Block 1237, lot 001
295 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 7
- Rooms
- 8 bathrooms
- Building
- 6,144 sq ft
- Lot
- 3,200 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2024 | Completed final sign-off Oct 2024 | 295 Divisadero St | Wong Construction Inc, C T W Mechanical | install general ventilation system, remodel kitchen & bar.Details
install general ventilation system, remodel kitchen & bar. | $150,000 |
| Mar 4, 2022 | Completed final sign-off Mar 2022 | 295 Divisadero St | 295-299 divisadero st: change from limited restaurant to full service restaurant. no construction interior or exterior.Details
295-299 divisadero st: change from limited restaurant to full service restaurant. no construction interior or exterior. | ||
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 1003 Page St | change administrative record only. no work. permit applies to unit at 1005 page - only and not to other residential units in building. registration of single intermidiate lenth occupancy dwelling unit (per cfc dated 6-15-11). cfc for unit 1005 page streetDetails
change administrative record only. no work. permit applies to unit at 1005 page - only and not to other residential units in building. registration of single intermidiate lenth occupancy dwelling unit (per cfc dated 6-15-11). cfc for unit 1005 page street | ||
| Aug 11, 2017 | Completed final sign-off Jan 2018 | 295 Divisadero St | Wong Construction Inc | comercial only: soft story retrofit per sfbc chapter 4d: 2016 cebc appendix a-4Details
comercial only: soft story retrofit per sfbc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2018 | 295 Divisadero St | Wong Construction Inc | residential only: soft story retrofit per sfbc chapter 4d: 2016 cebc appendix a-4Details
residential only: soft story retrofit per sfbc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 295 Divisadero St | change of use to limited restaurant "vegan retail bakery". seperate change of use & tenant improvement (ti) permits required by city planning. see building review & approval under ti permit #2017-0810-4544 for same scope of work.Details
change of use to limited restaurant "vegan retail bakery". seperate change of use & tenant improvement (ti) permits required by city planning. see building review & approval under ti permit #2017-0810-4544 for same scope of work. | ||
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 295 Divisadero St | Wong Construction Inc | change of use permit separate (appln #201708104541). installation of commercial kitchen and retail bakery. existing entries and bathrooms to remain. no exterior alteration.Details
change of use permit separate (appln #201708104541). installation of commercial kitchen and retail bakery. existing entries and bathrooms to remain. no exterior alteration. | $49,000 |
| Jul 26, 2017 | Expired or cancelled withdrawn Dec 2017 | 295 Divisadero St | change of use from vacant office to limited restaurant. plumbing for sinks & floor drains, counter build & seating. m.e.p. deferred submittalDetails
change of use from vacant office to limited restaurant. plumbing for sinks & floor drains, counter build & seating. m.e.p. deferred submittal | $49,000 | |
| Jan 29, 2016 | Completed final sign-off Feb 2016 | 295 Divisadero St | Wong Construction Inc | revised addendum (title 24) to pa 2015-0512-6090Details
revised addendum (title 24) to pa 2015-0512-6090 | |
| Sep 10, 2015 | Never finaled issued Sep 2015, no final | 295 Divisadero St | street spaceDetails
street space | ||
| Aug 14, 2015 | Completed final sign-off Feb 2016 | 295 Divisadero St | Wong Construction Inc | voluntary strengthen - plywood sheathing, holdown, anchor bolt and moment frame on the ground floor unit. (n) store frontDetails
voluntary strengthen - plywood sheathing, holdown, anchor bolt and moment frame on the ground floor unit. (n) store front | $55,000 |
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 295 Divisadero St | street spaceDetails
street space | ||
