | In progress issued Jun 2025 | 580 Capp St | #509: countertop replacement in kitchen.Details
#509: countertop replacement in kitchen. | $1,500 |
| Jun 16, 2025 | In progress issued Jun 2025 | 1201 Golden Gate Av | #403: countertop replacementin kitchen.Details
#403: countertop replacementin kitchen. | $1,500 |
| May 27, 2025 | In progress issued May 2025 | 580 Capp St | #208: remodel kitchen in kind.Details
#208: remodel kitchen in kind. | $1,500 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 1820 Post St | unit #1820a: replace kitchen countertop; no other work; no changes to appliances and fixtures.Details
unit #1820a: replace kitchen countertop; no other work; no changes to appliances and fixtures. | $2,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 54 Mcallister St | no. lite changes. replace kitchen cabinets, no new appliances. provide wiring method for kitchen hood, fan connection provide gfi and tanger resistant receptacles. #206. no changes to wall locations or removal of walls.Details
no. lite changes. replace kitchen cabinets, no new appliances. provide wiring method for kitchen hood, fan connection provide gfi and tanger resistant receptacles. #206. no changes to wall locations or removal of walls. | $5,000 |
| Aug 18, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan.Details
to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan. | $100,000 |
| May 27, 2014 | Completed final sign-off Dec 2014 | 227 Farallones St | 1)to add 2 bed rooms, one full bath room and laundry on extg ground floor per plan. 2)to add one half bath room, remodel extg bathroom and kitchen, rewire and change extg lighting on 2nd floor per plan.Details
1)to add 2 bed rooms, one full bath room and laundry on extg ground floor per plan. 2)to add one half bath room, remodel extg bathroom and kitchen, rewire and change extg lighting on 2nd floor per plan. | $65,000 |
| Mar 30, 2010 | Completed final sign-off Nov 2011 | 20 Hoffman Av | flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level.Details
flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level. | $82,000 |