Block 0221, lot 037
1225 Clay St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 10
- Rooms
- 6 bedrooms, 10 bathrooms
- Building
- 8,418 sq ft
- Lot
- 3,358 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | Completed final sign-off Jul 2026 | 1225 Clay St | Vsa Construction | unit#8: plumbing: replace fixtures w/ new shower & toilet. electrical: replace electrical fixtures, repair oldwiring building. new floor, patch holes in nails, new kitchen countertop. (all work in-kind)Details
unit#8: plumbing: replace fixtures w/ new shower & toilet. electrical: replace electrical fixtures, repair oldwiring building. new floor, patch holes in nails, new kitchen countertop. (all work in-kind) | $40,000 |
| Mar 13, 2026 | Completed final sign-off Aug 2026 | 1225 Clay St | Vsa Construction | unit #10: plumbing replace fixtures w/ new, new shower & toilet. electrical replace electrical fixtures repair old wiring. new floor, patch holes in walls new kitchen counter top. no exterior work, no layout mods, no structural work. work. work in-kind.Details
unit #10: plumbing replace fixtures w/ new, new shower & toilet. electrical replace electrical fixtures repair old wiring. new floor, patch holes in walls new kitchen counter top. no exterior work, no layout mods, no structural work. work. work in-kind. | $29,500 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1225 Clay St | Vsa Construction | in kind remodel of kitchen cabinets, sinks, stove, fridge. in kind remodel of bathroom, vanity with sink, door medicine cabinet, bathroom walls, tiles, floor, main room remodel of floor and hall paint and trim. (no wall demolition or construction)Details
in kind remodel of kitchen cabinets, sinks, stove, fridge. in kind remodel of bathroom, vanity with sink, door medicine cabinet, bathroom walls, tiles, floor, main room remodel of floor and hall paint and trim. (no wall demolition or construction) | $55,000 |
| Dec 8, 2023 | Completed final sign-off Sep 2024 | 1225 Clay St | in-kind remodel of ktichen: cabinets, sink, stove, fridge, floor. in kind remodel of bathroom: vanity with sink, doors, med cabinet, bathtub, walls tiles, floor. main room remodel of floor and wall point and trimsDetails
in-kind remodel of ktichen: cabinets, sink, stove, fridge, floor. in kind remodel of bathroom: vanity with sink, doors, med cabinet, bathtub, walls tiles, floor. main room remodel of floor and wall point and trims | $20,000 | |
| Dec 6, 2011 | Expired or cancelled expired Jan 2013 | 1225 Clay St | Glassall Incorporatedal | #10 - replace of 9 windows to comply with nov#201152688 item #6 dated 8-19-2011. not visable from street, no structural work, u factor =0.40 max.Details
#10 - replace of 9 windows to comply with nov#201152688 item #6 dated 8-19-2011. not visable from street, no structural work, u factor =0.40 max. | $5,126 |
| Sep 3, 2002 | Completed final sign-off Sep 2002 | 1225 Clay St | Chao's Brother Electric | replace the counter panel of bldg fire alarm systemDetails
replace the counter panel of bldg fire alarm system | $1,400 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.