Back to kitchen remodel contractors
X T General Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Sep 2019
- Last 24 months
- 0 permits filed
66 permits since 2000: 51 completed, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 21 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2019 | Completed final sign-off Apr 2021 | 2167 27th Av | rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st flDetails
rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st fl | $60,000 |
| Aug 15, 2014 | Completed final sign-off Sep 2014 | 479 03rd St | disconnection gas pipes in the kitchen for 2 & 3/f (1 at each floor); add 2 electrical outlets in those kitchens; patching holes in the hallway & kitchen walls.Details
disconnection gas pipes in the kitchen for 2 & 3/f (1 at each floor); add 2 electrical outlets in those kitchens; patching holes in the hallway & kitchen walls. | $2,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 2721 Golden Gate Av | new first floor water closet and interior remodel of existing 2nd fl bath and kitchenDetails
new first floor water closet and interior remodel of existing 2nd fl bath and kitchen | $50,000 |
| May 13, 2014 | Completed final sign-off Jul 2015 | 65 Carr St | repair rear stair (exterior - less than 50%), repair all wood rot at right side approximate area 9'x 8', replace kitchen cabinets & countertop, sink, faucet, replace heating system. no work visible to street. all repairs in-kind.Details
repair rear stair (exterior - less than 50%), repair all wood rot at right side approximate area 9'x 8', replace kitchen cabinets & countertop, sink, faucet, replace heating system. no work visible to street. all repairs in-kind. | $20,000 |
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 860 York St | replace cabinets, countertop, sink, garbage disposal & faucet in the kitchen @ #860 only.Details
replace cabinets, countertop, sink, garbage disposal & faucet in the kitchen @ #860 only. | $6,000 |
| Aug 27, 2013 | Completed final sign-off Jul 2014 | 1015 Capitol Av | replace kitchen cabinets and countertop; repalce bathroom sink, bathtub, and toilet. to comply with cec 150 (k) 8 & 10Details
replace kitchen cabinets and countertop; repalce bathroom sink, bathtub, and toilet. to comply with cec 150 (k) 8 & 10 | $16,000 |
| Apr 19, 2011 | Completed final sign-off Jun 2011 | 123 Chester Av | change sliding glass door (6') in rear. replacement of storage door, water heater and furnace. repalce kitchen counter top, sink, faucet and change light fixtures. replace front door and install security gate. (all (n) lighting must comply with cec 150(k)Details
change sliding glass door (6') in rear. replacement of storage door, water heater and furnace. repalce kitchen counter top, sink, faucet and change light fixtures. replace front door and install security gate. (all (n) lighting must comply with cec 150(k) | $8,000 |
| Nov 13, 2009 | Completed final sign-off Dec 2009 | 1373 Oakdale Av | reapir railings for frotn & rear decking, 42" tall, with redwood. replace shower pent, sink with faucet, toilet in bathroom. replace lights, fans in bathroom & kitchen. replace countertop only in kitchen.Details
reapir railings for frotn & rear decking, 42" tall, with redwood. replace shower pent, sink with faucet, toilet in bathroom. replace lights, fans in bathroom & kitchen. replace countertop only in kitchen. | $10,000 |
| Jul 17, 2009 | Completed final sign-off Nov 2009 | 1415 Newcomb Av | replace 1 window in front of 2nd fl. 1 in kitchen @ 2nd fl. 5 inm bedrooms @ 2nd fl. change base cobinets,counter tops, lights, sink & stove. install sheetrock to ceiling & wall @ garage. replace with u-factor 0.67 max.Details
replace 1 window in front of 2nd fl. 1 in kitchen @ 2nd fl. 5 inm bedrooms @ 2nd fl. change base cobinets,counter tops, lights, sink & stove. install sheetrock to ceiling & wall @ garage. replace with u-factor 0.67 max. | $14,200 |
| Apr 10, 2009 | Completed final sign-off Jun 2009 | 2178 Sutter St | replace rear siding & 4 windows in kind at rear (approx 250 sf), kitchen and bathroom remodel, (no structural work), change cabinets & counters only.Details
replace rear siding & 4 windows in kind at rear (approx 250 sf), kitchen and bathroom remodel, (no structural work), change cabinets & counters only. | $20,000 |
| Feb 18, 2009 | Completed final sign-off Jun 2009 | 1354 35th Av | replace 5 windows in front, 2 windows in kitchen, 1 window in dining, 2 windows in bedrm.Details
replace 5 windows in front, 2 windows in kitchen, 1 window in dining, 2 windows in bedrm. | $3,500 |
| Jan 23, 2009 | Completed final sign-off Jun 2009 | 1354 35th Av | kitchen remodeling (no structural work). change cabinets & counters lighting, plumbing.Details
kitchen remodeling (no structural work). change cabinets & counters lighting, plumbing. | $10,000 |
