Xin Xin Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Oct 2026
- Last 24 months
- 21 permits filed
42 permits since 2000: 20 completed, 15 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 27 days from filing to permit and 400 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2014 | Expired or cancelled withdrawn Jun 2017 | 1332 Anza St | interior remodel. add new bath. infill lightwell for both units. for 1332 only add interior stairs to garage. convert storage space to bedroom and bath, no addition beyond existing building envelope.Details
interior remodel. add new bath. infill lightwell for both units. for 1332 only add interior stairs to garage. convert storage space to bedroom and bath, no addition beyond existing building envelope. | $30,000 |
| Oct 9, 2014 | Never finaled issued Oct 2014, no final | 1974 43rd Av | termite repair in basement dry rot. report# 13590 4a 6a 1c,1b, 10a only less than 50% stair repair.Details
termite repair in basement dry rot. report# 13590 4a 6a 1c,1b, 10a only less than 50% stair repair. | $1,000 |
| Oct 13, 2011 | Completed final sign-off Dec 2012 | 2121 Noriega St | interior remodeling: add (n) family room, (n) guest room, (n) full bath & (n) laundry area at ground floor. add (n) rear exterior wooden stairs at (e) building as per plan.Details
interior remodeling: add (n) family room, (n) guest room, (n) full bath & (n) laundry area at ground floor. add (n) rear exterior wooden stairs at (e) building as per plan. | $38,000 |
| Mar 30, 2010 | Completed final sign-off Nov 2011 | 20 Hoffman Av | flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level.Details
flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level. | $82,000 |