W. John Build-General Con
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 2 expired or cancelled. Typically 167 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2018 | Expired or cancelled cancelled Jan 2026 | 281 Monterey Bl | remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 storiesDetails
remodel (e0 bathroom. remove 3rd story of (e) rear yard addition and convert to open deck/2 stories | $20,000 |
| Jul 5, 2016 | Completed final sign-off Aug 2017 | 48 Hill Point Av | horizontal extension. 48 sf expansion of exisitng office on 3/fl over existing deck.Details
horizontal extension. 48 sf expansion of exisitng office on 3/fl over existing deck. | $35,000 |
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 411 Clayton St | expand deck within building area, kitchen remodel and relocate powder room, expand lower level within footprint. maher-not req'dDetails
expand deck within building area, kitchen remodel and relocate powder room, expand lower level within footprint. maher-not req'd | $85,000 |
| Feb 22, 2013 | Expired or cancelled expired Aug 2017 | 144 25th Av | 125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch.Details
125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch. | $120,000 |