Block 0270, lot 005
319 Kearny St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 3
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 3,242 sq ft
- Lot
- 1,110 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2008 | Completed final sign-off Nov 2008 | 319 Kearny St | revision to pa# 2007/06/19/4402 to relocate restroom and offices in basement. reconfigure basement floor plan, ex. partition wall previously proposed to be removed to remain. change opening direction for the front entry door on the ground floor.Details
revision to pa# 2007/06/19/4402 to relocate restroom and offices in basement. reconfigure basement floor plan, ex. partition wall previously proposed to be removed to remain. change opening direction for the front entry door on the ground floor. | $5,000 | |
| Jun 19, 2007 | Completed final sign-off Nov 2008 | 319 Kearny St | Gerard Gibbons | remodel existing salon on 2nd and 3rd flrs. restaurant of 1st floor and basement area to provide for new beauty school. voluntaray installation of new accessible ada elevator to provide accessibility to all floors. connect 2nd and 3rd floors with newDetails
remodel existing salon on 2nd and 3rd flrs. restaurant of 1st floor and basement area to provide for new beauty school. voluntaray installation of new accessible ada elevator to provide accessibility to all floors. connect 2nd and 3rd floors with new | $175,000 |
| Jul 12, 2004 | Never finaled issued Jul 2004, no final | 315 Kearny St | street spaceDetails
street space | ||
| Jul 12, 2004 | Completed final sign-off Sep 2004 | 315 Kearny St | Wong Construction Inc | replace clay tile in the kitchen, also replace some dry rot plywood.Details
replace clay tile in the kitchen, also replace some dry rot plywood. | $6,300 |
| Nov 17, 2003 | Completed final sign-off Sep 2004 | 301 Kearny St | Wong Construction Inc | umb retrofitting- bolts plus w/irreg. correctedDetails
umb retrofitting- bolts plus w/irreg. corrected | $38,000 |
| Oct 27, 2003 | Completed final sign-off Sep 2004 | 315 Kearny St | Wong Construction Inc | seismic retrofitting/general procedures adn access/ complianceDetails
seismic retrofitting/general procedures adn access/ compliance | $49,000 |
| Aug 7, 2002 | Never finaled issued Aug 2002, no final | 315 Kearny St | sidewalkDetails
sidewalk | ||
| Dec 14, 2001 | Completed final sign-off Sep 2004 | 301 Kearny St | umb-seismic upgrade work. incl new frames concrete wall, fastings steel strap. general procedure.Details
umb-seismic upgrade work. incl new frames concrete wall, fastings steel strap. general procedure. | $190,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Wong Construction Inc (3), Gerard Gibbons
- Engineers
- Albert Urrutia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.