Back to bathroom remodel contractors
X T General Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Sep 2019
- Last 24 months
- 0 permits filed
66 permits since 2000: 51 completed, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 22 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2019 | Completed final sign-off Apr 2021 | 2167 27th Av | rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st flDetails
rear deck addition, bath, kitchen remodel and remove wall between kitchen and living rm on 2nd fl and 2 baths, 2 bedrooms, 1 family rm on 1st fl | $60,000 |
| Jun 27, 2018 | Completed final sign-off Sep 2018 | 148 Cuvier St | bathroom renovation = convert (e) bathroom into two seperate baths using (e) footprint of iriginal bath, one new bath will become master bedroom en suite. new closet will be built in master bedroomDetails
bathroom renovation = convert (e) bathroom into two seperate baths using (e) footprint of iriginal bath, one new bath will become master bedroom en suite. new closet will be built in master bedroom | $32,000 |
| Oct 23, 2015 | Completed final sign-off Aug 2016 | 75 Folsom St | unit 1602:remove 2(e) walls and counters, add island, relocate sink, oven and fridge. replace countertop & cabinets w/same. remodel master bath- retile tub and replace vanity with like-kind. remove wall & door between mstr bedrm and backroom. replace vanity & shower door w/same in guest bath..Details
unit 1602:remove 2(e) walls and counters, add island, relocate sink, oven and fridge. replace countertop & cabinets w/same. remodel master bath- retile tub and replace vanity with like-kind. remove wall & door between mstr bedrm and backroom. replace vanity & shower door w/same in guest bath.. | $15,000 |
| Aug 28, 2014 | Completed final sign-off Nov 2014 | 2721 Golden Gate Av | revision to 201406279738. add tall shower at 1st fl bathDetails
revision to 201406279738. add tall shower at 1st fl bath | $1,000 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 2721 Golden Gate Av | new first floor water closet and interior remodel of existing 2nd fl bath and kitchenDetails
new first floor water closet and interior remodel of existing 2nd fl bath and kitchen | $50,000 |
| Feb 18, 2014 | Completed final sign-off Jul 2014 | 1015 Capitol Av | legalize (e) family room, construct new bathroom & storage room at ground floor. construct new deck w/staircase at rear of bldg (size approx 11'x15').Details
legalize (e) family room, construct new bathroom & storage room at ground floor. construct new deck w/staircase at rear of bldg (size approx 11'x15'). | $38,000 |
| Oct 15, 2013 | Completed final sign-off Oct 2013 | 1355 Gilman Av | add hardy - plank on the back wall of the house (250 sq ft 25x10), replace exhaust fan in th bathroom of 2nd floor.Details
add hardy - plank on the back wall of the house (250 sq ft 25x10), replace exhaust fan in th bathroom of 2nd floor. | $3,000 |
| Aug 27, 2013 | Completed final sign-off Jul 2014 | 1015 Capitol Av | replace kitchen cabinets and countertop; repalce bathroom sink, bathtub, and toilet. to comply with cec 150 (k) 8 & 10Details
replace kitchen cabinets and countertop; repalce bathroom sink, bathtub, and toilet. to comply with cec 150 (k) 8 & 10 | $16,000 |
| Jun 21, 2011 | Completed final sign-off Jan 2012 | 484 08th Av | remodel 1 existing bathroom and add 1 new bathroom. all work at 3rd fl. repair (e) fireplace at 2nd flDetails
remodel 1 existing bathroom and add 1 new bathroom. all work at 3rd fl. repair (e) fireplace at 2nd fl | $20,000 |
| Aug 18, 2010 | Completed final sign-off Jun 2011 | 21 Byron Ct | groun/first floor: add 1 full bathroom, convert fam. rm to bedroom, storage to bedroom, install 1 new furnace and duct work; remove walls on ground/first floor and 2nd floor.Details
groun/first floor: add 1 full bathroom, convert fam. rm to bedroom, storage to bedroom, install 1 new furnace and duct work; remove walls on ground/first floor and 2nd floor. | $20,000 |
| Dec 1, 2009 | Completed final sign-off Mar 2010 | 831 14th St | replace bathtub & faucet, replace sink with faucet with bathroom. work in unit #831 14th st. no structural work under this permitDetails
replace bathtub & faucet, replace sink with faucet with bathroom. work in unit #831 14th st. no structural work under this permit | $6,000 |
| Nov 13, 2009 | Completed final sign-off Dec 2009 | 1373 Oakdale Av | reapir railings for frotn & rear decking, 42" tall, with redwood. replace shower pent, sink with faucet, toilet in bathroom. replace lights, fans in bathroom & kitchen. replace countertop only in kitchen.Details
reapir railings for frotn & rear decking, 42" tall, with redwood. replace shower pent, sink with faucet, toilet in bathroom. replace lights, fans in bathroom & kitchen. replace countertop only in kitchen. | $10,000 |
| Aug 17, 2009 | Completed final sign-off Sep 2009 | 96 Caire Tr | replace bathtop, lavatory sink with faucet and toilet in upstairs bath. replace lavatory sink with faucet and toilet in upstairs dressing room. provide drywall to open walls and ceiling in dining room areaDetails
replace bathtop, lavatory sink with faucet and toilet in upstairs bath. replace lavatory sink with faucet and toilet in upstairs dressing room. provide drywall to open walls and ceiling in dining room area | $13,500 |
