Back to kitchen remodel contractors
W. John Build-General Con
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 5 never finaled, 11 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 13 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2021 | Completed final sign-off Aug 2021 | 160 Parker Av | add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard.Details
add a studio unit within extg first floor bldg footprint. renovate extg second floor unit's kitchen, bathroom, and bedrooms, and add a bathroom, laundry closet, and spiral stair t back yard. | $235,000 |
| Sep 2, 2020 | Completed final sign-off Feb 2021 | 585 Eureka St | remodel kitchen. replace (e) cabinetry and appliances. emlarge (e) opening between kitchen & dining room. replace one previously approved (e) window with new code compliant 1-hour rated window of same size and location.Details
remodel kitchen. replace (e) cabinetry and appliances. emlarge (e) opening between kitchen & dining room. replace one previously approved (e) window with new code compliant 1-hour rated window of same size and location. | $50,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 731 Chestnut St | apt b. 1 kitchen & 2 bathroom remodel, painting, refinish (e) wood floor. no structural change.Details
apt b. 1 kitchen & 2 bathroom remodel, painting, refinish (e) wood floor. no structural change. | $30,000 |
| Aug 4, 2017 | Completed final sign-off Mar 2018 | 2200 Sacramento St | #1007- remodel 2 existing bathrooms, remodel kitchen, painting entire 1 bedroom unit, new wood flooring. all remodel works to be in kind. n/a ordinance $155-13Details
#1007- remodel 2 existing bathrooms, remodel kitchen, painting entire 1 bedroom unit, new wood flooring. all remodel works to be in kind. n/a ordinance $155-13 | $50,000 |
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 411 Clayton St | expand deck within building area, kitchen remodel and relocate powder room, expand lower level within footprint. maher-not req'dDetails
expand deck within building area, kitchen remodel and relocate powder room, expand lower level within footprint. maher-not req'd | $85,000 |
| Jan 13, 2014 | Never finaled issued Jan 2014, no final | 23 Winfield St | kitchen remodel new cabinets & counter, appliance & lights & flooring. no change to wall, no windows & no doors.Details
kitchen remodel new cabinets & counter, appliance & lights & flooring. no change to wall, no windows & no doors. | $15,000 |
| Feb 22, 2013 | Expired or cancelled expired Aug 2017 | 144 25th Av | 125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch.Details
125 sf horizontal additions at 1/fl. 1/fl kitchen, breakfast & powder remodel. 2/fl 2 bathroom remodels. new stair to grade from (e) 1/fl deck. replace (e) roof at entry porch. | $120,000 |
| Nov 22, 2010 | Completed final sign-off Jan 2011 | 2030 Broadway | rewire (e) kitchen cab. & counter, rewire some (e) appliances; replace with (n) kitchen cab. counter, & same appliancesl painting, (n) light fixtgures and plumbing fixturess; no structural work. at least 50% high efficacy lighting ( by wattage)Details
rewire (e) kitchen cab. & counter, rewire some (e) appliances; replace with (n) kitchen cab. counter, & same appliancesl painting, (n) light fixtgures and plumbing fixturess; no structural work. at least 50% high efficacy lighting ( by wattage) | $34,000 |
| Sep 10, 2009 | Completed final sign-off Dec 2009 | 3573 22nd St | renovate (e) kitchen, storage and bathroom with new cabinets, lighting and finishes. relocate bathroom and enlarge existing opening btn kitchen and dining rm. replace existing windows at rearDetails
renovate (e) kitchen, storage and bathroom with new cabinets, lighting and finishes. relocate bathroom and enlarge existing opening btn kitchen and dining rm. replace existing windows at rear | $83,000 |
| Jan 26, 2009 | Completed final sign-off Apr 2009 | 4037 23rd St | unit 4039 23rd street- renovate existing kitchen/laundry w/ new cabinets, electrical, lighting and finishes. enlarge opening between kitchen and dining room; and between kitchen and breakfast room. electrical/plumbing on separate permit.Details
unit 4039 23rd street- renovate existing kitchen/laundry w/ new cabinets, electrical, lighting and finishes. enlarge opening between kitchen and dining room; and between kitchen and breakfast room. electrical/plumbing on separate permit. | $47,000 |
| Dec 24, 2007 | Expired or cancelled expired Jun 2009 | 2200 Sacramento St | 1 kitchen, 2 bathroom remodel, interior painting, no structural work, bathroom lighting to be fluorescent or on occupancy sensor 50% of wattage of kitcehn lighting to be fluorescentDetails
1 kitchen, 2 bathroom remodel, interior painting, no structural work, bathroom lighting to be fluorescent or on occupancy sensor 50% of wattage of kitcehn lighting to be fluorescent | $60,000 |
| Sep 9, 2004 | Completed final sign-off Nov 2004 | 1101 Green St | kitchen remodel, new cabinets, applances, plumbing fixtures & flooringDetails
kitchen remodel, new cabinets, applances, plumbing fixtures & flooring | $35,000 |
| Jul 21, 2004 | Completed final sign-off Sep 2004 | 162 Parker Av | kitchen remodel on 2nd floor, no strcutural workDetails
kitchen remodel on 2nd floor, no strcutural work | $25,000 |
| May 18, 2004 | Completed final sign-off Oct 2005 | 1371 06th Av | 120 s.f. second story horizontal addition over existing kitchen prev. permitted work app # 8802133.Details
120 s.f. second story horizontal addition over existing kitchen prev. permitted work app # 8802133. | $25,000 |
| Feb 17, 2004 | Completed final sign-off Apr 2004 | 2744 Fulton St | kitchen & bathroom remodel add new acuzzi tub, (n) appliances & add (n) lites. no structural changeDetails
kitchen & bathroom remodel add new acuzzi tub, (n) appliances & add (n) lites. no structural change | $44,000 |
| Nov 15, 2001 | Never finaled issued Nov 2001, no final | 999 Green St | remodel:kitchen & bathrm remodel, new tiles & doors, painting no structural workDetails
remodel:kitchen & bathrm remodel, new tiles & doors, painting no structural work | $120,000 |
| Feb 4, 2000 | Completed final sign-off Aug 2000 | 999 Green St | remdoel kitchen, replace w/new doors,wood flooring,lighting,cabients,counterDetails
remdoel kitchen, replace w/new doors,wood flooring,lighting,cabients,counter |