Block 3763, lot 022
483 03rd St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 3
- Units
- 2
- Rooms
- 3 bathrooms
- Building
- 4,940 sq ft
- Lot
- 2,125 sq ft
- Zoning
- SLI
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2025 | Completed final sign-off Mar 2026 | 483 03rd St | to obtain final inspection for work approved under pa# 201411050830 + 201409307635. all work is complete.Details
to obtain final inspection for work approved under pa# 201411050830 + 201409307635. all work is complete. | ||
| Jun 14, 2024 | Completed final sign-off Jul 2024 | 479 03rd St | rev to pa202308245169 to capture the (e) conditions at the rear stairs as requested by the inspector. scope all remains the same as approved. revisions include location of the guardrail and partiion walls at rear patio. no work under this permitDetails
rev to pa202308245169 to capture the (e) conditions at the rear stairs as requested by the inspector. scope all remains the same as approved. revisions include location of the guardrail and partiion walls at rear patio. no work under this permit | ||
| Aug 24, 2023 | In progress issued Oct 2023 | 479 03rd St | contruct non-full height partition walls at rear decks on 2nd & 3rd fl. partitioning off the (e) furnace & water heater. legalize added toilet in baths on 2nd & 3rd fl. remodel & reconfig baths (1 on each fl). misc. wall infills & new doorsDetails
contruct non-full height partition walls at rear decks on 2nd & 3rd fl. partitioning off the (e) furnace & water heater. legalize added toilet in baths on 2nd & 3rd fl. remodel & reconfig baths (1 on each fl). misc. wall infills & new doors | $4,000 | |
| Jun 9, 2023 | Completed final sign-off Jun 2023 | 479 03rd St | to comply with complaint 202308583: repair 3 treads of rear staircase.less than 50%.Details
to comply with complaint 202308583: repair 3 treads of rear staircase.less than 50%. | $500 | |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 479 03rd St | street space and mta permitsDetails
street space and mta permits | ||
| Apr 6, 2017 | Completed final sign-off Aug 2018 | 479 03rd St | Allied Teamwork Construction Co | soft story seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. ref #201704063351. n/a maher ordinanceDetails
soft story seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. ref #201704063351. n/a maher ordinance | $80,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2018 | 479 03rd St | Allied Teamwork Construction Co | disabled access check list for ground floor retail space fully compliant per p.a. # 201411050830; 201507212072Details
disabled access check list for ground floor retail space fully compliant per p.a. # 201411050830; 201507212072 | $18,000 |
| Jan 4, 2017 | Completed final sign-off Feb 2017 | 479 03rd St | to reapir staircase (partial wear and tear0 to correct dry rot. to remove exterior wood ladder located at rear elevation of bldg. do structural maintenance compliance affidavit. repair, maintain fire escape drop ladder in working condition. do self certificatjion for smoke alarms and carbonDetails
to reapir staircase (partial wear and tear0 to correct dry rot. to remove exterior wood ladder located at rear elevation of bldg. do structural maintenance compliance affidavit. repair, maintain fire escape drop ladder in working condition. do self certificatjion for smoke alarms and carbon | $500 | |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 483 03rd St | W. S. Construction Co. | erect electric wall sign maher not reqDetails
erect electric wall sign maher not req | $1,600 |
| Oct 13, 2015 | Completed final sign-off Oct 2015 | 483 03rd St | Certified Fire & Safety Co | install ul 300 buckeye fire system to protect kitchen hood and cooking equipment; ref. 201411050830; maher n/aDetails
install ul 300 buckeye fire system to protect kitchen hood and cooking equipment; ref. 201411050830; maher n/a | $3,000 |
| Jul 21, 2015 | Completed final sign-off Feb 2017 | 483 03rd St | S & I Construction, Inc | rev.. to 201411050830- documentation purposes for 201411050830: resubmittal of mep sheets omitted from approved set at issuance and not included in microfilm set. mech review occurred on orig permit.Details
rev.. to 201411050830- documentation purposes for 201411050830: resubmittal of mep sheets omitted from approved set at issuance and not included in microfilm set. mech review occurred on orig permit. | |
| Nov 5, 2014 | Expired or cancelled expired Mar 2026 | 483 03rd St | Brady Construction, S & I Construction, Inc | the scope of work under this application includes the necessary tenant improvements to accommodate a pizza restaurant, this work includes new non-bearing walls to create service rooms and accessible toilet, customer service area; and installation of equipment, mechanical, elec, plmbg fixtures; maherDetails
the scope of work under this application includes the necessary tenant improvements to accommodate a pizza restaurant, this work includes new non-bearing walls to create service rooms and accessible toilet, customer service area; and installation of equipment, mechanical, elec, plmbg fixtures; maher | $95,000 |