| Apr 10, 2009 | Completed final sign-off Jun 2009 | 2178 Sutter St | replace rear siding & 4 windows in kind at rear (approx 250 sf), kitchen and bathroom remodel, (no structural work), change cabinets & counters only.Details
replace rear siding & 4 windows in kind at rear (approx 250 sf), kitchen and bathroom remodel, (no structural work), change cabinets & counters only. | $20,000 |
| Mar 20, 2009 | Expired or cancelled expired Apr 2017 | 473 11th Av | remodel (e) bathroom & add new bathroom on 3rd. floor. modify (e) interior stairs.Details
remodel (e) bathroom & add new bathroom on 3rd. floor. modify (e) interior stairs. | $12,000 |
| Dec 3, 2008 | Completed final sign-off Apr 2009 | 1162 Goettingen St | kitchen & bathroom remodel (no structural work) repair dry rot at bedroom window sill, floor (20 sq. ft) frame, rear, porch. storage rooms, rear wall 50 sq. ft. (downstair) replace driveway / walkway 575 sq. ft.Details
kitchen & bathroom remodel (no structural work) repair dry rot at bedroom window sill, floor (20 sq. ft) frame, rear, porch. storage rooms, rear wall 50 sq. ft. (downstair) replace driveway / walkway 575 sq. ft. | $22,000 |
| Nov 20, 2008 | Completed final sign-off Mar 2009 | 471 11th Av | add a new bedroom, study room, storage and convert existing laundry area into new 1/2 bath, office at ground floor. revising existing stair from 2nd floor to backyard towards back.. convert e bath at 2nd floor into 2 baths, exchange refrigeration and stove location at 2nd fl.Details
add a new bedroom, study room, storage and convert existing laundry area into new 1/2 bath, office at ground floor. revising existing stair from 2nd floor to backyard towards back.. convert e bath at 2nd floor into 2 baths, exchange refrigeration and stove location at 2nd fl. | $30,000 |
| Jul 22, 2008 | Expired or cancelled expired Aug 2010 | 21 Caire Tr | kitchen & 2 bathrooms remodeling: no structural work. replace wall & base cabinets plumbing & light fixtures.Details
kitchen & 2 bathrooms remodeling: no structural work. replace wall & base cabinets plumbing & light fixtures. | $15,000 |
| Feb 22, 2008 | Completed final sign-off Nov 2008 | 174 Lowell St | remodel (e)kitchen, bath room and add one bathroom at 1st floor. construct one bathroom, family room, one full bath, one toilet room and remodel one (e) bedroom at ground floor.Details
remodel (e)kitchen, bath room and add one bathroom at 1st floor. construct one bathroom, family room, one full bath, one toilet room and remodel one (e) bedroom at ground floor. | $58,000 |
| Oct 2, 2007 | Completed final sign-off May 2008 | 26 Dorantes Av | remodel kitchen and bathroom. lighting comply with title 24Details
remodel kitchen and bathroom. lighting comply with title 24 | $14,000 |
| Aug 27, 2007 | Completed final sign-off Mar 2008 | 2011 45th Av | kitchen remodel ground floor to add (n) full-bath and (n) interior stairs. remove non-bearing wall to expand (e) kitchen on 2nd floor. replacement in kind windows at rear and side of the building.Details
kitchen remodel ground floor to add (n) full-bath and (n) interior stairs. remove non-bearing wall to expand (e) kitchen on 2nd floor. replacement in kind windows at rear and side of the building. | $20,000 |
| Apr 20, 2007 | Completed final sign-off Sep 2007 | 2 Bob Kaufman Al | all work to be done @ 2 bob kaufman al. remodel kitchen. replace cabinets & countertop. remodel bathroom: replace toilet & bathtub. replace 6 windows. not visible from street.Details
all work to be done @ 2 bob kaufman al. remodel kitchen. replace cabinets & countertop. remodel bathroom: replace toilet & bathtub. replace 6 windows. not visible from street. | $8,000 |
| Mar 20, 2007 | Never finaled issued Mar 2007, no final | 3332 Clay St | update the current bathroom. change the tub to shower. replace sin facuet & toilet. refinish hardwood flooring. apply new interior paint to the unit. no structural changes. provide flourscent light or occupancy sensor in bathroom.Details
update the current bathroom. change the tub to shower. replace sin facuet & toilet. refinish hardwood flooring. apply new interior paint to the unit. no structural changes. provide flourscent light or occupancy sensor in bathroom. | $7,000 |
| Feb 27, 2007 | Completed final sign-off Jul 2007 | 3330 Clay St | the top unit# a: replace floor tile in the bathroom area & kitchen area. replace bathroom sink. repaint cabinets. add 1 countertop to match (e). unit# b : replace bathroom & kitchen floor tile. repaint cabinet.Details
the top unit# a: replace floor tile in the bathroom area & kitchen area. replace bathroom sink. repaint cabinets. add 1 countertop to match (e). unit# b : replace bathroom & kitchen floor tile. repaint cabinet. | $30,000 |
| Jan 12, 2007 | Expired or cancelled expired Nov 2009 | 1833 21st Av | interior remodel 1st floor remodel kitchen, bathroom, & toilet room, new cabinet, countertop, sink. to comply with nov#200786937. no change on lighting.Details
interior remodel 1st floor remodel kitchen, bathroom, & toilet room, new cabinet, countertop, sink. to comply with nov#200786937. no change on lighting. | $15,000 |
| Jul 14, 2001 | Completed final sign-off Nov 2002 | 224 Wayland St | 2 story addition to rear of existing 2 story residence including 3 bedrooms 1 bath 1 laundryDetails
2 story addition to rear of existing 2 story residence including 3 bedrooms 1 bath 1 laundry | $45,000 |