| Dec 3, 2008 | Completed final sign-off Apr 2009 | 1162 Goettingen St | kitchen & bathroom remodel (no structural work) repair dry rot at bedroom window sill, floor (20 sq. ft) frame, rear, porch. storage rooms, rear wall 50 sq. ft. (downstair) replace driveway / walkway 575 sq. ft.Details
kitchen & bathroom remodel (no structural work) repair dry rot at bedroom window sill, floor (20 sq. ft) frame, rear, porch. storage rooms, rear wall 50 sq. ft. (downstair) replace driveway / walkway 575 sq. ft. | $22,000 |
| Oct 9, 2008 | Completed final sign-off Nov 2008 | 770 42nd Av | replace kitchen cabinets & countertop. kitchen floor area 10x12.Details
replace kitchen cabinets & countertop. kitchen floor area 10x12. | $10,000 |
| Sep 4, 2008 | Never finaled issued Sep 2008, no final | 15 Mirabel Av | revise 200606063321. no addition or extention or expansion to the rear. remodel kitchen. replace front stairs and siding in kind only. all work previously approved under 200606063321.Details
revise 200606063321. no addition or extention or expansion to the rear. remodel kitchen. replace front stairs and siding in kind only. all work previously approved under 200606063321. | |
| Jul 22, 2008 | Expired or cancelled expired Aug 2010 | 21 Caire Tr | kitchen & 2 bathrooms remodeling: no structural work. replace wall & base cabinets plumbing & light fixtures.Details
kitchen & 2 bathrooms remodeling: no structural work. replace wall & base cabinets plumbing & light fixtures. | $15,000 |
| Feb 22, 2008 | Completed final sign-off Nov 2008 | 174 Lowell St | remodel (e)kitchen, bath room and add one bathroom at 1st floor. construct one bathroom, family room, one full bath, one toilet room and remodel one (e) bedroom at ground floor.Details
remodel (e)kitchen, bath room and add one bathroom at 1st floor. construct one bathroom, family room, one full bath, one toilet room and remodel one (e) bedroom at ground floor. | $58,000 |
| Dec 21, 2007 | Completed final sign-off Feb 2008 | 26 Dorantes Av | replacement 8 windows in kitchen & living room family room. 2 windows visable from street.Details
replacement 8 windows in kitchen & living room family room. 2 windows visable from street. | $4,000 |
| Oct 2, 2007 | Completed final sign-off May 2008 | 26 Dorantes Av | remodel kitchen and bathroom. lighting comply with title 24Details
remodel kitchen and bathroom. lighting comply with title 24 | $14,000 |
| Aug 27, 2007 | Completed final sign-off Mar 2008 | 2011 45th Av | kitchen remodel ground floor to add (n) full-bath and (n) interior stairs. remove non-bearing wall to expand (e) kitchen on 2nd floor. replacement in kind windows at rear and side of the building.Details
kitchen remodel ground floor to add (n) full-bath and (n) interior stairs. remove non-bearing wall to expand (e) kitchen on 2nd floor. replacement in kind windows at rear and side of the building. | $20,000 |
| Apr 20, 2007 | Completed final sign-off Sep 2007 | 2 Bob Kaufman Al | all work to be done @ 2 bob kaufman al. remodel kitchen. replace cabinets & countertop. remodel bathroom: replace toilet & bathtub. replace 6 windows. not visible from street.Details
all work to be done @ 2 bob kaufman al. remodel kitchen. replace cabinets & countertop. remodel bathroom: replace toilet & bathtub. replace 6 windows. not visible from street. | $8,000 |
| Apr 16, 2007 | Never finaled issued Apr 2007, no final | 3332 Clay St | update kitchen. replace cabinet & lights. no structural changes. al least 50% lighting wattage must be fluorescent.Details
update kitchen. replace cabinet & lights. no structural changes. al least 50% lighting wattage must be fluorescent. | $8,000 |
| Feb 27, 2007 | Completed final sign-off Jul 2007 | 3330 Clay St | the top unit# a: replace floor tile in the bathroom area & kitchen area. replace bathroom sink. repaint cabinets. add 1 countertop to match (e). unit# b : replace bathroom & kitchen floor tile. repaint cabinet.Details
the top unit# a: replace floor tile in the bathroom area & kitchen area. replace bathroom sink. repaint cabinets. add 1 countertop to match (e). unit# b : replace bathroom & kitchen floor tile. repaint cabinet. | $30,000 |
| Jan 12, 2007 | Expired or cancelled expired Nov 2009 | 1833 21st Av | interior remodel 1st floor remodel kitchen, bathroom, & toilet room, new cabinet, countertop, sink. to comply with nov#200786937. no change on lighting.Details
interior remodel 1st floor remodel kitchen, bathroom, & toilet room, new cabinet, countertop, sink. to comply with nov#200786937. no change on lighting. | $15,000 |
| Dec 10, 2004 | Completed final sign-off Jul 2005 | 701 Sloat Bl | add skylight overkitchen, replacement windows and a new window at previous location.Details
add skylight overkitchen, replacement windows and a new window at previous location. | $25,000 |