Back to bathroom remodel contractors
Xin Xin Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Oct 2026
- Last 24 months
- 21 permits filed
42 permits since 2000: 20 completed, 15 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 8 completed, 5 in progress, 2 expired or cancelled. Typically 8 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2026 | In progress issued Apr 2026 | 580 Capp St | install new kitchen cabinets, countertop, bathroom cabinet, sink & faucets. new light fixtures in kitchen, plumbing fixture in kitchen countertop. replace electrical outlet as needed & complete all necessary electrical connectionsDetails
install new kitchen cabinets, countertop, bathroom cabinet, sink & faucets. new light fixtures in kitchen, plumbing fixture in kitchen countertop. replace electrical outlet as needed & complete all necessary electrical connections | $9,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 2770 Lombard St | unit #216: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodelDetails
unit #216: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitchen & bath remodel | $5,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 2770 Lombard St | unit #209: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitch & bath remodel.Details
unit #209: install kitchen cabinets, countertop & plumbing fixtures. install bathroom cabinets, sink & faucets, drywall around outlets. in kind kitch & bath remodel. | $5,000 |
| Jul 10, 2025 | Expired or cancelled suspend Aug 2025 | 2770 Lombard St | unit 407: replace countertop in kitchen and bathroom.Details
unit 407: replace countertop in kitchen and bathroom. | $2,000 |
| May 2, 2025 | In progress issued May 2025 | 580 Capp St | revision to 202504245185 (apt 208) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction cost valuation.Details
revision to 202504245185 (apt 208) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction cost valuation. | |
| May 2, 2025 | In progress issued May 2025 | 580 Capp St | revision to 202504245188 (apt 402) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction.Details
revision to 202504245188 (apt 402) to include work to remodel the bathroom. no change in plumbing fixture count, no wall demolition or construction. applicant stated no plumbing or electrical work being performed. field inspector to confirm appropriateness of revised construction. | |
| Nov 14, 2014 | Expired or cancelled withdrawn Jun 2017 | 1332 Anza St | interior remodel. add new bath. infill lightwell for both units. for 1332 only add interior stairs to garage. convert storage space to bedroom and bath, no addition beyond existing building envelope.Details
interior remodel. add new bath. infill lightwell for both units. for 1332 only add interior stairs to garage. convert storage space to bedroom and bath, no addition beyond existing building envelope. | $30,000 |
| Aug 18, 2014 | Completed final sign-off Jul 2015 | 763 32nd Av | to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan.Details
to add two bedroom, one family room, two full bathrooms & laundry /hall on existing ground floor per plan. to add one full bathroom & remodel existing kitchen, bathroom on 2nd floor per plan. | $100,000 |
| May 27, 2014 | Completed final sign-off Dec 2014 | 227 Farallones St | 1)to add 2 bed rooms, one full bath room and laundry on extg ground floor per plan. 2)to add one half bath room, remodel extg bathroom and kitchen, rewire and change extg lighting on 2nd floor per plan.Details
1)to add 2 bed rooms, one full bath room and laundry on extg ground floor per plan. 2)to add one half bath room, remodel extg bathroom and kitchen, rewire and change extg lighting on 2nd floor per plan. | $65,000 |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 279 Seneca Av | revision to 201112231263: relocate existing full bath and convert existing storage to new study room on gr floorDetails
revision to 201112231263: relocate existing full bath and convert existing storage to new study room on gr floor | $500 |
| Mar 19, 2012 | Completed final sign-off Dec 2012 | 2700 Ulloa St | add a guest room, a bedroom, a family room and bath on 1st floor for single family use. add side door off bedroom at 1st fl.Details
add a guest room, a bedroom, a family room and bath on 1st floor for single family use. add side door off bedroom at 1st fl. | $55,000 |
| Jan 12, 2012 | Completed final sign-off Jul 2013 | 2701 Pacheco St | to add 2 bedroom,2 full bathroom, and laundry area on extg ground floor per plans.Details
to add 2 bedroom,2 full bathroom, and laundry area on extg ground floor per plans. | $40,000 |
| Dec 23, 2011 | Completed final sign-off Jan 2013 | 279 Seneca Av | interior remodeling; adding two new bedrooms, two new bathrooms and storage at ground floor as per plan.Details
interior remodeling; adding two new bedrooms, two new bathrooms and storage at ground floor as per plan. | $48,000 |
| Oct 13, 2011 | Completed final sign-off Dec 2012 | 2121 Noriega St | interior remodeling: add (n) family room, (n) guest room, (n) full bath & (n) laundry area at ground floor. add (n) rear exterior wooden stairs at (e) building as per plan.Details
interior remodeling: add (n) family room, (n) guest room, (n) full bath & (n) laundry area at ground floor. add (n) rear exterior wooden stairs at (e) building as per plan. | $38,000 |
| Mar 30, 2010 | Completed final sign-off Nov 2011 | 20 Hoffman Av | flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level.Details
flatten the pitch roof at back portion of the house by building new exterior walls. reduce size of (e) roof deck. add 1 more full bathroom & 1 (n) bedroom on 3rd level. relocate stairway & remodel kitchen & bathroom on 2nd floor. add 1 half bath & 1 laundry room on 1st level. | $82,000 |