| May 12, 2015 | Completed final sign-off Feb 2016 | 295 Divisadero St | Wong Construction Inc | change of use from m to b. new ada bathroom, new kitchenette.Details
change of use from m to b. new ada bathroom, new kitchenette. | $30,000 |
| Mar 14, 2014 | Completed final sign-off Oct 2014 | 297 Divisadero St | replace kitchen cabinet, replace kitchen hood, repl new ceramic tile, repl toilet * bathrm sink with basic cabinet, repl ceramic tile on shower, repl in kind, no changes to doors or windowsDetails
replace kitchen cabinet, replace kitchen hood, repl new ceramic tile, repl toilet * bathrm sink with basic cabinet, repl ceramic tile on shower, repl in kind, no changes to doors or windows | $12,000 | |
| Mar 14, 2014 | Completed final sign-off Oct 2014 | 297 Divisadero St | replace windows-21 windows (19 visible to street) with wood material for visible facades.Details
replace windows-21 windows (19 visible to street) with wood material for visible facades. | $15,000 | |
| Jun 8, 2011 | Completed final sign-off Jun 2011 | 1003 Page St | Maddern Conrstruction Inc | revision to pa# 2007.10.04.4618. remove green house above unit d, fire rated window inside garage, modify the drainage layout at the roof deck and the window configuration at master bedroom in unit c ( window size were reduced)Details
revision to pa# 2007.10.04.4618. remove green house above unit d, fire rated window inside garage, modify the drainage layout at the roof deck and the window configuration at master bedroom in unit c ( window size were reduced) | |
| Sep 9, 2010 | Completed final sign-off Apr 2011 | 1003 Page St | K K Electric & Alarm Company | install a single system to monitor (central station) the sprinkler system.Details
install a single system to monitor (central station) the sprinkler system. | $1,000 |
| Aug 18, 2010 | Never finaled issued Aug 2010, no final | 1003 Page St | street spaceDetails
street space | ||
| Apr 26, 2010 | Completed final sign-off Jun 2011 | 1003 Page St | Bar Contractors Inc | revision to pa# 2009.11.04.0556. relocate fire sprinkler heads (8) in garageDetails
revision to pa# 2009.11.04.0556. relocate fire sprinkler heads (8) in garage | |
| Feb 19, 2010 | Never finaled issued Feb 2010, no final | 1003 Page St | street spaceDetails
street space | ||
| Nov 4, 2009 | Completed final sign-off Jun 2011 | 1003 Page St | Bar Contractors Inc | add 22 sprinkler heads at new addition construction ( 200710044618s-1, base on e sprinkler system app 8609033Details
add 22 sprinkler heads at new addition construction ( 200710044618s-1, base on e sprinkler system app 8609033 | $6,600 |
| Aug 7, 2009 | Completed final sign-off Aug 2010 | 1003 Page St | Maddern Conrstruction Inc | to complete work and obtain final inspection for work approved under pa # 200710165529Details
to complete work and obtain final inspection for work approved under pa # 200710165529 | $10,000 |
| Jun 23, 2009 | Completed final sign-off Jul 2009 | 1003 Page St | replace broken handrail on rear stairs, not visible from street, less than 50% to rebuildDetails
replace broken handrail on rear stairs, not visible from street, less than 50% to rebuild | $400 | |
| Apr 16, 2009 | Completed final sign-off Nov 2009 | 1003 Page St | Maddern Conrstruction Inc | to demolish detached garage (separate permit to extend existing building)Details
to demolish detached garage (separate permit to extend existing building) | $2,000 |
| Sep 29, 2008 | Never finaled issued Sep 2008, no final | 1003 Page St | street space permit. renewal 1158330.Details
street space permit. renewal 1158330. | ||
| Sep 3, 2008 | Never finaled issued Sep 2008, no final | 1003 Page St | street space & sidewalk repair.Details
street space & sidewalk repair. | ||
| Jun 20, 2008 | Never finaled issued Jun 2008, no final | 1003 Page St | street spaceDetails
street space | ||
| Jun 3, 2008 | Expired or cancelled expired Aug 2010 | 1003 Page St | interior remodel of the kitchen and bathroom of unit c on the 3rd floor. switch location of kitchen and bedroom.Details
interior remodel of the kitchen and bathroom of unit c on the 3rd floor. switch location of kitchen and bedroom. | $30,000 | |