| Sep 30, 2014 | Expired or cancelled expired Mar 2026 | 483 03rd St | remove all non-structural construction including walls & ceiling assembles. kitchen equipment, plumbing fixtures & all other finishes. all utilities shall be terminated & be capped for future use. all existing reated assemblies shall remain as is . space will be remain vacant. (ab-017). n/a maher orDetails
remove all non-structural construction including walls & ceiling assembles. kitchen equipment, plumbing fixtures & all other finishes. all utilities shall be terminated & be capped for future use. all existing reated assemblies shall remain as is . space will be remain vacant. (ab-017). n/a maher or | $10,000 | |
| Aug 15, 2014 | Completed final sign-off Sep 2014 | 479 03rd St | X T General Construction Inc. | disconnection gas pipes in the kitchen for 2 & 3/f (1 at each floor); add 2 electrical outlets in those kitchens; patching holes in the hallway & kitchen walls.Details
disconnection gas pipes in the kitchen for 2 & 3/f (1 at each floor); add 2 electrical outlets in those kitchens; patching holes in the hallway & kitchen walls. | $2,000 |
| May 24, 2013 | Completed final sign-off Dec 2013 | 479 03rd St | to comply with ordinance 029-13 only: installation of grab bars in sro at the following locations: second floor (two) toilets, one (1) shower thrid floor two (2) toilets, one (1) shower.Details
to comply with ordinance 029-13 only: installation of grab bars in sro at the following locations: second floor (two) toilets, one (1) shower thrid floor two (2) toilets, one (1) shower. | $200 | |
| Apr 30, 2012 | Completed final sign-off Jun 2012 | 483 03rd St | Jack Yim | revision under pa# 201204168352. remove lavatory / urinal at basement.Details
revision under pa# 201204168352. remove lavatory / urinal at basement. | $500 |
| Apr 16, 2012 | Completed final sign-off Jul 2012 | 483 03rd St | Jack Yim | comply with complaint # 201297713 and 201298553. revision to app# 201104284944. remove non structural partition wall and cap electrical wire in wall verify at field.Details
comply with complaint # 201297713 and 201298553. revision to app# 201104284944. remove non structural partition wall and cap electrical wire in wall verify at field. | $2,000 |
| Feb 29, 2012 | Completed final sign-off Feb 2013 | 479 03rd St | to comply with n.o.v. # 201297713 & 201298553 dry rot repair rear stair landing and steps, handrail repair. repair thermostat for heating system. same for same. cover all electrical junction box.Details
to comply with n.o.v. # 201297713 & 201298553 dry rot repair rear stair landing and steps, handrail repair. repair thermostat for heating system. same for same. cover all electrical junction box. | $300 | |
| Apr 28, 2011 | Completed final sign-off Sep 2012 | 483 03rd St | comply with complaint#200879037,201051267,201052184,201188747,201189346. (4) rooms at basement convert back to original - (storage)Details
comply with complaint#200879037,201051267,201052184,201188747,201189346. (4) rooms at basement convert back to original - (storage) | $1,000 | |
| Jan 25, 2011 | Never finaled issued Jan 2011, no final | 483 03rd St | repair hole in sheetrock. no window; door; ceiling or wall work (except patching)Details
repair hole in sheetrock. no window; door; ceiling or wall work (except patching) | $1,000 | |
| Jul 23, 2010 | Completed final sign-off Oct 2010 | 479 03rd St | to comply with nov 201052184 dated 6/22/2010 - contractor did vertilation ducting for dryer exhaust mechanical seperately.Details
to comply with nov 201052184 dated 6/22/2010 - contractor did vertilation ducting for dryer exhaust mechanical seperately. | $300 | |
| Aug 21, 2007 | Never finaled issued Aug 2007, no final | 479 03rd St | street spaceDetails
street space | ||
| Jul 18, 2007 | Completed final sign-off Sep 2007 | 479 03rd St | Yee Construction Inc. | repair fire damage on 3rd floor exterior walls. replace in kind. approx 10' x 10'.Details
repair fire damage on 3rd floor exterior walls. replace in kind. approx 10' x 10'. | $6,000 |
| Mar 21, 2005 | Completed final sign-off Jun 2005 | 479 03rd St | replace siding to stucco at front of building 2nd & 3rd floor.Details
replace siding to stucco at front of building 2nd & 3rd floor. | $9,000 | |
| Mar 11, 2003 | Completed final sign-off May 2003 | 483 03rd St | proposed alteration existing restaurant. install a party room with karaoke tv.setDetails
proposed alteration existing restaurant. install a party room with karaoke tv.set | $5,000 | |
| Feb 12, 2001 | Completed final sign-off Sep 2001 | 479 03rd St | alteration to extg bldgDetails
alteration to extg bldg | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allied Teamwork Construction Co (2), Jack Yim (2), S & I Construction, Inc (2), Brady Construction, Certified Fire & Safety Co, W. S. Construction Co., X T General Construction Inc., Yee Construction Inc.
- Architects
- David Mena (2), Kok Jin Yeo
- Engineers
- Horon Lee (2), Kok Jin Yeo
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.