Back to bathroom remodel contractors
Wong Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Apr 2000 to May 2026
- Last 24 months
- 15 permits filed
278 permits since 2000: 245 completed, 6 in progress, 10 never finaled, 17 expired or cancelled.
Of the 10 never-finaled permits, 5 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 24 completed, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Sep 2026 | 901 Irving St | revision to pa# 202603278474: add new ada bath and remove (e) posts in the ground floor.Details
revision to pa# 202603278474: add new ada bath and remove (e) posts in the ground floor. | $20,000 |
| Apr 17, 2025 | Completed final sign-off Apr 2026 | 2142 44th Av | at 1st floor, add (n) addition @ rear for (n) bedroom and new deck porch. modify (e) bedroom to bath and walk-in.Details
at 1st floor, add (n) addition @ rear for (n) bedroom and new deck porch. modify (e) bedroom to bath and walk-in. | $98,000 |
| Apr 14, 2025 | Completed final sign-off Apr 2026 | 827 38th Av | replace plaster with 5/8" type x sheet rock throughout 2nd fl. use 5d cooler nails (or screws) at 4" on center. all rooms and corridors on 2nd floor except kitchen and bathroom. no work in bathroom and kitchen.Details
replace plaster with 5/8" type x sheet rock throughout 2nd fl. use 5d cooler nails (or screws) at 4" on center. all rooms and corridors on 2nd floor except kitchen and bathroom. no work in bathroom and kitchen. | $18,000 |
| Apr 11, 2025 | Completed final sign-off Aug 2025 | 1115 Taylor St | unit 4: replace plaster w/ drywall, replace kitchen cabinets, repair bathroom leakDetails
unit 4: replace plaster w/ drywall, replace kitchen cabinets, repair bathroom leak | $20,000 |
| Mar 25, 2025 | Completed final sign-off Apr 2026 | 827 38th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. installing gas line. | $38,000 |
| Apr 11, 2024 | Completed final sign-off Jul 2024 | 2185 Fillmore St | enlarge ada bathroom in the 1st floor.Details
enlarge ada bathroom in the 1st floor. | $30,000 |
| Jan 10, 2023 | Completed final sign-off Aug 2023 | 566 Lombard St | unit #2: remodel kithchen and bathroom, removal of some interior walls reinforce floor due to removal of walls, add new bedroomDetails
unit #2: remodel kithchen and bathroom, removal of some interior walls reinforce floor due to removal of walls, add new bedroom | $60,000 |
| May 31, 2022 | Completed final sign-off Sep 2022 | 1293 Green St | remove wall in the kitchen and enlarge bathroom on the third floor.Details
remove wall in the kitchen and enlarge bathroom on the third floor. | $24,000 |
| May 19, 2022 | Completed final sign-off Oct 2022 | 1600 Vallejo St | rev to pa 201809140338 commercial: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor.Details
rev to pa 201809140338 commercial: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor. | |
| May 19, 2022 | Completed final sign-off Oct 2022 | 1600 Vallejo St | rev to pa 201809140341 residential: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor.Details
rev to pa 201809140341 residential: revise shear walls in the basement level and first floor and relocate ada bathroom on first floor. | |
| Aug 20, 2021 | Completed final sign-off Jun 2022 | 566 Lombard St | work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framingDetails
work to be performed in unit 3, 566 lombard and unit 5, 570 lombard demolition, remodel and rebuild of (e) kitchens, dining bed and bathrooms; including new walls, doors, applicances, fixtures and casework. new structural (seismic) framing | $120,000 |
| Jun 9, 2021 | Completed final sign-off Mar 2022 | 678 Green St | remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood.Details
remodel of 4th floor residential unit. convert living room to 2nd bedroom. remodel 1 bath and 1 kitchen replace (6) windows (2 facing st same loc). replace one door (facing st same size & loc.. windows 102 + 106 to be aluminum clad wood. | $75,000 |
| Apr 7, 2021 | Completed final sign-off Feb 2022 | 756 35th Av | new bldg: revision to app#201805159092. revise interior layouts, add 1 bathroom on 2nd floor. add 1 bedroom and 1 shower on 3rd floor.Details
new bldg: revision to app#201805159092. revise interior layouts, add 1 bathroom on 2nd floor. add 1 bedroom and 1 shower on 3rd floor. | |
| Nov 7, 2018 | Completed final sign-off Jan 2019 | 1325 Mason St | add 2 ada bathrooms on the 1st fl.Details
