X T General Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Sep 2019
- Last 24 months
- 0 permits filed
66 permits since 2000: 51 completed, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2019 | Completed final sign-off Apr 2021 | 2167 27th Av | rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st flDetails
rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st fl | $60,000 |
| May 13, 2014 | Completed final sign-off Jul 2014 | 160 De Soto St | repauir stucco base of front portico, reapply stucco. repair deck at rear providing new railings and decking, sister in joists. (aprox 35%) replace heating system and add 7 lights to basement. all repair in-kind.Details
repauir stucco base of front portico, reapply stucco. repair deck at rear providing new railings and decking, sister in joists. (aprox 35%) replace heating system and add 7 lights to basement. all repair in-kind. | $10,000 |
| Feb 18, 2014 | Completed final sign-off Jul 2014 | 1015 Capitol Av | legalize (e) family room, construct new bathroom & storage room at ground floor. construct new deck w/staircase at rear of bldg (size approx 11'x15').Details
legalize (e) family room, construct new bathroom & storage room at ground floor. construct new deck w/staircase at rear of bldg (size approx 11'x15'). | $38,000 |
| Nov 13, 2009 | Completed final sign-off Dec 2009 | 1373 Oakdale Av | reapir railings for frotn & rear decking, 42" tall, with redwood. replace shower pent, sink with faucet, toilet in bathroom. replace lights, fans in bathroom & kitchen. replace countertop only in kitchen.Details
reapir railings for frotn & rear decking, 42" tall, with redwood. replace shower pent, sink with faucet, toilet in bathroom. replace lights, fans in bathroom & kitchen. replace countertop only in kitchen. | $10,000 |
| Jul 7, 2008 | Completed final sign-off Nov 2008 | 21 Caire Tr | repair dryrot at living rm staircase approx 100 sf. replace siding on the exterior wall of rear 500 sf. repair the damaged wood for the deck on 2nd fl. less than 50%. repair damaged landing in the front stair. less than 50% repair . no change to windows doors.Details
repair dryrot at living rm staircase approx 100 sf. replace siding on the exterior wall of rear 500 sf. repair the damaged wood for the deck on 2nd fl. less than 50%. repair damaged landing in the front stair. less than 50% repair . no change to windows doors. | $10,000 |