| Feb 12, 2008 | Never finaled issued Mar 2008, no final | 1003 Page St | install a fire rated window with a 45 min rated in a 1 hour parapet. the window will be installed in front of an (e) window in an adjacent building. revision to pa# 200710165529, in compliance with ab-009Details
install a fire rated window with a 45 min rated in a 1 hour parapet. the window will be installed in front of an (e) window in an adjacent building. revision to pa# 200710165529, in compliance with ab-009 | $1,000 | |
| Oct 16, 2007 | Never finaled issued Oct 2007, no final | 1003 Page St | termite report for rear exterior staircase: dismantle stairs and remove all damaged wood. remove all damaged wood & repair with new material, rebuild staircase in kind. repair foundation @ rear of bldg. lay new slab on grade and install site drainage. no work to be done inside residential unit,Details
termite report for rear exterior staircase: dismantle stairs and remove all damaged wood. remove all damaged wood & repair with new material, rebuild staircase in kind. repair foundation @ rear of bldg. lay new slab on grade and install site drainage. no work to be done inside residential unit, | $40,000 | |
| Oct 4, 2007 | Completed final sign-off Jun 2011 | 1003 Page St | on the 2nd level, re-route entry to two dwelling units to enter from divisidero street, create new common vestibule, and provide fire- rated demising wall between units. on 3rd floor, merge two dwelling units. remodel exist lost unit.Details
on the 2nd level, re-route entry to two dwelling units to enter from divisidero street, create new common vestibule, and provide fire- rated demising wall between units. on 3rd floor, merge two dwelling units. remodel exist lost unit. | $200,000 | |
| Oct 4, 2007 | Never finaled filed Oct 2007, never issued | 1003 Page St | rebuild exterior stair remodel interior for unit relocation.Details
rebuild exterior stair remodel interior for unit relocation. | $100,000 | |
| Aug 21, 2007 | Expired or cancelled cancelled Jan 2026 | 1003 Page St | new non-illuminated 8'x10' sign on exterior - non-electric single faced wall sign 1" thick.Details
new non-illuminated 8'x10' sign on exterior - non-electric single faced wall sign 1" thick. | $1,700 | |
| Aug 20, 2007 | Never finaled issued Aug 2007, no final | 295 Divisadero St | Anthony Mowers | foundation-install new change of use from chiropractor office to yoga school. change out storefront, new door, new windowDetails
foundation-install new change of use from chiropractor office to yoga school. change out storefront, new door, new window | $30,000 |
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 295 Divisadero St | Anthony Mowers | remodle commercial unit make ada compliant entry and unisex bathroom, new stairway at rear office. all work at 1st floor commerical space.Details
remodle commercial unit make ada compliant entry and unisex bathroom, new stairway at rear office. all work at 1st floor commerical space. | $65,000 |
| May 25, 2007 | Never finaled issued May 2007, no final | 295 Divisadero St | undersignated commercial space use. demo permit to explore structural repairs. interior non structural demo only.Details
undersignated commercial space use. demo permit to explore structural repairs. interior non structural demo only. | $10,000 | |
| Oct 2, 2003 | Completed final sign-off Nov 2003 | 1005 Page St | comply w/nov #200343486:repair damaged railing on rear stairs, replace damaated siding, replace suppDetails
comply w/nov #200343486:repair damaged railing on rear stairs, replace damaated siding, replace supp | $1,600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Wong Construction Inc (7), Maddern Conrstruction Inc (3), Anthony Mowers (2), Bar Contractors Inc (2), C T W Mechanical, K K Electric & Alarm Company
- Architects
- John Lum Architects (7), Seth Ellsworth (3)
- Engineers
- Darren Wong (2), Fareed Himmati, Kung-Kay Chiu, Matthew Wang
- Pmt consultant/expediters
- Darren Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.