add 2 ada bathrooms on the 1st fl. | $40,000 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 1112 Larkin St | revise 20180529035 to reduce size of windows in bathrooms, adjacent to lightwell on all floors, where occurs. 6 windows size 3'x 2'.Details
revise 20180529035 to reduce size of windows in bathrooms, adjacent to lightwell on all floors, where occurs. 6 windows size 3'x 2'. | |
| May 2, 2018 | Completed final sign-off Feb 2022 | 754 35th Av | interior remodel at garage level to include one bedroom and a full bath. replace extg foundation.Details
interior remodel at garage level to include one bedroom and a full bath. replace extg foundation. | $60,000 |
| Feb 6, 2018 | Completed final sign-off Feb 2022 | 754 35th Av | interior remodel 1st and 2nd fl. relocate kitchen, add 1 bathDetails
interior remodel 1st and 2nd fl. relocate kitchen, add 1 bath | $60,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 295 Divisadero St | change of use permit separate (appln #201708104541). installation of commercial kitchen and retail bakery. existing entries and bathrooms to remain. no exterior alteration.Details
change of use permit separate (appln #201708104541). installation of commercial kitchen and retail bakery. existing entries and bathrooms to remain. no exterior alteration. | $49,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2018 | 1512 Kirkham St | add a study room, install insulation at exterior walls roof to create a study room. remodel kitchen and bath. replace interior damaged sheetrockDetails
add a study room, install insulation at exterior walls roof to create a study room. remodel kitchen and bath. replace interior damaged sheetrock | $20,000 |
| Jul 11, 2016 | Completed final sign-off Dec 2019 | 4334 Fulton St | legalization of (e) ground floor unit (1 bedroom & 1 bath) per ordinance# 43-14. installing nfpa 13-r compliant sprinklers under separate permit.Details
legalization of (e) ground floor unit (1 bedroom & 1 bath) per ordinance# 43-14. installing nfpa 13-r compliant sprinklers under separate permit. | $600 |
| May 12, 2015 | Completed final sign-off Feb 2016 | 295 Divisadero St | change of use from m to b. new ada bathroom, new kitchenette.Details
change of use from m to b. new ada bathroom, new kitchenette. | $30,000 |
| Jul 29, 2014 | Never finaled issued Sep 2014, no final | 758 Jackson St | interior remodel of apt 102. convert 5 room apt to 3 room apt by creating a single space for kitchen, dining, living room. the bathroom is remodeled. new elec, plumb. sheetrock walls and ceiling. new hardwood floor. all windows replace with double glazing.Details
interior remodel of apt 102. convert 5 room apt to 3 room apt by creating a single space for kitchen, dining, living room. the bathroom is remodeled. new elec, plumb. sheetrock walls and ceiling. new hardwood floor. all windows replace with double glazing. | $95,000 |
| Jul 2, 2008 | Expired or cancelled expired Jul 2009 | 1430 Stockton St | work @ unit# 1430 only. comply with complaint# 200860850, dated 06/16/08.repair cracks in walls & ceiling in living room & replace tiles in bath.Details
work @ unit# 1430 only. comply with complaint# 200860850, dated 06/16/08.repair cracks in walls & ceiling in living room & replace tiles in bath. | $1,500 |
| Nov 3, 2006 | Completed final sign-off Dec 2006 | 825 Clement St | replace kitchen sink, cabinet. replace sink in the bathroom. replace tile on wall and linoleum flooring. paint the entire unit (one bedroom unit). replace carpet. no change in lighting. work on 825 only. 1 unit 825 only.Details
replace kitchen sink, cabinet. replace sink in the bathroom. replace tile on wall and linoleum flooring. paint the entire unit (one bedroom unit). replace carpet. no change in lighting. work on 825 only. 1 unit 825 only. | $13,800 |
| May 26, 2006 | Completed final sign-off Oct 2006 | 1043 Minna St | remodeling inside the unit, replace kitchen cabinet. new ceremic tile for bathroom. new bath. tub. install insulation for outside wall (r-13 insul) (2nd floor unit)Details
remodeling inside the unit, replace kitchen cabinet. new ceremic tile for bathroom. new bath. tub. install insulation for outside wall (r-13 insul) (2nd floor unit) | $25,000 |
| May 9, 2002 | Completed final sign-off Feb 2003 | 331 Cherry St | remodel/enlarge ground fl unit#333b : kit/bath, relocate water heaters, new utility rm, rebuild woodDetails
remodel/enlarge ground fl unit#333b : kit/bath, relocate water heaters, new utility rm, rebuild wood | $42,000 |