Back to kitchen remodel contractors
Wong Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Apr 2000 to May 2026
- Last 24 months
- 15 permits filed
278 permits since 2000: 245 completed, 6 in progress, 10 never finaled, 17 expired or cancelled.
Of the 10 never-finaled permits, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 16 completed, 2 never finaled. Typically 10 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2025 | Completed final sign-off Apr 2026 | 827 38th Av | replace plaster with 5/8" type x sheet rock throughout 2nd fl. use 5d cooler nails (or screws) at 4" on center. all rooms and corridors on 2nd floor except kitchen and bathroom. no work in bathroom and kitchen.Details
replace plaster with 5/8" type x sheet rock throughout 2nd fl. use 5d cooler nails (or screws) at 4" on center. all rooms and corridors on 2nd floor except kitchen and bathroom. no work in bathroom and kitchen. | $18,000 |
| Apr 11, 2025 | Completed final sign-off Aug 2025 | 1115 Taylor St | unit 4: replace plaster w/ drywall, replace kitchen cabinets, repair bathroom leakDetails
unit 4: replace plaster w/ drywall, replace kitchen cabinets, repair bathroom leak | $20,000 |
| Mar 25, 2025 | Completed final sign-off Apr 2026 | 827 38th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. installing gas line. | $38,000 |
| Mar 8, 2024 | Completed final sign-off Oct 2024 | 295 Divisadero St | install general ventilation system, remodel kitchen & bar.Details
install general ventilation system, remodel kitchen & bar. | $150,000 |
| May 31, 2022 | Completed final sign-off Sep 2022 | 1293 Green St | remove wall in the kitchen and enlarge bathroom on the third floor.Details
remove wall in the kitchen and enlarge bathroom on the third floor. | $24,000 |
| Aug 20, 2021 | Completed final sign-off Jun 2022 | 566 Lombard St | work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framingDetails
work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framing | $120,000 |
| Jun 9, 2021 | Completed final sign-off Mar 2022 | 678 Green St | remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood.Details
remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood. | $75,000 |
| May 21, 2021 | Completed final sign-off Apr 2022 | 1287 Green St | remove walls on the 1st fl. remove wall to open up kitchen area. no changes to g/f except new post and foundationDetails
remove walls on the 1st fl. remove wall to open up kitchen area. no changes to g/f except new post and foundation | $25,000 |
| Feb 6, 2018 | Completed final sign-off Feb 2022 | 754 35th Av | interior remodel 1st and 2nd fl. relocate kitchen, add 1 bathDetails
interior remodel 1st and 2nd fl. relocate kitchen, add 1 bath | $60,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 295 Divisadero St | change of use permit separate (appln #201708104541). installation of commercial kitchen and retail bakery. existing entries and bathrooms to remain. no exterior alteration.Details
change of use permit separate (appln #201708104541). installation of commercial kitchen and retail bakery. existing entries and bathrooms to remain. no exterior alteration. | $49,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2018 | 1512 Kirkham St | add a study room, install insulation at exterior walls roof to create a study room. remodel kitchen and bath. replace interior damaged sheetrockDetails
add a study room, install insulation at exterior walls roof to create a study room. remodel kitchen and bath. replace interior damaged sheetrock | $20,000 |
| Apr 5, 2016 | Never finaled issued Apr 2018, no final | 1335 Mariposa St | convert suite (2) guest room w/o kitchen (not dwelling) to apartment by addiding kitchen. transfer guest room status to aprtment. merge #6 & #7 into (1) apartment, remove (1) kitchen. cancel guest room status & notice of special restriction (nsr).Details
convert suite (2) guest room w/o kitchen (not dwelling) to apartment by addiding kitchen. transfer guest room status to aprtment. merge #6 & #7 into (1) apartment, remove (1) kitchen. cancel guest room status & notice of special restriction (nsr). | $25,000 |
| May 12, 2015 | Completed final sign-off Feb 2016 | 295 Divisadero St | change of use from m to b. new ada bathroom, new kitchenette.Details
change of use from m to b. new ada bathroom, new kitchenette. | $30,000 |
| Jul 29, 2014 | Never finaled issued Sep 2014, no final | 758 Jackson St | interior remodel of apt 102. convert 5 room apt to 3 room apt by creating a single space for kitchen, dining, living room. the bathroom is remodeled. new elec, plumb. sheetrock walls and ceiling. new hardwood floor. all windows replace with double glazing.Details
interior remodel of apt 102. convert 5 room apt to 3 room apt by creating a single space for kitchen, dining, living room. the bathroom is remodeled. new elec, plumb. sheetrock walls and ceiling. new hardwood floor. all windows replace with double glazing. | $95,000 |
| Nov 3, 2006 | Completed final sign-off Dec 2006 | 825 Clement St | replace kitchen sink, cabinet. replace sink in the bathroom. replace tile on wall and linoleum flooring. paint the entire unit (one bedroom unit). replace carpet. no change in lighting. work on 825 only. 1 unit 825 only.Details
replace kitchen sink, cabinet. replace sink in the bathroom. replace tile on wall and linoleum flooring. paint the entire unit (one bedroom unit). replace carpet. no change in lighting. work on 825 only. 1 unit 825 only. | $13,800 |
| May 26, 2006 | Completed final sign-off Oct 2006 | 1043 Minna St | remodeling inside the unit, replace kitchen cabinet. new ceremic tile for bathroom. new bath. tub. install insulation for outside wall (r-13 insul) (2nd floor unit)Details
remodeling inside the unit, replace kitchen cabinet. new ceremic tile for bathroom. new bath. tub. install insulation for outside wall (r-13 insul) (2nd floor unit) | $25,000 |
| Sep 30, 2004 | Completed final sign-off Nov 2004 | 1041 Stockton St | repair crack ceiling & paint in kitchen, reinstall waterheater flue up to roof, this corrective workDetails
repair crack ceiling & paint in kitchen, reinstall waterheater flue up to roof, this corrective work | $2,500 |
| Jul 12, 2004 | Completed final sign-off Sep 2004 | 315 Kearny St | replace clay tile in the kitchen, also replace some dry rot plywood.Details
replace clay tile in the kitchen, also replace some dry rot plywood. | $6,300 |