Back to bathroom remodel contractors
W. John Build-General Con
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 16 completed, 4 expired or cancelled. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2021 | Completed final sign-off Aug 2021 | 160 Parker Av | add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard.Details
add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard. | $235,000 |
| Feb 28, 2020 | Completed final sign-off May 2020 | 731 Chestnut St | apt b. in revision to : pa#202002114077 - 1 window replacement in kind in (e) 3rd floor bathroom, same size, same location, not visible from street.Details
apt b. in revision to : pa#202002114077 - 1 window replacement in kind in (e) 3rd floor bathroom, same size, same location, not visible from street. | $3,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 731 Chestnut St | apt b. 1 kitchen & 2 bathroom remodel, painting, refinish (e) wood floor. no structural change.Details
apt b. 1 kitchen & 2 bathroom remodel, painting, refinish (e) wood floor. no structural change. | $30,000 |
| Aug 14, 2019 | Completed final sign-off Mar 2020 | 2200 Sacramento St | unit 705: remodel (e) ktichen & 2 bathrooms: add washer & dryer, new paint, flooring and closet.Details
unit 705: remodel (e) ktichen & 2 bathrooms: add washer & dryer, new paint, flooring and closet. | $100,000 |
| Feb 11, 2019 | Completed final sign-off Mar 2019 | 281 Monterey Bl | remodel existing bathroom, new tiles, sheetrock, paint, new lights, receptacles and plumbing fixtures.Details
remodel existing bathroom, new tiles, sheetrock, paint, new lights, receptacles and plumbing fixtures. | $17,000 |
| Dec 18, 2018 | Expired or cancelled cancelled Jan 2026 | 281 Monterey Bl | remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 storiesDetails
remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 stories | $20,000 |
| May 10, 2018 | Completed final sign-off Aug 2018 | 3340 Clay St | bathroom and bedroom remodel. paint. replace vanity sink, toilet and showerDetails
bathroom and bedroom remodel. paint. replace vanity sink, toilet and shower | $44,000 |
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 2200 Sacramento St | #1007- remodel 2 existing bathrooms, remodel kitchen, painting entire 1 bedroom unit, new wood flooring. all remodel works to be in kind. n/a ordinance $155-13Details
#1007- remodel 2 existing bathrooms, remodel kitchen, painting entire 1 bedroom unit, new wood flooring. all remodel works to be in kind. n/a ordinance $155-13 | $50,000 |
| Nov 14, 2016 | Completed final sign-off Mar 2017 | 3340 Clay St | master bathroom remodel, replace toilet & tub (n) shower, same location on all fixtures. (n) vanity & 2 sinks. (n) tile, rim & painting. no structural works. no walls to be altered.Details
master bathroom remodel, replace toilet & tub (n) shower, same location on all fixtures. (n) vanity & 2 sinks. (n) tile, rim & painting. no structural works. no walls to be altered. | $44,000 |
| May 15, 2013 | Completed final sign-off Jun 2013 | 716 05th Av | remodel existing bathroom, new shower, vanity, toilet, tile & fixtures, no structural change on 2nd flrDetails
remodel existing bathroom, new shower, vanity, toilet, tile & fixtures, no structural change on 2nd flr | $15,000 |
| Feb 22, 2013 | Expired or cancelled expired Aug 2017 | 144 25th Av | 125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch.Details
125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch. | $120,000 |
| Jun 30, 2011 | Completed final sign-off Sep 2011 | 150 15th Av | revision to pa# 2001-0614-8052-add new skylights in master bathroomDetails
revision to pa# 2001-0614-8052-add new skylights in master bathroom | |
| Jun 14, 2011 | Completed final sign-off Sep 2011 | 150 15th Av | demo and remodel of e master and kids bath. push bath into e lightwell and adjacent bedroom. neighbor approval includedDetails
demo and remodel of e master and kids bath. push bath into e lightwell and adjacent bedroom. neighbor approval included | $48,000 |
| Sep 10, 2009 | Completed final sign-off Dec 2009 | 3573 22nd St | renovate (e) kitchen, storage and bathroom with new cabinets, lighting and finishes. relocate bathroom and enlarge existing opening btn kitchen and dining rm. replace existing windows at rearDetails
renovate (e) kitchen, storage and bathroom with new cabinets, lighting and finishes. relocate bathroom and enlarge existing opening btn kitchen and dining rm. replace existing windows at rear | $83,000 |
| Mar 11, 2008 | Completed final sign-off May 2008 | 319 Arkansas St | existing bathroom remodel, new toilet, vanity, and shower. no structural work. replace exiting electrical fixtures.Details
existing bathroom remodel, new toilet, vanity, and shower. no structural work. replace exiting electrical fixtures. | $15,000 |
| Mar 5, 2008 | Completed final sign-off Aug 2008 | 73 06th Av | re-surface existing bathroom on 1st floor. tile shower surround & floor (bathrm). replace faucets & wall band base.Details
re-surface existing bathroom on 1st floor. tile shower surround & floor (bathrm). replace faucets & wall band base. | $3,000 |
| Dec 24, 2007 | Expired or cancelled expired Jun 2009 | 2200 Sacramento St | 1 kitchen, 2 bathroom remodel, interior painting, no structural work, bathroom lighting to be fluorescent or on occupancy sensor 50% of wattage of kitcehn lighting to be fluorescentDetails
1 kitchen, 2 bathroom remodel, interior painting, no structural work, bathroom lighting to be fluorescent or on occupancy sensor 50% of wattage of kitcehn lighting to be fluorescent | $60,000 |
| Dec 19, 2007 | Expired or cancelled expired Oct 2009 | 3340 Clay St | remodel of (e) 4th floor playroom, relocate bedroom to rear & reconfigure to provide for additional bedroom, reconfigure bath, new dormers & skylights, replace (e) single glazed windows (4) to dual glazed @ rear.Details
remodel of (e) 4th floor playroom, relocate bedroom to rear & reconfigure to provide for additional bedroom, reconfigure bath, new dormers & skylights, replace (e) single glazed windows (4) to dual glazed @ rear. | $150,000 |
| Feb 17, 2004 | Completed final sign-off Apr 2004 | 2744 Fulton St | kitchen & bathroom remodel add new acuzzi tub, (n) appliances & add (n) lites. no structural changeDetails
kitchen & bathroom remodel add new acuzzi tub, (n) appliances & add (n) lites. no structural change | $44,000 |
| Feb 10, 2003 | Completed final sign-off Apr 2004 | 2680 Diamond St | 2nd story addition above garage for home office guest room 2nd story addition above bath and pantryDetails
2nd story addition above garage for home office guest room 2nd story addition above bath and pantry | $110,000 |