Back to kitchen remodel contractors
Vsa Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Sep 2026
- Last 24 months
- 20 permits filed
64 permits since 2000: 42 completed, 5 in progress, 13 never finaled, 4 expired or cancelled.
Of the 13 never-finaled permits, 6 are 3 to 5 years old, 7 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 never finaled. Typically 4 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2026 | Completed final sign-off Aug 2026 | 1225 Clay St | unit #10: plumbing replace fixtures w/ new, new shower & toilet. electrical replace electrical fixtures repair old wiring. new floor, patch holes in walls new kitchen counter top. no exterior work, no layout mods, no structural work. work. work in-kind.Details
unit #10: plumbing replace fixtures w/ new, new shower & toilet. electrical replace electrical fixtures repair old wiring. new floor, patch holes in walls new kitchen counter top. no exterior work, no layout mods, no structural work. work. work in-kind. | $29,500 |
| Mar 13, 2026 | Completed final sign-off Jul 2026 | 1225 Clay St | unit#8: plumbing: replace fixtures w/ new shower & toilet. electrical: replace electrical fixtures, repair oldwiring building. new floor, patch holes in nails, new kitchen countertop. (all work in-kind)Details
unit#8: plumbing: replace fixtures w/ new shower & toilet. electrical: replace electrical fixtures, repair oldwiring building. new floor, patch holes in nails, new kitchen countertop. (all work in-kind) | $40,000 |
| Apr 15, 2025 | Completed final sign-off Apr 2025 | 674 Douglass St | lower level bathroom repairs, replace faucet and sink cabinet. replace broken tile floor and wall. paint. kitchen, replace kitchen cabinets, appliances, countertop in same locations.Details
lower level bathroom repairs, replace faucet and sink cabinet. replace broken tile floor and wall. paint. kitchen, replace kitchen cabinets, appliances, countertop in same locations. | $19,500 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1225 Clay St | in kind remodel of kitchen cabinets, sinks, stove, fridge. in kind remodel of bathroom, vanity with sink, door medicine cabinet, bathroom walls, tiles, floor, main room remodel of floor and hall paint and trim. (no wall demolition or construction)Details
in kind remodel of kitchen cabinets, sinks, stove, fridge. in kind remodel of bathroom, vanity with sink, door medicine cabinet, bathroom walls, tiles, floor, main room remodel of floor and hall paint and trim. (no wall demolition or construction) | $55,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2025 | 1655 Revere Av | add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested.Details
add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested. | $150,000 |
| Feb 7, 2020 | Completed final sign-off Jun 2020 | 1266 Guerrero St | remove and replace kitchen cabinets, countertop, sink. tile kitchen, kitchen floor. remove and replace tile sink vanities and plumbing fixtures for 2 baths. repair in sheetrock on sitting room and bedroom walls. paintDetails
remove and replace kitchen cabinets, countertop, sink. tile kitchen, kitchen floor. remove and replace tile sink vanities and plumbing fixtures for 2 baths. repair in sheetrock on sitting room and bedroom walls. paint | $20,000 |
| Aug 9, 2019 | Completed final sign-off Oct 2019 | 389 Fair Oaks St | due to floodwater damage - replace 75% of kitchen cabinets, 250 sq. ft. of drywall/wall insulation, new wall base, paint, reinstall (e) appliances & gas cooktop, 5/8" type x gyp board. no alteration of wall.Details
due to floodwater damage - replace 75% of kitchen cabinets, 250 sq. ft. of drywall/wall insulation, new wall base, paint, reinstall (e) appliances & gas cooktop, 5/8" type x gyp board. no alteration of wall. | $40,000 |
| Jun 17, 2019 | Never finaled issued Jan 2022, no final | 674 Douglass St | upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows.Details
upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows. | $300,000 |
| Feb 13, 2018 | Completed final sign-off Sep 2018 | 3856 21st St | bathrooms (4) replace tile, replace fixtures in existing location. kitchen replace cabinets. replace countertop. replace appliances. paint exterior front back.Details
bathrooms (4) replace tile, replace fixtures in existing location. kitchen replace cabinets. replace countertop. replace appliances. paint exterior front back. | $175,000 |