W. John Build-General Con
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 2 completed, 1 never finaled, 2 expired or cancelled. Typically 46 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2021 | Completed final sign-off Aug 2021 | 160 Parker Av | add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard.Details
add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard. | $235,000 |
| Jun 24, 2015 | Never finaled issued Mar 2016, no final | 150 15th Av | expand family room @ 2nd fl, (n) 2nd fl exterior deck & stair @ rear. expand 1st fl space to (e) rear facade, (n) roof deck @ 3rd fl above expansion. note: scope of work not visible from street.Details
expand family room @ 2nd fl, (n) 2nd fl exterior deck & stair @ rear. expand 1st fl space to (e) rear facade, (n) roof deck @ 3rd fl above expansion. note: scope of work not visible from street. | $80,000 |
| Feb 22, 2013 | Expired or cancelled expired Aug 2017 | 144 25th Av | 125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch.Details
125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch. | $120,000 |
| Sep 9, 2008 | Completed final sign-off Sep 2008 | 67 Bernard St | repair staircase stringers less than 50% of stairs to be repair.Details
repair staircase stringers less than 50% of stairs to be repair. | $8,000 |
| Jan 30, 2006 | Expired or cancelled expired Feb 2009 | 1378 23rd Av | removing extg stair case/grouting under north and south property line/work under permit #200505091911,200601252986,200601252984 for referance/all grout to be within drop lines of 1378 23rd aveDetails
removing extg stair case/grouting under north and south property line/work under permit #200505091911,200601252986,200601252984 for referance/all grout to be within drop lines of 1378 23rd ave | $5,000 |