Back to bathroom remodel contractors
Vsa Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Sep 2026
- Last 24 months
- 20 permits filed
64 permits since 2000: 42 completed, 5 in progress, 13 never finaled, 4 expired or cancelled.
Of the 13 never-finaled permits, 6 are 3 to 5 years old, 7 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2025 | Completed final sign-off Apr 2025 | 674 Douglass St | lower level bathroom repairs, replace faucet and sink cabinet. replace broken tile floor and wall. paint. kitchen, replace kitchen cabinets, appliances, countertop in same locations.Details
lower level bathroom repairs, replace faucet and sink cabinet. replace broken tile floor and wall. paint. kitchen, replace kitchen cabinets, appliances, countertop in same locations. | $19,500 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1225 Clay St | in kind remodel of kitchen cabinets, sinks, stove, fridge. in kind remodel of bathroom, vanity with sink, door medicine cabinet, bathroom walls, tiles, floor, main room remodel of floor and hall paint and trim. (no wall demolition or construction)Details
in kind remodel of kitchen cabinets, sinks, stove, fridge. in kind remodel of bathroom, vanity with sink, door medicine cabinet, bathroom walls, tiles, floor, main room remodel of floor and hall paint and trim. (no wall demolition or construction) | $55,000 |
| Apr 7, 2023 | Expired or cancelled suspend May 2023 | 629 Los Palmos Dr | 2nd flr remodel: reconfigure master bedroom & bathroom, enclose deck partially for new pray room.Details
2nd flr remodel: reconfigure master bedroom & bathroom, enclose deck partially for new pray room. | $12,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2025 | 1655 Revere Av | add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested.Details
add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested. | $150,000 |
| Jun 24, 2020 | Completed final sign-off Jul 2021 | 2774 California St | all work in kind. remove and replace tile,vanity, plumbing & electrical fixtures for 4 baths. no rough plumbing or electrical work. install new hardwood fl on 2 levels. repair cracks & holes in plaster wall on 2 levels & hallway. paint interior of house.Details
all work in kind. remove and replace tile,vanity, plumbing & electrical fixtures for 4 baths. no rough plumbing or electrical work. install new hardwood fl on 2 levels. repair cracks & holes in plaster wall on 2 levels & hallway. paint interior of house. | $35,000 |
| Feb 7, 2020 | Completed final sign-off Jun 2020 | 1266 Guerrero St | remove and replace kitchen cabinets, countertop, sink. tile kitchen, kitchen floor. remove and replace tile sink vanities and plumbing fixtures for 2 baths. repair in sheetrock on sitting room and bedroom walls. paintDetails
remove and replace kitchen cabinets, countertop, sink. tile kitchen, kitchen floor. remove and replace tile sink vanities and plumbing fixtures for 2 baths. repair in sheetrock on sitting room and bedroom walls. paint | $20,000 |
| Nov 19, 2019 | Completed final sign-off Apr 2026 | 628 Shotwell St | interior alteration to remodel existing fire damaged sfd with 5 bedrooms and 2 bathrooms to become a 5 bedroom, 4.5 bathroom sfd. proposed scope includes new 2nd unit, new foundation and excavation (approx 310 cu yd) at floor 1 and seismic upgrade. (n) rear deck.Details
interior alteration to remodel existing fire damaged sfd with 5 bedrooms and 2 bathrooms to become a 5 bedroom, 4.5 bathroom sfd. proposed scope includes new 2nd unit, new foundation and excavation (approx 310 cu yd) at floor 1 and seismic upgrade. (n) rear deck. | $488,000 |
| Jun 17, 2019 | Never finaled issued Jan 2022, no final | 674 Douglass St | upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows.Details
upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows. | $300,000 |
| May 7, 2019 | Completed final sign-off Jan 2020 | 443 42nd Av | revision to pa 2017-0825-5955 - 3rd fl master bathroom layout & location of skylight. add skylight along property line w/30" parapetDetails
revision to pa 2017-0825-5955 - 3rd fl master bathroom layout & location of skylight. add skylight along property line w/30" parapet | $500 |
| Feb 13, 2018 | Completed final sign-off Sep 2018 | 3856 21st St | bathrooms (4) replace tile, replace fixtures in existing location. kitchen replace cabinets. replace countertop. replace appliances. paint exterior front back.Details
bathrooms (4) replace tile, replace fixtures in existing location. kitchen replace cabinets. replace countertop. replace appliances. paint exterior front back. | $175,000 |
| Aug 25, 2017 | Completed final sign-off Jan 2020 | 443 42nd Av | rear horizontal addition on the ground and second floor and one story vertical addition on the 3rd floor to an existing 2 story residential, add 2 additional bath and 1 additonal bedDetails
rear horizontal addition on the ground and second floor and one story vertical addition on the 3rd floor to an existing 2 story residential, add 2 additional bath and 1 additonal bed | $300,000 |