Vsa Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Sep 2026
- Last 24 months
- 20 permits filed
64 permits since 2000: 42 completed, 5 in progress, 13 never finaled, 4 expired or cancelled.
Of the 13 never-finaled permits, 6 are 3 to 5 years old, 7 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 1 in progress, 1 expired or cancelled. Typically 848 days from filing to permit and 671 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 641 Los Palmos Dr | install new structural steel columns and beams. new concrete pad to reinforce existing deck above existing steel column to remainDetails
install new structural steel columns and beams. new concrete pad to reinforce existing deck above existing steel column to remain | $30,000 |
| Apr 7, 2023 | Expired or cancelled suspend May 2023 | 629 Los Palmos Dr | 2nd flr remodel: reconfigure master bedroom & bathroom, enclose deck partially for new pray room.Details
2nd flr remodel: reconfigure master bedroom & bathroom, enclose deck partially for new pray room. | $12,000 |
| Nov 19, 2019 | Completed final sign-off Apr 2026 | 628 Shotwell St | interior alteration to remodel existing fire damaged sfd with 5 bedrooms and 2 bathrooms to become a 5 bedroom, 4.5 bathroom sfd. proposed scope includes new 2nd unit, new foundation and excavation (approx 310 cu yd) at floor 1 and seismic upgrade. (n) rear deck.Details
interior alteration to remodel existing fire damaged sfd with 5 bedrooms and 2 bathrooms to become a 5 bedroom, 4.5 bathroom sfd. proposed scope includes new 2nd unit, new foundation and excavation (approx 310 cu yd) at floor 1 and seismic upgrade. (n) rear deck. | $488,000 |